Midas Gold Completes Positive Preliminary Economic Assessment for Golden Meadows Project, Idaho Study Demonstrates Potential for Robust, Long-life, Low Cost Gold Production with Antimony Credits

Resource Estimates Technical Reports (NI 43-101) Economic Studies

Suite 1250 � 999 West Hastings Street � Vancouver � BC � CANADA � V6C 2W2 � Tel: 1.778.724.4700 � Fax: 1.604.558.4700

September 04, 2012 #2012-21

Midas Gold Completes Positive Preliminary Economic Assessment for Golden Meadows Project, Idaho Study Demonstrates Potential for Robust, Long-life, Low Cost Gold Production with Antimony Credits

VANCOUVER, BRITISH COLUMBIA – Midas Gold Corp. (MAX:TSX) today announced the results of an independent, National Instrument 43-101 compliant Preliminary Economic Assessment (“PEA” or “Study”) completed on its Golden Meadows Project (the “Project”) in Idaho as summarized in Table 1 below. The purpose of the Study was to (a) provide a preliminary concept for the scale and type of mining project that the Golden Meadows Project could support, (b) identify options and alternatives for consideration by Midas Gold in consultation with regulators, governments, communities and other interested parties, (c) identify areas where additional work is required before a pre-feasibility study (“PFS”) can be completed, and (d) demonstrate potential for positive economic returns that would support continued investment in the Golden Meadows Project. With this Study in hand, Midas Gold intends to actively engage with interested parties to evaluate potential options and considerations for the possible development of this large scale, long life mining operation in order to manage and mitigate impacts and ensure the sustainability of Midas Gold’s activities.

The Golden Meadows property has been the site of extensive open pit and underground mining for almost 100 years and, as such, has seen considerable disturbance and environmental impact. Midas Gold’s approach to the conceptual design of this project has been to select economic approaches and alternatives that mitigate and minimize the results of its proposed activities, to remediate considerable amounts of legacy disturbance and to develop a closure and reclamation concept that leaves the site with enhanced fisheries, wetlands and other productive environmental attributes. Midas Gold plans to engage with regulators, governments, communities, tribes, non-governmental agencies and other interested parties to consider the options identified in the PEA, to evaluate reasonable alternatives and to develop preferred options that can be incorporated into a future PFS and, if warranted, the permitting process for a full-scale mining operation.

Table 1: Preliminary Economic Assessment Highlights, Golden Meadows Project, Idaho(1)

(Base Case, at US$1,400/oz of gold)

Years 1-8Life-Of-Mine (14.2 years)
AnnualTotalAnnualTotal
AverageAverage
Payable Gold (K oz)3903,1213484,922
Payable Antimony (M lbs)9.979.36.490.6
Cash Costs (US$/oz)(2) (Net of by-product credits)331425
Initial Capital (US$M)879
Pre-tax NPV (US$M) 5%2,136
After-tax NPV (US$M) 5%1,482
IRR (Pre-tax/After-tax)33.7%/27.2%
After-tax Payback (Production Years)3.0

(1) In this release, “M” = million, “K” = thousands, all amounts in US$

(2) See non-IFRS measures below

“This Preliminary Economic Assessment demonstrates potential for a robust, long life, low cost mining operation at Golden Meadows that could be in the lowest quartile of global gold producers,” said Stephen Quin, President and CEO of Midas Gold Corp. “The Study provides the basis for us to engage the various interested parties in discussions related to the options and scenarios laid out, and to work with them to determine the optimal and preferred options. The Golden Meadows Project represents a tremendous opportunity to create significant long term, well paid employment in an economically depressed part of Idaho, generate a substantial stream of revenue to county, state and federal governments, to remediate and improve the environmental sustainability of this heavily disturbed site, and to create attractive returns for our shareholders,” he said. “With a positive Study in hand, we have the basis from which to enter into meaningful discussions with interested parties to ensure we understand their perspectives, collect their input and consider options to improve and enhance the conceptual plan laid out in the PEA.”

Conference Call, Webcast and Conferences

Midas Gold will be hosting a conference call and webcast to discuss highlights of the PEA at 7:00 AM PDT on Wednesday September 5, 2012. Details are provided toward the end of this news release.

Midas Gold is also attending and presenting at the Precious Metals Summit in Vail, Colorado, on September 6- 7, 2012, and is attending the Gold Forum in Denver, Colorado, September 9-12, 2012.

Preliminary Economic Assessment

The PEA was compiled by SRK Consulting (Canada) Inc. (“SRK”) who was engaged by Midas Gold Corp.’s wholly owned subsidiary, Midas Gold, Inc. (“MGI”), to evaluate potential options for the conceptual development of a mine at the Golden Meadows Project based on information available up to the date of the Study. Ausenco Solutions Canada Inc. (infrastructure and mineral processing); Blue Coast Metallurgy Ltd. (metallurgy); RTR Resource Management, Inc. (permitting and social and environmental considerations), and JDS Energy and Mining Inc. (project management and economic analysis) also contributed to the Study. Additional details are provided in a technical report to be filed on SEDAR by mid-September 2012.

Midas Gold instructed SRK and the other Study contributors to conduct the PEA with the sustainable operation and long-term reclamation of the Project as a key design consideration, with the intent to build a project that would eventually result in an improvement of the environmental conditions that currently exist at Golden Meadows due to historic mining in the area.

The PEA summarized in this news release is intended to provide only an initial, high-level review of the Project potential and design options, which is preliminary in nature. The PEA mine plan and economic model include

the use of Inferred resources. Inferred resources are considered to be too speculative geologically to be used in an economic analysis except as permitted under NI43-101 in PEA studies. There is no guarantee that Inferred resources can be converted to Indicated or Measured resources, and as such, there is no certainty the Project economics described herein will be realized.

Project Concept

The preliminary designs presented in the PEA are based on the recognition that the site has been previously extensively mined and thus considerations were made for economic feasibility, mitigation or cleanup of “targeted” legacy environmental issues, improvement of water quality, minimizing mining-related disturbance, and protection of the fishery during operations and on mine closure. In formulating the mine closure, consideration was given to re-establishment of the upstream fishery, backfilling open pits (when appropriate)

as part of waste management, and focusing meeting applicable water quality standards during operation with mechanical treatment and on passive water treatment for long term closure. Additional details of these considerations are provided in the ‘Environmental’, ‘Closure and Remediation’ and ‘Permitting’ sections below.

The Project, as currently envisioned, consists of three gold mineral resources with zones of antimony and silver mineralization located in an area of significant historic mining activity. Conventional open pit methods are recommended for mining the three deposits (Yellow Pine, Hangar Flats, and West End), all of which are located within three kilometres of each other.

The deposits contain oxide and sulphide mineralization that are contemplated to be treated with different extraction processes. The oxide material is amenable to milling and then vat leaching to recover gold and silver only. Sulphide materialization is recommended to be milled and treated with sequential flotation to produce two products: an antimony concentrate for off-site shipment to a third party smelter and a gold concentrate that would be further processed on site using pressure oxidation (POX) followed by vat leaching and cyanide destruction within the plant building to produce gold-silver doré.

Production is assumed to be nominally 20,000 t/d or 7.3 Mt/year of mill feed. With this assumed production rate, the mine life would be approximately 14.2 years, with approximately 101 Mt of material processed. The mine would have an overall strip ratio of 3.7 tonnes of waste rock per tonne of economic mineralized rock. Gold accounts for approximately 93% of the value of the payable metals, antimony accounts for about 7% of the payable value and silver has a negligible economic contribution.

Mineral Resources

Updated mineral resources were estimated for each of the three deposits that comprise the Golden Meadows Project. The mineral resource estimates are summarized in Table 2 below and were previously reported by deposit in news releases dated May 16, 2012, June 4, 2012 and June 27, 2012. Antimony and silver values were only estimated within certain limited sub-domains and are summarized in Table 3 below. As a result, the grades for these metals in Table 2 are reported averaged over the entire, much larger gold mineral resource volumes, which may underrepresent the overall grades for these metals.

Table 2: Mineral Resource Estimate(1) – All Three Deposits comprising the Golden Meadows Project, Idaho Prepared by SRK Consulting (Canada) Inc., June 25, 2012

Mineral Resource CategoryTonnes (000s)Gold Grade (g/t)Contained Gold (000s oz)Silver Grade(5) (g/t)Contained Silver (000s oz)Antimony Grade(4)(5) (%)Contained Antimony (000s lbs)
Open Pit Oxide(2) Mineral Resources
Indicated10,5730.903050.00-0.00%122
Inferred2,2010.97680.00-0.00%178
Open Pit Sulphide(3) Mineral Resources
Indicated67,6531.803,9250.601,3120.07%108,385
Inferred53,9171.632,8220.931,6030.08%92,606
Total Open Pit Oxide + Sulphide(2)(3) Mineral Resources
Indicated78,2261.684,2290.521,3120.06%108,507
Inferred56,1171.602,8900.891,6030.07%92,784

(1) Mineral resources are reported in relation to a conceptual pit shell. Mineral resources are not mineral reserves and do not have demonstrated economic viability – see “Compliance with NI43-101” below. All figures are rounded to reflect the relative accuracy of the estimate. All composites have been capped where appropriate.

(2) Open pit oxide mineral resources are reported at a cut-off grade of 0.42 g/t Au. Cut-off grades are based on a price of US$1,400 per ounce of gold and a number of operating cost and recovery assumptions, plus a 15% contingency (as detailed in June 27, 2012 news release).

(3) Open pit sulfide mineral resources are reported at a cut-off grade of 0.75 g/t Au. Cut-off grades are based on a price of US$1,400 per ounce of gold and a number of operating cost and recovery assumptions, plus a 15% contingency (as detailed in June 27, 2012 news release).

(4) Where antimony grades are shown as “0.00” there is antimony present but it rounds to 0.00.

(5) Antimony and silver were not estimated for the entire West End deposit and significant portions of the Hangar Flats and Yellow Pine deposits due to a lack of sufficient assays, and these un-estimated volumes are averaged into the totals at an assumed zero grade.

Table 3: Antimony Subdomains(1) Mineral Resource, Yellow Pine & Hangar Flats Deposits

Prepared by SRK Consulting (Canada) Inc., June 25, 2012 for the Golden Meadows Project, Idaho

Mineral Resource CategoryTonnes (000s)Gold Grade (g/t)Contained Gold (000s oz)Silver Grade (g/t)Contained Silver (000s oz)Antimony Grade (%)Contained Antimony (000s lbs)
Open Pit Sulphide(2) Mineral Resources
Indicated9,9992.317433.151,0120.49%108,507
Inferred8,6392.085765.041,4000.49%92,784

(1) Mineral resources are reported in relation to a conceptual pit shell. Mineral resources are not mineral reserves and do not have demonstrated economic viability – see “Compliance with NI43-101” below. All figures are rounded to reflect the relative accuracy of the estimate. All composites have been capped where appropriate.

(2) Open pit sulphide mineral resources are reported at a cut-off grade of 0.75 g/t Au. Cut-off grades are based on a price of US$1,400 per ounce of gold and a number of operating cost and recovery assumptions, plus a 15% contingency (see details below). The antimony subdomain is further limited to discrete zones of mineralization with grades that exceed 0.1% Sb.

Mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral resource estimates do not account for mineability, selectivity, mining loss and dilution. These mineral resource estimates include Inferred mineral resources that are normally considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as mineral reserves. There is also no certainty that these Inferred mineral resources will be converted to Measured and Indicated mineral resource categories through further drilling, or into mineral reserves once economic considerations are applied.

The mineral resource estimates for the Hangar Flats, West End, and Yellow Pine deposits were prepared by SRK as summarized herein. The economically driven pit shell that limits the mineral resource was based entirely on gold value, with antimony and silver reporting within the resource-limiting pit but not defining it. Within the resource-limiting pit, antimony and silver grades are reported without any cut-off. Any mineralization lying outside the resource-limiting pit is not reported as mineral resources.

Since the date of this mineral resource estimate, additional drilling has been completed, and is continuing to infill and extend the mineralization reported herein and updated mineral resource estimates are targeted for the end of Q1/13.

Conceptual Life-of-mine Open Pit Production Schedule

Individual conceptual mine plans were developed for each of the Hangar Flats, West End and Yellow Pine deposits. The conceptual Life-of-mine (“LOM”) plan is summarized in Table 4, which is attached at the end of this release. The mine plans utilized approximately 80% of the recently reported mineral resource for the Golden Meadows Project that is summarized above.

Processing

The gold in the three deposits comprising the Golden Meadows Project is primarily contained in pyrite and arsenopyrite, while the antimony is contained in stibnite, and silver in pyrite, arsenopyrite and stibnite. As a result, the mineralized material contemplated to be processed would be crushed, ground and sulphides recovered by sequential flotation of the stibnite and then, subsequently, the pyrite and arsenopyrite, yielding two concentrates. The mineralized material is considered to be of medium hardness, with bond ball mill work indexes ranging from 13.0 to 13.7kWh/t. The conceptual base case approach to the sulphide concentrates is for the stibnite (antimony, along with minor gold and silver) concentrate to be sold to third parties for processing, while the pyrite-arsenopyrite concentrate (containing the gold) will be pressure oxidized on site and gold recovered as doré. Based on metallurgical test work completed to date, recoveries utilized in the PEA are as set out in Table 5 below. The grade of the gold concentrate is designed to manage sulphur grades for onsite pressure oxidation; were the gold concentrates to be shipped off-site for processing, higher concentrations are achievable.

Table 5: Recoveries Utilized in PEA, Golden Meadows Project, Idaho

ProcessUnitsYellow PineHangar FlatsWest End
Sulphides with Recoverable Antimony Grades
Antimony Flotation
Concentrate grade Recovery% Sb %50 8050 80n/a n/a
Gold-bearing Sulphide Flotation
Concentrate grade Gold Flotation Recovery POX Residue Gold Extraction Overall Gold Recovery% Sulphur % % %10+ 88 98 8610+ 89 98 87n/a n/a n/a n/a
Sulphides Without Recoverable Antimony Grades
Gold-bearing Sulphide Flotation
Concentrate grade Recovery POX Residue Gold Extraction Overall Gold Recovery% Sulphur % % %10+ 93 98 9110+ 92 98 9010+ Variable (1) 98 Variable (1)
Oxides
Gold Leach Extraction%8080Variable (1)

(1) Depending on degree of oxidation

Indicative economic analysis shows that the slightly lower overall gold recovery in the material with recoverable antimony is more than offset by the recoverable, payable antimony values.

Tailings & Waste Rock Management

A total of 101 Mt (68.7 Mm3) of tailings are expected to be produced during the 14.2-year mine life of the recommended project. Based on results of current metallurgical test work and the recommended processing options, three separate tailings streams would be produced: oxide, POX, and flotation tailings. The geochemistry of the POX and oxide tailings suggests they may require containment within a lined facility, while the flotation tailings are considered to be relatively benign and could be placed in a separate unlined facility. However, the buffering capacity of the flotation tailings may serve to neutralize the POX tailings, and create a more benign product overall, which suggests that co-mingled tailings contained within a single, lined facility may be the better option. The recommended tailing storage facility (“TSF”) would consist of a lined basin and lined rock fill dam constructed in stages throughout the LOM. The downstream face of the rock fill dam would be buttressed by the waste rock facility (“WRF”), substantially reinforcing the dam. Waste rock from the mining operations at West End is recommended to be backfilled into the Yellow Pine pit. Other waste rock is recommended to be deposited in a designed WRF adjacent to the Hangar Flats deposit. In order to schedule waste placement within the waste facilities and isolate potential leachable material, a detailed waste management plan would be developed, including components of geochemical characterization, water management, and capping to limit infiltration.

Capital Costs

Capital costs (“CAPEX”) estimates were done based on Q3 2012, un-escalated U.S. dollars and are summarized in Table 6 below. Vendor quotes were obtained for all major equipment. Some of the costs were developed from first principles, while some were estimated based on factored references and experience with similar projects.

Table 6: Capital Cost Estimate, Golden Meadows Project

AreaDetailPre-productionSustainingTotal
(M$)(M$)(M$)
Direct CostsOpen Pit Mine121.9107.2229.1
Processing and Utilities243.079.6322.6
On-site Infrastructure93.138.8131.9
Off-site Infrastructure67.00.067.0
Indirect Costs148.919.4168.3
Owner’s Costs39.70.039.7
Closure Costs0.053.053.0
CAPEX Without Contingency713.6298.01,011.6
Contingency (variable)165.74.7170.4
TOTAL CAPEX ESTIMATE with Contingency879.4302.61,182.0

Operating Costs

Operating cost estimates (“OPEX”) were done based on Q3 2012, un-escalated U.S. dollars and are summarized in Table 7 below. Most costs were developed from first principles, although some were estimated based on factored references and experience with similar projects.

Table 7: Operating Cost Estimate, Golden Meadows Project

ItemUnit Cost Estimate
$/t Mined$/t MilledCash Cost(2) $/Au
ounce Payable
Mining1.67(1)7.78160
Mineral Processing13.94287
General and Administration4.1485
Total (without by-product credits)25.86532
Total (with by-product credits)425

(1) Excluding pre-strip (Year -1) mining which is captured as a capital cost

(2) see non-IFRS measures below

In the first eight years of operation, cash costs without by-product credits average US$479 per payable ounce of gold, and just US$331 per payable oz of gold after by-product credits are applied (see non-IFRS measures below).

Costs were independently estimated for oxides, low-antimony sulphides and high-antimony sulphides, as set out in Table 8 below.

Table 8: Operating Cost Estimate by Type of Mineralization, Golden Meadows Project

ItemUnitCombinedOxideSulphideHigh Sb
Mining ($1.67/tonne mined*)$/t milled7.787.787.787.78
Stockpile material handling$/t milled0.130.130.130.13
Crushing and Grinding$/t milled2.832.832.832.83
Oxide Processing$/t oxide milled0.825.53
Sb Flotation$/t high Sb milled0.281.66
Au Flotation$/t sulphide milled1.772.082.08
POX$/t sulphide milled7.879.239.23
Water Management$/t milled0.250.250.250.25
General and Administrative$/t milled4.144.144.144.14
Total25.8620.6626.4428.10
  • Excluding pre-strip (Year -1) mining which is captured as a capital cost

Production Schedule

Based on the conceptual mining schedule for the three deposits and recoveries summarized above, Table 9 sets out the estimated contained and payable metals over the life-of mine and is attached at the end of this release.

Economic Analysis

The economic assessment in the PEA is preliminary in nature and uses inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves, and there is no certainty that this PEA will be realized. The inferred mineral resource used in the mine plan is 37% of the total life-of-mine mineral resource.

Four potential cash flow cases were studied using metal prices summarized in Table 10 below. All cash flow cases used the same mineral resource estimate, mine plan and production factors, as shown in Table 11 below.

Table 10: Metal Price Assumptions for the Four Economic Cases, Golden Meadows PEA

CaseGold Price ($/ounce)SilverAntimonyBasis
PricePrice
($/ounce)($/pound)
Case A1,20020.005.50Gold price used in the mine optimization. The gold price is approximately the 5-year trailing average to the end of July 2012.
Case B (Base Case)1,40023.506.00Approximate three-year trailing average gold price to the end of July 2012.
Case C1,60027.006.50Approximate eighteen-month trailing average gold price to the end of July 2012.
Case D1,80030.007.00An upside case to show project potential at a gold price about 12% higher than prices at the end of July 2012.

Table 11: Summary of Production – All Cases, Golden Meadows PEA

ItemUnitValue
LOM PRODUCTION
Waste MinedMt372
Mineralized Material MinedMt101
Strip Ratio (Waste tonnes:mineralized material tonnes)t:t3.7
Daily Mill Throughputt/d20,000
Annual Mill ThroughputMt7.3
Mine LifeProduction Years14.2
MILL HEAD GRADE - OVERALL
Goldg/t Au1.72
Silverg/t Ag1.60
Antimony% Sb0.08
Oxide Process
TonnesMt15.0
Goldg/t Au1.05
Silverg/t Ag0.10
Gold Flotation Process (excluding Antimony Flotation)
TonnesMt69.0
Goldg/t Au1.75
Silverg/t Ag0.42
Sb Flotation Process (>0.1% Sb only)
TonnesMt17.4
Goldg/t Au2.18
Silverg/t Ag0.67
Antimony% Sb0.45
CONCENTRATE PRODUCTION
ItemUnitValue
Antimony Concentratedry metric tonnes126,474
LOM PAYABLE METAL
GoldKoz4,922
SilverKoz335
AntimonyKlb90,618

The results of the economic analysis are summarized in Table 12 below.

Table 12: Economic Results by Case, Golden Meadows PEA

ParameterUnitPre-tax ResultsAfter-tax
Results
CaseA ($1,200/ounce Au, $5.50/pound Sb, $20.00/ounce Ag)
NPV 0% NPV 5% IRR Payback periodM$ M$ % Production years2,549 1,464 27 2.81,874 1,036 22 3.7
Case B ($1,400/ounce Au, $6.00/pound Sb, $23.50/ounce Ag) – Base Case
NPV 0% NPV 5% IRR Payback periodM$ M$ % Production years3,580 2,136 34 2.32,557 1,482 27 3.0
Case C ($1,600/ounce Au, $6.50/pound Sb, $27.00/ounce Ag)
NPV 0% NPV 5% IRR Payback periodM$ M$ % Production years4,611 2,808 40 1.93,233 1,923 32 2.6
Case D ($1,800/ounce Au, $7.00/pound Sb, $30.00/ounce Ag)
NPV 0% NPV 5% IRR Payback periodM$ M$ % Production years5,642 3,480 46 1.73,910 2,364 36 2.3

The contribution to the project economics, by metal, is about 93% from gold, 7% from antimony, and less than 1% from silver.

Using a discount rate of 5%, the after-tax break-even gold price for the project is $880/ounce gold (63% of the Case B gold price) assuming no contribution from antimony or silver.

Sensitivity Analysis

Sensitivity analyses were performed using metal prices, mill head grade, CAPEX, and OPEX as variables. The value of each variable was changed plus and minus 20% independently while all other variables were held constant. The results of the sensitivity analyses are shown in Table 13 below.

Table 13: Sensitivity Analysis – All Cases, Golden Meadows PEA

CaseVariableAfter-tax NPV (M$) 5%
-20% Variance0% Variance20% Variance
Case ACAPEX OPEX Metal Price or Grade1,176 1,242 4361,036 1,036 1,036889 816 1,593
Case B (Base Case)CAPEX1,6191,4821,344
OPEX1,6831,4821,277
Metal Price or Grade8281,4822,122
Case CCAPEX OPEX Metal Price or Grade2,060 2,124 1,1931,923 1,923 1,9231,786 1,721 2,652
Case DCAPEX OPEX Metal Price or Grade2,501 2,565 1,5472,364 2,364 2,3642,227 2,163 3,181

Economic Impacts

The economic analysis set out in the PEA also provides some indications of the potential economic impact of the Golden Meadows Project on the local, Idaho and US economies, should the future work and permitting support development of a mining operation. Highlights include:

• Direct employment of more than 400 people during the three-year construction phase and 425 people during the subsequent 14.2 year operating phase at annual salaries estimated to average more than double the average 2010 census reported salaries for Idaho;

  • A study by the University of Idaho estimates 2.5 times as many community-based jobs are likely to be dependent on each direct job at such a mine, with such jobs related to contracting, transportation, services and other support activities;

• An average annual payroll of $20 million during the conceptual 14.2 year life of mine;

• Gross investment of approximately over $500 million in capital equipment and equipment manufacturing during the construction phase, with an additional $200 million or more during operations, the substantial majority of which is expected to be sourced from within the United States; and, • Approximately $1,023 million in direct taxes to all levels of government, including payments to the local county ($3 million), State ($220 million) and Federal ($800 million) governments over the 14.2 year operating life of the project, but excluding payroll taxes, state sales taxes and income taxes paid by employees.

MGI is already having a significant impact on the local economy, with upwards of 115 people directly employed or working with contractors on site in 2011 and 146 so far in 2012, making MGI the largest private sector employer in Valley County, more than 70% of whom reside in the State of Idaho and almost half are from Valley and adjacent Adams counties. MGI has also been able to utilize a significant number of contractors and suppliers from within Valley and Adams counties and the State of Idaho, with an estimated 85% of its project expenditures being spent in Idaho, approximately half of which is being spent with local entities.

Environmental

Midas Gold and MGI recognize the importance of protecting the environment and, to facilitate the development of a sustainable project, Midas Gold established the following environmental objectives for the Project:

  • Protect surface and ground water quality;
  • Protect and enhance the fishery;
  • Maintain or enhance the objectives of CERCLA-ordered environmental improvements;
  • Minimize potential for sedimentation and spills along transportation corridors; and
  • Incorporate environmental enhancement opportunities into the conceptual concurrent and final reclamation plans.

In order to achieve Midas Gold’s and MGI’s objectives, SRK has incorporated the following design considerations, from an environmental perspective, into the recommended Project:

  • Minimize the project footprint – the concepts of backfilling pits, where practical, and concentrating tailings storage in one location (rather than multiple smaller locations) are high priorities for design. Minimizing the footprint enables better protection of water quality and simpler, more effective water management.
  • Management of water – a comprehensive water management strategy to minimize and reuse water supplies in order to support in-stream flow requirements for important fish species has been developed for additional study as part of this PEA.
  • Management of waste – the waste management plan for the project involves the potential for segregation and selective handling and placement of potentially reactive waste rock, and storage of flotation, oxide, and POX tailings in a synthetically lined facility. Further, blending of the plus 90% by volume, inert flotation material with the small volume POX tailings, is expected to chemically neutralize any residues in the POX tailings.
  • Reduce contact of Project infrastructure (including roads in particular) with waterways – The conceptual design presented in this PEA of an alternate road corridor to the Project site would move the main transportation route away from much of the environmentally sensitive Johnson Creek & South Fork of the Salmon River (“SFSR”) waterways.
  • Enhance the fishery – The environmental design also involves the creation of three fish spawning reaches in the East Fork of the SFSR (“EFSFSR”) above the planned Yellow Pine pit, backfilling of the Yellow Pine pit, and construction of a new channel through the backfilled area that would provide fish passage into the upper reaches of the EFSFSR and Meadow Creek drainage areas that are currently inaccessible due to the steep gradient within the abandoned Yellow Pine pit.
  • Clean up past environmental degradation – Selective environmental clean-up projects would be considered as part of the overall mine plan, where feasible; additional reclamation treatments at the historic spent ore disposal area (“SODA”) is an example of this opportunity.
  • Management of air quality – The use of the best practice control technology and practices to control air emissions at the site would be employed.
  • Environmental Monitoring – Monitoring to ensure compliance with all applicable air, water, waste, and reclamation objectives and to validate the effectiveness of water treatment and best management practice (BMP) technologies is a fundamental component of the Project.

Closure and Remediation

The conceptual closure plan is focused on effective remediation of a considerable area degraded by historic mining practices (including waste dumps, abandoned pits, leach pads, former mill and smelter location, etc.) by re-mining areas of past disturbance, creating substantially improved containment, and managing waste materials in fully engineered and contained facilities. The conceptual closure plan would create more than 60 hectares of new wetlands, restore local drainages, reopen fish pathways along the EFSFSR south of the current Yellow Pine pit lake to migratory species (including salmon), and create three fisheries enhancement habitats. In addition, all newly-generated waste would be covered and planted to create sustainable vegetative cover.

Recognizing that there is already substantial disturbance from extensive past open pit and underground mining within its Golden Meadows project boundaries, over the past several years Midas Gold has undertaken a series of voluntary remediation efforts to mitigate the on-going impact of legacy environmental disturbance, including reclaiming more than five acres of ground disturbed prior to Midas Gold’s involvement in the area, planting 5,000 trees in 2011 (with a further 7,800 scheduled for planting in the fall of 2012) to reduce suspended solids run-off, application of dust suppression materials to almost seven miles of public roads, and replaced or repaired numerous culverts and other stream crossings, all of which has helped to reduce the sediment loading of local drainages, enhancing the downstream water quality and fish habitat.

Permitting

Midas Gold has developed an integrated plan to address the potential Environmental Impact Statement (“EIS”) and the potential regulatory process for any new mining operation, should such be warranted after the additional recommended work and further studies are completed. The plan considers: (a) environmental baseline study needs, (b) MGI’s ultimate "preferred alternative" to be described in the PFS, (c) a concurrent EIS and permitting schedule, (d) environmental risk management strategy, including “offsets” to potential impacts, and (e) an internal management program driven by scheduling milestones and cost tracking.

Substantial existing environmental baseline information generated by previous operators and governmental agencies is being confirmed and supplemented by MGI. This baseline is a compilation of previous studies and several EIS conducted for recent mining operations, remedial cleanup investigations, and multiple resource agency inventories. The new supplemental studies by MGI are aimed at describing ‘current mining’ environmental conditions at the site.

Project Risks & Opportunities

Aside from the risks typical of all large scale mining projects, such as confidence in mineral resource estimates, metallurgical performance, capital and operating cost increases, commodity price decreases, etc., the principal Project risks identified in the PEA include the following:

1. Ability to acquire a mining permit while maintaining an reasonable development timeline;

2. Success in converting Inferred resources to Measured or Indicated categories; and

3. The ability to attract and retain experienced professionals given the competitive state of the global mining industry.

Excluding the typical opportunities for such a mining project as that conceptualized in the PEA, such as higher metal prices, lower costs, etc., a number of specific opportunities have been identified at Golden Meadows and include the following: