Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PNPN.V ·

Power Nickel Continues Extension of Mineralization with High Grade Results at Nisk PN-21-003A - 27.4 Metres 0.94% Ni, 0.63% Cu, 0.06% Co, 0.72gPd, 0.10g Pt PN-21-002 - 8.4 Metres 1.45% 0.40% Cu, 0.10% Co, 1.21gPd, 0.45g Pt

Drill Results

Power Nickel Continues Extension of Mineralization with High

Grade Results at Nisk

PN-21-003A - 27.4 Metres 0.94% Ni, 0.63% Cu, 0.06% Co, 0.72gPd, 0.10g Pt

PN-21-002 - 8.4 Metres 1.45% 0.40% Cu, 0.10% Co, 1.21gPd, 0.45g Pt

TORONTO, ON / March 15, 2022 / Power Nickel Inc . (the "Company" or "Power

Nickel") (TSXV:PNPN)(OTCQB:CMETF)(Frankfurt:IVVI) and Critical Elements

Lithium Corporation (" Critical Elements ") (CRE)(CRECF)(F12) are pleased to announce

results from the second set of drill holes have been received from its recent drill program at its

"NISK" Nickel Sulphate project near James Bay. These drill results confirm (PN-21-003A) the

presence of high-grade Nickel Mineralization in the central portion of the Nisk Main mineralized

lens. In addition to the historic and previously released assays, these new results (PN-21-002)

also demonstrate that higher grade mineralization extends by at least an additional 50 m at depth

and to the southwest. (Current holes are in Bold in the Table below)

Hole

ID

UT

M

E*

UT

M

N*

Len

gth

(m)

Azim

uth

(°)

D

ip

(°

)

Fro

m

(m)

To

(m)

Lengt

h**

(m)

Ni

(

%

)

C

u

(

%

)

C

o

(

%

)

P

d

(g

/t)

Pt

(g

/t)

PN-

21-

001

459

784

5728

538

264.

00 170

-

6

5

Pending

PN-

21-

002

459

626

5728

600

396.

00 160

-

7

0

352

.10

363

.00 10.90

1.

16

0.

32

0.

08

0.

94

0.

35

Inclu

ding

354

.60

363

.00 8.40

1.

45

0.

40

0.

10

1.

21

0.

45

PN-

21-

003A

459

691

5728

576

333.

00 161

-

7

0

269

.90

297

.30 27.40

0.

94

0.

63

0.

06

0.

72

0.

10

Inclu

ding

269

.90

281

.40 11.50

1.

47

0.

87

0.

10

1.

07

0.

15

PN-

21-

004

459

913

5728

703

360.

00 163

-

6

3

Pending

Hole

ID

UT

M

E*

UT

M

N*

Len

gth

(m)

Azim

uth

(°)

D

ip

(°

)

Fro

m

(m)

To

(m)

Lengt

h**

(m)

Ni

(

%

)

C

u

(

%

)

C

o

(

%

)

P

d

(g

/t)

Pt

(g

/t)

PN-

21-

005

459

998

5728

721

325.

50 164

-

6

3

272

.80

292

.70 19.90 0.

70

0.

61

0.

04

0.

81

0.

39

PN-

21-

006

460

100

5728

782

399.

00 160

-

6

9

374

.30

384

.00 9.70 0.

77

0.

38

0.

04

0.

79

0.

06

PN-

21-

007

460

216

5728

802

318.

00 161

-

6

3

294

.20

312

.00 17.80 0.

36

0.

10

0.

02

0.

38

0.

08

Inclu

ding

296

.90

302

.30 5.40 0.

57

0.

17

0.

03

0.

80

0.

06

*UTM NAD83, Zone 18N

**True widths are estimated to be 70 to 90% of core length

The illustration below details the current location of drill holes covered in this release, the

previous March 1, 2022 release, and also the remaining drill holes which are expected to be

announced in the coming days.

"These results are another positive indication that Nisk is a very exciting Nickel Sulphate

discovery. It's particularly encouraging to have such a large intersection of 27.4 Metres on hole

PN-21-003A and to see 1.45% Ni over 8.4 Metres at depth in hole PN-21-002. These results are

indicating that Nisk could have the potential to host a commercial high-grade Nickel Sulphate

deposit. Our objectives in this initial drill program conducted by Power Nickel were to produce

enough drilling to allow us to establish a new NI 43-101 compliant resource to confirm and

replace the historical resource, and to extend the known Nickel mineralization. We believe we

have established the latter and expect to be able to deliver a NI 43-101 compliant Mineral

Resource Estimate in Q2", commented Power Nickel's CEO Terry Lynch.

The existing resource estimates at the Nisk project are of historic nature and the Company's

geology team has not completed sufficient work to confirm a NI 43-101 compliant mineral

resource. Therefore, caution is appropriate since these historic estimates cannot, and should not

be relied on. For merely informational purposes see Table 1.

Table -1: Historical Resource Estimate figures for respective confidence categories at the

NISK-1 deposit, After RSW Inc 2009: Resource Estimate for the NISK-1 Deposit, Lac

Levac Property, Nemiscau, Québec.

The information regarding the NISK-1 deposit was derived from the technical report titled

"Resource Estimate for the NISK-1 Deposit, Lac Levac Property, Nemiscau, Québec" dated

December 2009. The key assumptions, parameters, and methods used to prepare the mineral

resource estimates described above are set out in the technical report.

The 3D geological model developed by 3DGeo Solution Inc. ("3DGS") identified a prospective

set of targets that the Company feels will give the best potential to expand the Nisk historical

deposit. The image below is a view of the mineralization projected from the surface at the area

we refer to as Nisk Main.

"Nisk has four distinct target areas covering over 7 Kilometres of strike length. Our focus this

round was on the Nisk Main target. Historically, we know globally these types of deposits

typically have multiple pods. We are encouraged by what we see on Nisk Main and feel we can

continue to build commercial tonnage there but we are also looking forward to exploring Nisk

West and the two wildcat targets in subsequent drilling in Q2", commented Power Nickel's CEO

Terry Lynch.

ABOUT NISK

Nisk is located south of James Bay as illustrated in the area map below. This region is the site of

a number of mining projects and improving infrastructure.

Nisk has historically had some very high-grade Nickel intercepts as shown below. The Grade-

Thickness iso-contours are representative of the nickel distribution only.

Analysis and QAQC Procedures

All samples were submitted to and analyzed at ALS Global ("ALS"), an independent commercial

laboratory located in Val-d'Or, Québec for both the sample preparation and assaying. ALS is a

commercial laboratory independent of Power Nickel with no interest in the Project. ALS is an

ISO 9001 and 17025 certified and accredited laboratory. Samples submitted through ALS are run

through standard preparation methods and analyzed using ME-ICP61a (33 element Suite; 0.4g

sample; Intermediate Level Four Acid Digestion) and PGM-ICP27 (Pt, Pd, and Au; 30g fire

assay and ICP-AES Finish) methods. ALS also undertakes its own internal coarse and pulp

duplicate analysis to ensure proper sample preparation and equipment calibration.

Power Nickel's QA/QC program includes the regular insertion of CRM standards, duplicates,

and blanks into the sample stream with a stringent review of all results. Historic holes were

assayed by various accredited laboratories.

About Power Nickel Inc.

Power Nickel is a Canadian junior exploration company focusing on high-potential copper, gold,

and battery metal prospects in Canada and Chile.

On February 1, 2021, Power Nickel (then called Chilean Metals) completed the acquisition of its

option to acquire up to 80% of the Nisk project from Critical Elements Lithium Corp. (CRE:

TSXV)

The NISK property comprises a large land position (20 kilometers of strike length) with

numerous high-grade intercepts. Power Nickel, formerly Chilean Metals is focused on

confirming and expanding its current high-grade nickel-copper PGE mineralization historical

resource by preparing a new Mineral Resource Estimate in accordance with NI 43-101,

identifying additional high-grade mineralization, and developing a process to potentially produce

nickel sulphates responsibly for batteries to be used in the electric vehicles industry.

Power Nickel (then called Chilean Metals) announced on June 8 th , 2021 that an agreement has

been made to complete the 100% acquisition of its Golden Ivan project in the heart of the Golden

Triangle. The Golden Triangle has reported mineral resources (past production and current

resources) in a total of 67 million ounces of gold, 569 million ounces of silver, and 27 billion

pounds of copper. This property hosts two known mineral showings (gold ore and magee), and a

portion of the past-producing Silverado mine, which was reportedly exploited between 1921 and

1939. These mineral showings are described to be Polymetallic veins that contain quantities of

silver, lead, zinc, plus/minus gold, and plus/minus copper.

Power Nickel is the 100-per-cent owner of five properties comprising over 50,000 acres

strategically located in the prolific iron-oxide-copper-gold belt of northern Chile. It also owns a

3-per-cent NSR royalty interest on any future production from the Copaquire copper-

molybdenum deposit, recently sold to a subsidiary of Teck resources Inc. Under the terms of the

sale agreement, Teck has the right to acquire one-third of the 3-per-cent NSR for $3-million at

any time. The Copaquire property borders Teck's producing Quebrada Blanca copper mine in

Chile's first region.

About Critical Elements Lithium Corporation

Critical Elements aspires to become a large, responsible supplier of lithium to the flourishing

electric vehicle and energy storage system industries. To this end, Critical Elements is advancing

the wholly-owned, high-purity Rose lithium project in Quebec. Rose is the Corporation's first

lithium project to be advanced within a land portfolio of over 700 square kilometers. In 2017,

Critical Elements completed a feasibility study on Rose for the production of spodumene

concentrate. The internal rate of return for the Project is estimated at 34.9% after-tax, with a net

present value estimated at C$726 million at an 8% discount rate. In Critical Elements' view,

Quebec is strategically well-positioned for US and EU markets and boasts good infrastructure

including a low-cost, low-carbon power grid featuring 93% hydroelectricity. The project has

received approval from the Federal Minister of Environment and Climate Change on the

recommendation of the Joint Assessment Committee, comprised of representatives from the

Impact Assessment Agency of Canada and the Cree Nation Government; Critical Elements is

working to obtain similar approval under the Quebec environmental assessment process. Critical

Elements also has a good, formalized relationship with the Cree Nation.

For further information on Power Nickel Inc., please contact:

Mr. Terry Lynch, CEO

647-448-8044

[email protected]

For further information, readers are encouraged to contact:

Power Nickel Inc.

The Canadian Venture Building

82 Richmond St East, Suite 202

Toronto, ON

For further information on Critical Elements, please contact:

Patrick Laperrière

Director of Investor Relations and Corporate Development

514-817-1119

[email protected]

www.cecorp.ca

or

Jean-Sébastien Lavallée, P. Géo.

Chief Executive Officer

819-354-5146

[email protected]

www.cecorp.ca

ON BEHALF OF THE BOARD OF DIRECTORS

Terry Lynch & CEO [email protected]

Qualified Person

Kenneth Williamson, Géo (OGQ #1490), M.Sc., Senior Consulting Geologist, and Matthew

DeGasperis, Géo (OGQ #2261), B.Sc., Consulting Geologist, from 3DGeo Solution Inc. are the

independent qualified persons pursuant to the requirements of NI 43-101, and have reviewed and

approved the technical content of this press release.

Cautionary Note Regarding Forward-Looking Statement

This news release may contain certain statements that may be deemed "forward-looking

statements". All statements in this release, other than statements of historical fact, that address

events or developments that PNPN expects to occur, including details related to the proposed

spin-out transactions, are forward-looking statements. Forward-looking statements are statements

that are not historical facts and are generally, but not always, identified by the words "expects",

"plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar

expressions, or that events or conditions "will", "would", "may", "could" or "should" occur.

Forward-looking statements in this document include statements regarding current and future

exploration programs, activities, and results. Although PNPN believes the expectations

expressed in such forward-looking statements are based on reasonable assumptions, such

statements are not guarantees of future performance and actual results may differ materially from

those in forward-looking statements. Factors that could cause the actual results to differ

materially from those in forward-looking statements include market prices, exploitation and

exploration success, continued availability of capital and financing, inability to obtain required

regulatory or governmental approvals, and general economic, market, or business conditions.

Investors are cautioned that any such statements are not guarantees of future performance and

actual results or developments may differ materially from those projected in the forward-looking

statements. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term

is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or

accuracy of this release.

SOURCE: Power Nickel Inc.