Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PML.V ·

Panoro Minerals Reports Results of the Drilling Program at Cotabambas Project, Peru

Exploration Programs

Panoro Minerals Reports Results of the Drilling Program at Cotabambas Project, Peru

VANCOUVER, British Columbia, June 18, 2018 -- Panoro Minerals Ltd. (TSXV:PML) (Lima:PML) (Frankfurt:PZM) (“Panoro”, the

“Company”) is pleased to report additional assays results for six drill holes from its 100% owned Cotabambas porphyry copper-gold-silver

project located in southern Peru.

The drillholes have intersected additional oxide and primary sulphide mineralization at the Maria Jose 1 & 2 Targets and the Petra Target. 

The intersection of skarn mineralization at the Petra Target has been newly identified.  Additional drilling is planned in these areas in 2018.

The drill results are from the recently completed first phase of the 2018 drill program to further test the Maria Jose 1 and 2 and Petra David

Targets following up on the discoveries made during 2017.  The six drillholes include four drill holes at the Maria Jose 2 Target, 1 from the

Maria Jose Target and 1 from the Petra David Target.

Luquman Shaheen, President and CEO states, “The 2018 drilling to date has intercepted additional near-surface oxide copper mineralization

at both Petra and Maria Jose adding to the potential to include a heap leach and SX/EW component to the Cotabambas Project.  The

underlying primary mineralization requires additional drilling to target the higher grade areas intercepted in 2017.  The interception of skarn

mineralization is a new component to the geologic potential within Cluster 1.  The potential for connection with the Cluster 2 Skarn

mineralization opens a new corridor for exploration potential.  The drill permit expansion to include Cluster 2 is well advanced and we expect

to have final approval soon.  The Company has expanded the mapping and sampling campaign in this area to define additional drill targets.”

Maria Jose 1 Target

The 2017 drill campaign identified a potential copper oxide blanket over an area of 420 m by 150 m. A total of 663 m of drilling in three

drillholes was completed in 2017. The oxide blanket was intercepted from surface to125 m depth with grades varying between 0.23% Cu and

0.28% Cu.  

In 2018, drillhole CB-188 was collared 150 m to the southwest of drillhole CB-180, and oriented to the northeast.  CB-188 intersected 130.3 m

of oxide copper averaging 0.20% Cu, 0.03 g/t Au and 1.65 g/t Ag, including one interval of 20.3 m grading 0.33% Cu, underlain by 125.7 m of

primary copper mineralization, grading 0.25% Cu, 0.02 g/t Au and 1.03 g/t Ag, including one interval of 24 m averaging 0.35% Cu. The Maria

Jose Target mineral potential remains open for additional drilling in multiple directions.

Maria Jose 2 Target

The 2017 drill campaign identified three parallel mineral bodies over an area of 550 m by 250 m. The potential copper oxides blanket was

intercepted to 75 m depth and the primary copper mineralization to 350 m depth, with grades varying between 0.20% Cu to 0.40% Cu. The

copper mineralization was intruded by quartz monzonite dikes from 10 to 50 m width, expanded and hosted mainly in andesite volcanics.

This mineralization was identified with 3,573 m of drilling distributed in 11 drillholes.

During the 2018 drilling campaign, four additional drillholes were completed, three stepping out to the north and one to the south. To the

north, drillhole CB-184 intersected two copper oxide blankets of 10.3 m and 6.4 m width grading 0.20% Cu and 0.23% Cu, respectively.

 Drillhole CB-186 intersected copper oxide mineralization from surface to 44.7 m depth averaging 0.22% Cu, and a second interval of 35.9 m

of primary copper mineralization averaging 0.29% Cu, 0.07 g/t Au, and 1.85 g/t Ag, including two intervals of 10.1 m and 7.2 m, grading

0.51% Cu and 0.30% Cu, respectively. To the south, drillhole CB-189 intersected primary copper mineralization at different intervals to 522.4

m depth and the mineralization remains open. In Maria Jose 2 the mineralization potential remains open to the south and at depth for

additional drilling.

Petra Target

In 2017, 8 drillholes were completed at the Petra-David target confirming copper oxides mineralization continuity over an area of 600 m by 150

m along a structural control in northeast direction, hosted in quartz monzonite porphyries and diorite rocks.

In 2018 the exploratory drillhole CB-185 was collared 200 m to the southeast of previous drillhole CB-172 in Petra. CB-185 was oriented to

the northwest intersecting 10 m of copper oxide blanket averaging 0.22% Cu, 0.03 g/t Au and 1.77 g/t Ag, underlain by an interval of primary

copper mineralization of 23 m grading 0.27% Cu. At depth, two intervals of skarn type mineralization were intersected in a package of

marbled limestones.  The first interval of 4.0 m width include massive magnetite with andradite garnets averaging 0.35% Cu, 0.02 g/t Au, 3.95

g/t Ag, including 1.3 m grading 0.94% Cu, 0.04 g/t Au and 6.55 g/t Ag and a second interval of 1.0 m width with the similar mineralogy

grading 0.38% Cu, 0.33 g/t Au, and 21.22 g/t Ag. The potential of skarn is open to the west towards the Guaclle target for additional drilling.

Previous drilling at the Guaclle target has also intersected skarn mineralization indicating a potential connection with the skarn mineralization

mapped at the Chaupec Target in Cluster 2.

Additional mapping, rock chip and soil sampling has commenced in this area to define additional drillholes to be completed during 2018.

A location plan can be found here.

The following table details the more significant intersections:

Drillhole From (m) To (m) Metres (m) Cu % Au g/t Ag g/t Mo % Zone

CB-184 7.7 18.0 10.3 0.20 0.01 1.32 0.0005 Oxides

" " 43.1 66.2 23.1 0.17 0.02 1.44 0.0004 Oxides

Include 45.2 51.6 6.4 0.23 0.03 2.01 0.0005 Oxides

" " 285.1 342.0 56.9 0.14 0.04 0.88 0.0017 Primary

CB-185 23.1 33.2 10.1 0.22 0.03 1.77 0.0029 Oxide

" " 94.5 141.0 46.5 0.21 0.02 1.56 0.0036 Primary

Including 107.0 130.0 23.0 0.27 0.03 1.89 0.0029 Primary

" " 228.7 232.7 4.0 0.35 0.02 3.95 0.0009 Skarn

Including 229.3 230.7 1.3 0.94 0.04 6.55 0.0019 Skarn

" " 239.0 240.0 1.0 0.38 0.33 21.22 0.0010 Skarn

CB-186 0.0 44.7 44.7 0.22 0.04 1.78 0.0004 Oxide

Including 5.5 18.7 13.2 0.26 0.06 1.90 0.0003 Oxide

Including 30.5 33.5 3.1 0.41 0.06 3.31 0.0004 Oxide

" " 117.3 153.2 35.9 0.29 0.07 1.85 0.0029 Primary

Including 119.0 129.0 10.1 0.51 0.09 3.94 0.0028 Primary

Including 141.0 148.2 7.2 0.30 0.15 1.38 0.0028 Primary

" " 209.5 262.3 52.8 0.15 0.02 0.96 0.0028 Primary

Including 226.5 237.5 11.0 0.22 0.03 1.21 0.0042 Primary

CB-187 No significant intersections

CB-188 3.8 130.3 126.5 0.19 0.03 1.65 0.0006 Oxide

Including 110.0 130.3 20.3 0.33 0.03 2.07 0.0014 Oxide

Including 121.5 130.3 8.8 0.39 0.03 1.78 0.0016 Oxide

" " 130.3 255.9 125.7 0.25 0.02 1.03 0.0029 Primary

Including 130.3 192.3 62.1 0.30 0.01 1.06 0.0024 Primary

Including 168.3 192.3 24.0 0.35 0.02 1.21 0.0023 Primary

CB-189 80.8 94.1 13.3 0.19 0.02 1.41 0.0005 Oxide

" " 164.8 188.3 23.5 0.15 0.02 0.95 0.0051 Primary

" " 243.4 262.9 19.5 0.17 0.02 0.87 0.0046 Primary

" " 320.8 326.8 6.0 0.32 0.18 1.77 0.0047 Primary

" " 383.2 478.0 94.8 0.20 0.03 1.50 0.0033 Primary

Including 402.6 442.5 39.9 0.27 0.05 2.46 0.0049 Primary

Including 420.7 435.9 15.2 0.39 0.06 2.62 0.0033 Primary

" " 489.5 524.6 35.2 0.21 0.04 1.75 0.0011 Primary

Including 509.5 522.4 13.0 0.31 0.06 3.15 0.0018 Primary

The first phase of the 2018 drilling campaign was focused in Cluster 1, in the igneous rock environment and a total of 2,172 m has been

completed. The second phase will be initiated in August in Cluster 2 and the Chaupec Skarn Target.

About Panoro

Panoro Minerals is a uniquely positioned Peru focused copper exploration and development company.  The Company is advancing its

flagship project, Cotabambas Copper-Gold-Silver Project and its Antilla Copper-Molybdenum Project, both located in the strategically

important area of southern Peru. The Company is well financed to expand, enhance and advance its projects in the region where

infrastructure such as railway, roads, ports, water supply, power generation and transmission are readily available and expanding quickly. 

The region boasts the recent investment of over US$15 billion into the construction or expansion of four large open pit copper mines.

Since 2007, the Company has completed over 80,000 meters of exploration drilling at these two key projects leading to substantial increases

in the mineral resource base for each, as summarized in the table below.

Summary of Cotabambas and Antilla Project Resources

 Project  Resource

 Classification

 Million

 Tonnes Cu (%) Au (g/t) Ag (g/t) Mo (%)

 Cotabambas Cu/Au/Ag  Indicated  117.1 0.42 0.23 2.74 0.001

 Inferred  605.3 0.31 0.17 2.33 0.002

 @ 0.20% CuEq cutoff, effective October 2013, Tetratech

 Antilla Cu/Mo  Indicated  291.8 0.34 - - 0.01

 Inferred  90.5 0.26 - - 0.007

 @ 0.175% CuEq cutoff, effective May 2016, Tetratech

Preliminary Economic Assessments (PEA) have been completed for both the Cotabambas and Antilla Projects, the key results are

summarized below.

Summary of Cotabambas and Antilla Project PEA Results

 Key Project Parameters

Cotabambas Cu/Au/Ag

Project1

Antilla Cu

 Project2

 Process Feed, life of mine  million tonnes 483.1 118.7

 Process Feed, daily  Tonnes 80,000 20,000

 Strip Ratio, life of mine   1.25 : 1 1.37 : 1

 Before

 Tax1

 NPV7.5%  million USD 1,053 520

 IRR  % 20.4 34.7

 Payback  years 3.2 2.6

 After

 Tax1

 NPV7.5%  million USD 684 305

 IRR  % 16.7 25.9

 Payback  years 3.6 3.0

 Annual Average Payable

 Metals

 Cu  thousand tonnes 70.5 21.0

 Au  thousand ounces 95.1 -

 Ag  thousand ounces 1,018.4 -

 Mo  thousand tonnes - -

 Initial Capital Cost  million USD 1,530 250

1. Project economics estimated at commodity prices of; Cu = US$3.00/lb, Au = US$1,250/oz, Ag = US$18.50/oz, Mo = US$12/lb

2. Project economics estimated at long term commodity price of Cu = US$3.05/lb and Short term commodity price of Cu = US$3.20,

US$3.15 and US$3.10 for Years 1,2 and 3 of operations, respectively.

The PEAs are considered preliminary in nature and include Inferred Mineral Resources that are considered too speculative to have the

economic considerations applied that would enable classification as Mineral Reserves. There is no certainty that the conclusions within the

updated PEA will be realized. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

Luis Vela, a Qualified Person under National Instrument 43-101, has reviewed and approved the scientific and technical information in this

press release.

On behalf of the Board of Panoro Minerals Ltd.

Luquman Shaheen. PEng, PE, MBA

President & CEO

FOR FURTHER INFORMATION, CONTACT:

Panoro Minerals Ltd.

Luquman Shaheen, President & CEO

Phone: 604.684.4246  Fax: 604.684.4200

Email: [email protected]

Web: www.panoro.com

Renmark Financial Communications Inc.

Laura Welsh

Tel.: (416) 644-2020 or (416) 939-3989

[email protected]

www.renmarkfinancial.com

CAUTION REGARDING FORWARD LOOKING STATEMENTS :  Information and statements contained in this news release that are not

historical facts are “forward-looking information” within the meaning of applicable Canadian securities legislation and involve risks and

uncertainties.

Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual

events or results to differ materially from those expressed or implied by the forward-looking statements, including, without limitation:

• risks relating to metal price fluctuations;

• risks relating to estimates of mineral resources, production, capital and operating costs, decommissioning or reclamation expenses,

proving to be inaccurate;

• the inherent operational risks associated with mining and mineral exploration, development, mine construction and operating activities,

many of which are beyond Panoro’s control;

• risks relating to Panoro’s ability to enforce Panoro’s legal rights under permits or licenses or risk that Panoro’s will become subject to

litigation or arbitration that has an adverse outcome;

• risks relating to Panoro’s projects being in Peru, including political, economic and regulatory instability;

• risks relating to the uncertainty of applications to obtain, extend or renew licenses and permits;

• risks relating to potential challenges to Panoro’s right to explore and/or develop its projects;

• risks relating to mineral resource estimates being based on interpretations and assumptions which may result in less mineral

production under actual circumstances;

• risks relating to Panoro’s operations being subject to environmental and remediation requirements, which may increase the cost of

doing business and restrict Panoro’s operations;

• risks relating to being adversely affected by environmental, safety and regulatory risks, including increased regulatory burdens or

delays and changes of law;

• risks relating to inadequate insurance or inability to obtain insurance;

• risks relating to the fact that Panoro’s properties are not yet in commercial production;

• risks relating to fluctuations in foreign currency exchange rates, interest rates and tax rates; and

• risks relating to Panoro’s ability to raise funding to continue its exploration, development and mining activities.

This list is not exhaustive of the factors that may affect the forward-looking information and statements contained in this news release. 

Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary

materially from those described in the forward -looking information.  The forward-looking information contained in this news release is based

on beliefs, expectations and opinions as of the date of this news release.  For the reasons set forth above, readers are cautioned not to place

undue reliance on forward-looking information.  Panoro does not undertake to update any forward-looking information and statements included

herein, except in accordance with applicable securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.