Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PPP.V ·

Ethos Gold Corp. files draft La Purisima 43-101, signs property access agreement, and commences field work

Exploration Programs

TH

Ethos G

Vancouv

is please

project (

prepared

following

The Pro j

northwes

by 15 k m

primary t

north-sou

undergro

broad str

the prim

mineraliz

potential

dissemin

resource

Ethos ha

taken to

to the sa

vein set

including

work pro

drill prog

for this p

good acc

Su

HIS RELEASE

Gold Corp.

ver, BC – Ju

ed to annou n

(the “ Projec

d b y P . C r ai

its acceptan

ject is loca t

st of the Cit y

m of paved

target is a n

uth strike l

ound workin g

ructural widt

ary veining ,

zing fluids.

open pit,

nated miner a

e definition w

as now comm

date and se

me lab. Init

that range s

g surface sa m

gram is to d

ram has com

program is a

cess and flat

uite 1430 – 8

E IS NOT FO

DISS

files draft L

une 15, 201

nce that it h

ct”) to the T

ig Gibson, P

nce by the E

ted in the n

y of Chihua h

road from

n epithermal

length of o

gs, and his t

th of up to 2

including i

Based on t h

heap leac h

alization. N

will depend o

menced sam

ent for assay

ial work has

from 10 to

mpling assa

define target

mmenced, w

lso being pr

t topography

00 West Pen

OR DISTRIBU

SEMINATION

La Purisima

comme

8, Ethos Go

as submitte

TSX Ventu r

Ph.D., CP G

Exchange.

north centr a

hua, and 50

Nuevo Ca s

low sulfid a

over 1.5 k m

toric drilling

200 meters,

n stockwor k

his explorati

hable reso u

No resource

n future exp

mpling and m

y to ALS Ch

uncovered

50 meters

ays, will be r

areas for d

with drilling a

epared with

y.

nder Street, V

UTION TO U.S

N IN THE UNI

a 43-101, sig

nces field w

old Corp. (“

d a draft 4 3

re Exchang

G. The tec h

al part of C h

km northea

sas Grande s

ation vein s y

m, open i n

indicate th a

with dissem

k a n d o t h er

ion concept

urce targeti n

has been d

ploration suc

mapping wor

emex in He

several vein

in width. W

released as

rilling. Conc

anticipated to

the cost an

Vancouver, B

S. NEWS WIR

ITED STATES

gns propert

work

“Ethos” or th

3-101 technic

e (the “ Exc

hnical repor t

hihuahua S

ast of Nuev o

s and then

ystem whic h

n both dir e

at gold min e

mination of g

r lithological

, Ethos is p

ng both th e

defined to d

ccess which

rk on La Pur

rmosillo, wit

ns not previo

Work is ong o

they are re c

currently, pe

o commence

nticipated to

BC V6C 2V6 

RE SERVICE

S

ty access a

he “Compan

cal report f o

change”).

t will be p o

tate, appro x

o Casas Gr a

60 km of g

h has been

ections. S u

eralization i s

gold minerali

units rece p

pursuing at L

e primary v

date at the

is uncertain

risima with 1

th an additio

ously identifi

oing and e x

ceived. The

ermit prepara

e prior to yea

be modest,

ES OR FOR

greement, a

ny”) (TSXV:E

or its La Pu r

The report

osted on S E

ximately 25 0

andes. Acce

gravel road .

mapped o v

urface ma p

s p r e s e n t ov

ization outsi

ptive to the

La Purisima

veining an d

Project, an d

.

189 rock sam

onal 200 en

ed, including

xploration re

e objective o

ation for an

ar-end. A bu

in part base

and

ECC)

risima

was

EDAR

0 k m

ess is

. The

ver a

pping,

ver a

de of

gold

as a

d the

d any

mples

route

g one

sults,

of this

initial

udget

ed on

2

The Company is also pleased to announce that it has signed a pr operty access agreement for

La Purisima with the cattle ranch land owners, providing the Co mpany with that access rights

necessary for the anticipated exploration work, including drill ing. The agreement also provides

access through the construction and operation of a mine, should the exploration program

successfully define an economic deposit.

Mel Herdrick, a director of and consultant to the Company, is a Qualified Person as defined

under National Instrument 43-101, has read and approves this release.

For additional information please contact Craig Roberts at 604- 682-4750. The Company’s

website, www.ethosgold.com, will be revised once the NI 43-101 technical report has been

accepted by the Exchange to include information on the La Puris ima project as well as other

corporate updates.

Ethos Gold Corp.

Per: "Craig Roberts"

Craig Roberts P .Eng., President & CEO

Forward-Looking Statement Cautions:

This press release contains certa in "forward-looking statements " within the meaning of Canadian securities

legislation, including statemen ts regarding Exchange acceptance and subsequent SEDAR filing of an NI 43-101

technical report on the Project, the future release of assay results from current exploration work, the development and

execution of a drill program, in cluding permit applications, an d the costs of a future expl oration and drilling program

forecast to be nominal. Although the Company believes that such statements are reasonable, it can give no

assurance that such expectations will prove to be correct. Forw ard-looking statements are statements that are not

historical facts; they are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes,"

"intends," "estimates," "projects," "aims," "potential," "goal," "objective," "prospective," and similar expressions, or that

events or conditions "will," "woul d," "may," "can," "could" or "should" occur, or are those statements, which, by their

nature, refer to future events. The Company cautions that Forwa rd-looking statements are based on the beliefs,

estimates and opinions of the Company's management on the date the statements are made and they involve a

number of risks and uncertainties. Consequently, there can be n o assurances that such st atements will prove to be

accurate and actual results and future events could differ mate rially from those anticipated in such statements.

Except to the extent required by applicable securities laws and the policies of the TSX Venture Exchange, the

Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or

opinions, or other factors, shoul d change. Factors that could c ause future results to differ materially from those

anticipated in these forward-looking statements include, the Company's inability to secure the acceptance by the TSX

Venture Exchange for the Compan y’s option agreement to acquire the La Purisima Project or the above-described

technical report, other delays faced by the Company in addressi ng the Exchange’s requirements for the technical

report, accidents and other risks associated with mineral explo ration operations, the risk that the Company will

encounter unanticipated geological factors, or the possibility that the Company may not be able to secure permitting

and other governmental clearances, necessary to carry out the C ompany's exploration plans, and the risk of political

uncertainties and regulatory or legal changes in the jurisdicti ons where the Company carries on its business that

might interfere with the Compan y's business and prospects. The reader is urged to refer to the Company's reports,

publicly available through the Canadian Securities Administrato rs' System for Electronic Document Analysis and

Retrieval (SEDAR) at www.sedar.com for a more complete discussion of such risk factors and their potential effects

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.