Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PNGC.CN ·

_Update Drilling (June 29,2022)

Drill Results

66 Wellington St W Suite 4100

Toronto, Ontario

M5K 1B7 Canada

Update on drilling of the Doriri Ni-Pd-Pt Prospect, Papua New Guinea

Toronto, ON, Canada (June 29, 2022) – PNG Copper Inc. (CSE:PNGC) (“ PNG Copper ” or the

“Company”) is pleased to report that following the completion of drillhole DOD005 on section

10040N at the Doriri nickel-palladium-platinum prospect on June 15, 2022, drilling moved to

Section 10025N which includes drillholes DOD006 and DOD007. Drilling results from Section

10025N will test the continuity of mineralization in Costean III, consisting of nickel-

chlorite+rhythmically interlayered magnetite+sulphides, to ~50 m depth. Previous channel

sampling of Costean III returned a 7.0 m interval averaging 0.78% Ni, 1011 ppb Pd and 92 ppb Pt.

Drillhole DOD006 with a dip of -45 o, the first hole on Section 10025N, was collared on June 17,

2022 and completed on June 21, 2022, with a final depth of 30.75 m. Mineralization was

intersected from 11.55 m to 27.00 m (15.45 m downhole width). Core from the mineralized

interval has been logged, photographed and sampled ready for dispatch.

Drillhole DOD007 with a dip of -70 o, the second hole on Section 10025N, was collared on June

22, 2022 and is presently at 29.20 m depth. It is drilling below drillhole DOD006. The Doriri lode

was intersected at 17.70 m depth and the hole remains in mineralization.

The final drillhole in the present program, DOD008, will be completed on Section 10000N. It is

expected to be collared by week’s end.

Core samples from DOD005 were dispatched to Australian Laboratory Services, Townsville,

Australia, for analysis on June 25, 2022. Gold, platinum and palladium analyses will be completed

by standard 30 gm lead collection Fire Assay followed by Inductively Coupled Plasma Mass

Spectrometry. Nickel assaying (including copper and silver) will involve a four-acid digest

including hydrofluoric, nitric, perchloric and hydrochloric acids in Teflon tubes. Analyses will be

completed by Inductively Coupled Plasma Optical (Atomic) Emission Spectrometry.

Doriri epithermal Ni-Pd-Pt prospect

Doriri is a low temperature accumulation of nickel, palladium and platinum located in the mafic

and ultramafic rocks of the Mt Suckling massif in southeastern Papua New Guinea. There is no

other documented mineral occurrence with a similar geology. Temperatures of formation of

nickel-rich chlorite, rhythmically interlayered with magnetite in the deposit, are in the range 100-

220oC, classifying it as an epithermal deposit. The mineralization has an average width of 10-15m

and has been previously mapped over a strike length of 520m. It remains open ended in both

directions. Mineralization crops out at the surface and remains open at depth.

The technical information in this news release has been prepared in accordance with the

Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf

of the company by Ian David Lindley, Interim Chief Executive Officer of PNG Copper Inc., a

66 Wellington St W Suite 4100

Toronto, Ontario

M5K 1B7 Canada

Qualified Person. Dr. Lindley has First Class Honours and Ph.D. degrees in Geology, 44 years of

mining industry experience, and is a Fellow of the Australian Institute of Geoscientists.

Drill section 10040N showing existing holes DOD001 and DOD002, completed in 2012, present

hole DOD005 and a proposed hole

66 Wellington St W Suite 4100

Toronto, Ontario

M5K 1B7 Canada

D Drill site DOD005 (left) with drillers camp, Section 10400N

About PNG Copper Inc.

PNG Copper Inc. is a mineral exploration company focused on acquiring, exploring, and

developing quality mineral properties in Papua New Guinea. The Company’s core values are

respect for the Community, the Landowners, the environment and operating a safe workplace

for its employees. The Company is also committed to best practice standards of Corporate

Governance.

66 Wellington St W Suite 4100

Toronto, Ontario

M5K 1B7 Canada

For further information please visit the Company’s website at pngcopper.ca or contact:

PNG Copper Inc.

Paul Rokeby, Chief Financial Officer

Tel: +1.705.465.1880

This news release does not constitute an offer to sell or a solicitation of an offer to buy nor shall there be any sale of any of

the securities in any jurisdiction in which such offer, solicitation or sale would be unlawful, including any of the securities in

the United States of America. The securities have not been and will not be registered under the United States Securities Act

of 1933, as amended (the “1933 Act”) or any state securities laws and may not be offered or sold within the United States

or to, or for account or benefit of, U.S. Persons (as defined in Regulation S under the 1933 Act) unless registered under the

1933 Act and applicable state securities laws, or an exemption from such registration requirements is available.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian

Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This Press Release contains forward-looking information within the meaning of applicable securities laws. When used in

this document, the words “may”, “would”, “could”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “targeted”

and similar expressions are intended to identify forward-looking statements. Forward-looking information in this news

release includes, but is not limited to, information concerning the drilling on PNG Copper property, dispatch of samples to

Australia, procedures for mineral analyses, the Company’s objectives, goals or future plans, statements. Since forward-

looking statements are based on assumptions and address future events and conditions, by their very nature they involve

inherent risks and uncertainties which may cause actual results to differ materially from the statements made.

These assumptions include industry assumptions relating to, the price of copper, gold and other metals, currency and

interest rate fluctuations, and assumptions concerning mineralization, mineral recoveries, the ability to conduct exploration

activities in Papua New Guinea, and assumptions concerning COVID-19. Factors that could cause actual results to vary from

the Company’s stated expectations include, but are not limited to, mineral price and exchange rate fluctuations, increased

competition and general economic and market factors, potential mineralization not being as anticipated, uncertainties

inherent in the estimation of mineral resources, exploration and mine development plans, timing of the commencement of

operations and estimates of market conditions, failure to identify mineral resources, failure to convert estimated mineral

resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary

nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other

project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future,

changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the

development of projects, capital and operating costs varying significantly from estimates.

Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this

news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of

this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The

Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of

new information, future events or otherwise, other than as required by law.