Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PPTA.TO ·

Midas Gold - High Grade Results from 2017 Drill Program, Stibnite Gold Project, Idaho MGI-17-425 intersects 3.2g/t Au, 36.1g/t Ag & 1.2% Sb (6.2g/t AuEq(2)) over 50.3m MGI-17-426 intersects 3.2g/t Au, 3.9g/t Ag (3.4g/t AuEq(2)) over 33.5m

Drill Results

Page 1 of 5

NEWS RELEASE

September 07, 2017

#2017-10

Midas Gold - High Grade Results from 2017 Drill Program, Stibnite Gold Project, Idaho

MGI-17-425 intersects 3.2g/t Au, 36.1g/t Ag & 1.2% Sb (6.2g/t AuEq(2)) over 50.3m

MGI-17-426 intersects 3.2g/t Au, 3.9g/t Ag (3.4g/t AuEq(2)) over 33.5m

and 2.2g/t Au, 3.3g/t Ag & 0.14% Sb (2.6g/t AuEq(2)) over 60.1m

VANCOUVER, BRITISH COLUMBIA – Midas Gold Corp. (MAX:TSX / MDRPF:OTCQX) today provided additional

results from its 2017 drilling program at the Stibnite Gold Project, Idaho. The drilling program was designed to

enhance the m ineral resources defined in the December 2014 preliminary feasibility study (“PFS”) , and to

undertake geotechnical testing of pit walls and infrastructure areas. Positive results from the final two holes in the

resource optimization program, completed at the Hangar Flats deposit, are reported below.

Recent Assay Results – Hangar Flats Deposit, Stibnite Gold Project

Hole-ID Type Bearing Inclination

TD From To Width Au Ag Sb AuEq

(m) (m) (m) (m)(1) (g/t)(1) (g/t) (%) (g/t)(2)

MGI-17-425 Core 254 -45.5 222.5 35.6 46.2 10.6 1.39 0.9 0.01 1.4

and 79.8 86.0 6.1 1.71 1.2 0.00 1.7

and 107.3 157.6 50.3 3.22 36.1 1.22 6.2

including 143.9 157.6 13.7 4.75 100.2 3.33 12.7

and 191.1 203.3 12.2 2.05 14.9 1.37 5.0

MGI-17-426 Core 258 -56.0 260.6 93.6 104.2 10.7 1.74 1.0 0.00 1.8

and 144.3 177.9 33.5 3.16 3.9 0.08 3.4

and 183.1 243.2 60.1 2.23 3.3 0.14 2.6

including 218.3 241.4 23.1 3.68 3.4 0.23 4.2

MGI-17-427 Core 355 -40.0 107.0 No significant intercepts - geotechnical hole

(1) Gold composites are generated using a 0.5 g/t Au cutoff grade. Antimony composites are generated using a 0.1% Sb

cutoff grade. Composites may include intervals below cutoff grades. True widths are expected to be approximately 90-100% of

the reported intercept.

(2) Gold equivalent grades are reported for illustrative purposes only and are calculated using metal prices of $1200/oz Au,

$17/oz Ag and $7600/tonne Sb and do not include recovery, transportation, refining or payability. These factors will vary for

each metal, ore type and processing method and will affect the economic importance of the various metals.

These most recent results comprise assays from two HQ dia meter oriented core holes totalling 483 meters

(1,585 feet) drilled for infill and mineral resource conversion purposes, and a single HQ diameter core hole totaling

107 meters (351 feet) drilled for geotechnical purposes.

“Our drilling program, initiated in September 2016, continues to provide positive results that support Midas Gold’s

goal of enhancing mineral resources prior to feasibility level engineering for the Stibnite Gold Project,” said

Stephen Quin, President & CEO of Midas Gold Corp. “These latest intercepts from the Hangar Flats deposit further

demonstrate the potential to upgrade inferred mineral resources within the PFS pit limits from a cost centre to a

source of revenue. Inferred mineral resources were previousl y treated as development rock in the PFS project

economics, as required under NI43 -101. The higher-grade nature of these intercepts should provide an attractive

margin if these areas are classified as mineral reserves in the feasibility study currently in process.”

Resource Optimization Drilling

The two infill holes targeted inferred mineral resources within the Hangar Flats PFS pit shell situated adjacent to

former Meadow Creek Mine underground workings , which produced approximately 51,000 ounces Au at an

Page 2 of 5

average grade of 5.8 g/t Au between 1928 and 1938. The gold-antimony mineralization intersected in MGI-17-425

and -426 is representative of the high-grade, disseminated mineralization occurring adjacent to the underground

workings that was left behind by historical operators. These two holes confirmed the continuity and structural

controls of the high-grade mineralization inferred in this area , as well as the geometry of the underground levels

and stopes. Both infill holes contain higher gold grades than predicted (by the PFS block mode l) but over slightly

narrower widths. Geological models are currently being refined in preparation for updated resource estimates and

feasibility study mine planning.

Geotechnical Drilling

In addition to the mineral resource enhancement drilling program, three geotechnical drill holes totalling 489

meters have been completed in the Hangar Flats deposit as part of the ongoing 2017 geotechnical drilling program.

The goal of the geotechnical drilling program is to collect additional oriented core data for pit slope optimization

and to complete subsurface investigations in proposed infrastructure areas. Drilling subsequently shifted from core

to auger drilling for geotechnical purposes, with the auger being used to test and sample unconsolidated material

in proposed infrastructure areas.

Details of the previous news releases, the Project and the 2014 PFS can be found filed under Midas Gold’s profile

on SEDAR (www.sedar.com) or at www.midasgoldcorp.com.

To view a cross section and the locations of drill holes reported in this news release , please see the figures at the

end of this release.

For further information about Midas Gold Corp., please contact:

Liz Monger -- Manager, Investor Relations

(t): 778.724.4704

(e): [email protected]

www.facebook.com/midasgoldidaho

@MidasIdaho

www.midasgoldcorp.com

Sampling Procedures, Quality Control and Quality Assurance

The technical information in this news release has been prepared in accordance with Canadian regulatory

requirements set out in National Instrument 43 -101 ("NI43-101") and reviewed and approved by Stephen P. Quin,

P. Geo., President and CEO of Midas Gold Corp., and a Qualified Person. The exploration activities at the Stibnite

Gold Project were carried out under the supervision of Kent Turner, C.P.G., Qualified Person and Consultant for the

Stibnite Gold Project. T&J Enterprises, Inc. of Frenchtown MT was contracted for drilling utilizing an AR -65 core

drill with HQ3 core with a diameter of 61.1 mm (2-1/2”). A ll holes were drill oriented using an ACT III core

orientation tool from International Directional Services; LLC of Chandler , AZ. Core was photographed in the core

barrel split inner tube, marked for orientation and discontinuities meas ured at the drill site and then recovery and

RQD were measured, and logged for rock lithology, alteration, mineralization, and structure . The core was boxed,

photographed in the core box, with sample intervals selected on approximately 1.52 meter (5 foot) intervals,

which were then marked for cutting and sampled. One half t he core was col lected for assay a nd the second half

retained in the core box for archival purposes.

All gold assays are by a 30g Fire Assay charge followed by an atomic absorption finish (with a 0.005g/t lower

reporting limit). Samples reporting values > 6g/t gold are r e-analyzed using a 30g Fire Assay charge followed by a

gravimetric finish. Silver is analyzed via a 4 -acid digestion followed by an ICP finish (with a 0.5g/t lower reporting

limit). Samples reporting values > 10g/t silver are reanalyzed using a 50g Fire As say charge followed by a

gravimetric finish. Antimony is analyzed via a 4 -Acid digestion with ICP finish with a 5g/t lower reporting limit.

Samples reporting values >500g/t antimony are reanalyzed using XRF fusion. Some intervals may not add or

subtract co rrectly due to rounding, but differences are deemed insignificant. Analyses are carried out by ALS

Chemex in their Reno and Elko, Nevada and Vancouver, British Columbia laboratories. Umpire samples are

routinely submitted to third party labs and blank and standard samples are inserted at appropriate intervals and

Page 3 of 5

used for quality assurance and quality control and a review of the results of analyses of the blanks, standards and

duplicates by the Company's Qualified Person indicates values are within normal a nd acceptable ranges.

About Midas Gold and the Stibnite Gold Project

Midas Gold Corp., through its wholly owned subsidiaries are focused on the exploration and, if warranted, site

restoration and development of gold -antimony-silver deposits in the Stibnit e-Yellow Pine district of central Idaho

that are encompassed by its Stibnite Gold Project.

Forward-Looking Information

Statements contained in this news release that are not historical facts are "forward -looking information" or "forward -looking

statements" (collectively, "Forward -Looking Information") within the meaning of applicable Canadian securitie s legislation and

the United States Private Securities Litigation Reform Act of 1995. Forward Looking Information includes, but is not limited to,

disclosure regarding possible events, conditions or financial performance that is based on assumptions about future economic

conditions and courses of action including actions taken with the goal of improving, expanding and de -risking previously defined

mineral resources; the timing and availability of future drill results; potential sites for additional drilling that could result in

potential improved confidence, enhanced economic returns and/or extending higher grade areas. In certain cases, Forward -

Looking Information can be identified by the use of words an d phrases such as “once”, “estimates", "potential", "confirm", “if”

or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might "

"be achieved". In preparing the Forward -Looking Information in this news release, the Corporation has applied several material

assumptions, including, but not limited to, that pending drill results will be available in a timely manner without undue del ay;

that areas identified as potential sites for additional dri lling will yield results consistent with management's expectations based

on the PFS; any additional financing needed will be available on reasonable terms; the exchange rates for the U.S. and Canadi an

currencies will be consistent with the Corporation's expectations; that the current objectives concerning the Stibnite Gold Project

can be achieved and that its other corporate activities will proceed as expected; that the current price and demand for gold will

be sustained or will improve; that general busine ss and economic conditions will not change in a materially adverse manner and

that all necessary governmental approvals for the planned activities on the Stibnite Gold Project will be obtained in a timel y

manner and on acceptable terms; the continuity of t he price of gold and other metals, economic and political conditions and

operations. Forward-Looking Information involves known and unknown risks, uncertainties and other factors which may cause

the actual results, performance, or achievements of the Corpo ration to be materially different from any future results,

performance or achievements expressed or implied by the Forward -Looking Information. Such risks and other factors include,

among others, the industry -wide risks and project -specific risks identified in the PFS and summarized above; risks related to the

availability of financing on commercially reasonable terms; operations and contractual obligations; changes in exploration

programs based upon results of exploration, including drill results; changes in estimated mineral reserves or mineral resources;

future prices of metals; availability of third party contractors; availability of equipment; failure of equipment to operate as

anticipated; accidents, effects of weather and other natural phenomena and o ther risks associated with the mineral exploration

industry; environmental risks, including environmental matters under US federal and Idaho rules and regulations; impact of

environmental remediation requirements and the terms of existing and potential con sent decrees on the Corporation's planned

exploration and development activities on the Stibnite Gold Project; certainty of mineral title; community relations; delays in

obtaining governmental approvals or financing; fluctuations in mineral prices; the Cor poration's dependence on one mineral

project; the nature of mineral exploration and mining and the uncertain commercial viability of certain mineral deposits; the

Corporation's lack of operating revenues; governmental regulations and the ability to obtain necessary licenses and permits;

risks related to mineral properties being subject to prior unregistered agreements, transfers or claims and other defects in title;

currency fluctuations; changes in environmental laws and regulations and changes in the appl ication of standards pursuant to

existing laws and regulations which may increase costs of doing business and restrict operations; risks related to dependence on

key personnel; and estimates used in financial statements proving to be incorrect; as well as those factors discussed in the

Corporation's public disclosure record. Although the Corporation has attempted to identify important factors that could affec t

the Corporation and may cause actual actions, events or results to differ materially from those de scribed in Forward -Looking

Information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended .

There can be no assurance that Forward-Looking Information will prove to be accurate, as actual results and future events could

differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on Forward -

Looking Information. Except as required by law, the Corporation does not assume any obligation to release publicly any revisions

to Forward -Looking Information contained in this news release to reflect events or circumstances after the date hereof or to

reflect the occurrence of unanticipated events.

Page 4 of 5

Page 5 of 5