Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PMET.TO ·

Widest Caesium Drill Intercept to Date at the Helios Caesium Zone in Final Batch of 2025 Drill Results from Shaakichiuwaanaan

Drill Results

PMET Resources Inc.

Suite 900 - 1801 McGill College, Montreal, Qc, Canada, H3A 1Z4

www.pmet.ca / TSX: PMET / ASX: PMT / OTC: PMETF / FSE: R9GA

Widest Caesium Drill Intercept to Date at the Helios Caesium

Zone in Final Batch of 2025 Drill Results from Shaakichiuwaanaan

March 18, 2026 – Montreal, QC, Canada March 19, 2026 – Sydney, Australia

HIGHLIGHTS

• Widest caesium drill intercept recorded to date at the newly discovered Helios

Zone:

o 4.9 m at 3.65% Cs2O including 1.7 m at 6.14% Cs2O (CV25-979).

o 0.5 m at 6.28% Cs2O (CV25-984).

• Strong caesium grades intersected in drill hole located outside the known

mineralized zones at the CV13 Pegmatite , indicating the presence of a new

mineralized lens north of the Vega Zone:

o 2.3 m at 4.65% Cs2O (CV25-999).

• A total of 57,024 m (245 holes) of drilling was completed in 2025, with results for lithium,

caesium, and tantalum now reported for all drill holes:

o This release reports results from 1,176 m (7 holes) of drilling completed at the

CV13 Pegmatite.

Darren L. Smith, Executive Vice President Explora tion, comments: “The results conclude reporting

for all drill holes from the Company’s highly successful 2025 drilling campaign at Shaakichiuwaanaan,

which has delivered multiple significant new discoveries and further demonstrated the globally relevant

scale, grade, and multi-commodity critical mineral potential of the Property. The team continues to execute

at the highest levels , as exemplified in the Company’s continued exploration success and development

progress.

“Current work is focused on integrating the new datasets into the Company’s exploration strategy and

updated geological models, which will underpin the next round of exploration and an updated Feasibility

Study at CV5 incorporating a tantalum co-product, as well as a Preliminary Economic Assessment for the

broader Project covering lithium, caesium, and tantalum,” added Mr. Smith.

PMET RESOURCES INC. (THE “COMPANY” OR “PMET”) (TSX: PMET) (ASX: PMT)

(OTCQX: PMETF) (FSE: R9GA) is pleased to report the final assay results from its 2025 drill

campaign at the Company’s wholly -owned Shaakichiuwaanaan Property (the “Property” or

“Project”), located in the Eeyou Istchee James Bay region of Quebec. The reported drill holes

targeted caesium mineralization at the CV13 Pegmatite.

In addition to being one of the largest lithium -tantalum pegmatite Mineral Resources1 and lithium

pegmatite Mineral Reserves2 globally, the Property also hosts the world’s largest in-situ pollucite-

hosted caesium pegmatite Mineral Resource, comprising 0.69 Mt at 4.40% Cs 2O (Indicated) and

1.70 Mt at 2.40% Cs2O (Inferred). The CV13 Pegmatite, which hosts the caesium Mineral Resource,

is located ~3 km along trend from the CV5 Pegmatite, which is situated approximately 13 km

south of the regional Trans -Taiga Road and powerline infrastructure corridor, and is accessible

year-round by road.

Figure 1: 2025 drill hole results for caesium at the CV13 Pegmatite.

1 The Consolidated MRE (CV5 + CV13 pegmatites), which includes the Rigel and Vega caesium zones, totals 108.0 Mt at 1.40% Li2O, 0.11%

Cs2O, 166 ppm Ta2O5, and 66 ppm Ga, Indicated, and 33.4 Mt at 1.33% Li 2O, 0.21% Cs2O, 155 ppm Ta2O5, and 65 ppm Ga, Inferred,

and is reported at a cut-off grade of 0.40% Li2O (open-pit), 0.60% Li2O (underground CV5), and 0.70% Li2O (underground CV13). A grade

constraint of 0.50% Cs2O was used to model the Rigel and Vega caesium zones. Effective Date is June 20, 2025 (through CV24-787). Mineral

Resources are not Mineral Reserves as they do not have demonstrated economic viability. Mineral Resources are inclusive of Mineral Reserves.

2 Probable Mineral Reserve of 84.3 Mt at 1.26% Li 2O at the CV5 Pegmatite with a c ut-off grade is 0.40% Li2O (open-pit) and 0.70% Li2O

(underground). Underground development and open -pit marginal tonnage containing material above 0.37% Li 2O are also included in the

statement. The Effective Date is September 11, 2025. See Feasibility Study news release dated October 20, 2025.

Core assay results for caesium for the remaining 1,176 m (7 holes) from the 2025 drill campaign

– all from at the CV13 Pegmatite – are reported in this announcement (see Figure 1, Table 1, and

Table 2). Results for lithium and tantalum for all drill holes completed in 2025 at Shaakichiuwaanaan

have been previously reported (see news releases dated December 14, 2025 and January 21, 2026).

All reported widths are core length (i.e., true width not known).

HELIOS CAESIUM ZONE (NEW 2025 DISCOVERY)

The Helios Caesium Zone at CV13 is a new 2025 discovery , is located near surface, has

approximate dimensions of 180 m x 80 m at ~1 to ~3 m thickness, and remains open in several

directions (Figure 1, Table 1, Figure 2). At Helios, i nitial drill hole results have confirmed high-

grades of caesium including an intercept of 1.0 m at 21.52% Cs 2O in drill hole CV25-975 (see

news release dated February 3, 2026). Remaining drill hole results from 2025 are reported in this

announcement and include the widest caesium intercept – also at strong grade – recorded to date

at Helios:

• 4.9 m at 3.65% Cs2O including 1.7 m at 6.14% Cs2O (CV25-979), Figure 2.

• 0.5 m at 6.28% Cs2O (CV25-984).

• 2.6 m at 1.14% Cs2O (CV25-968).

Figure 2: Pollucite with late stage spodumene/pollucite (white) veining displaying classic “tapioca” texture

(white blebs) at a depth of ~43.7 m in drill hole CV25-979 from the Helios Zone. Core grades 0.5 m at

2.33% Cs2O within a wider mineralized interval of 4.9 m at 3.65% Cs2O (39.0 m to 43.9 m)

NEW DISCOVERY INDICATES A POTENTIAL NEW ZONE NORTH OF VEGA

The final batch of drill core assays has resulted in the discovery of strong caesium grades located

outside of the other known zones of mineralization at the CV13 Pegmatite (i.e., outside of Vega,

Rigel, Helios). The intercept – 2.3 m at 4.65% Cs2O (CV25-999) – is located approximately 70 m

north of the currently defined Vega Caesium Zone and is closer to surface (~45 m vertical depth),

indicating the presence of a new mineralized lens (Figure 1). The Company intends to follow -up

on the mineralized intercept during its 2026 drill campaign.

NEXT STEPS

Drill results for lithium, caesium, and tantalum have now been received and reported for all drill

holes completed during the 2025 campaign (57,024 m over 245 holes) . The geology team is

currently interpreting and working with the data to advance the host rock and pegmatite geological

models for the Project. The work is focused on the CV5 and CV13 pegmatites – including the

Vega, Rigel, and Helios caesium zones – ahead of updates to their respective block models and

subsequent Mineral Resource Estimates.

These revised models will underpin an updated Feasibility Study for the CV5 Pegmatite with the

addition of tantalum as a co-product, as well as a Preliminary Economic Assessment for the broader

Project inclusive of lithium, caesium , and tantalum. The Company is also actively advancing the

permitting of an underground bulk sample of mineralized pegmatite at CV5.

Table 1: Core assay summary for caesium in drill holes reported herein at the CV13 Pegmatite.

Zone Hole ID From

(m)

To

(m)

Interval

(m)

Li2O

(%)

Cs2O

(%)

Ta2O5

(ppm)

Vega CV25-937 38.9 39.8 0.9 5.12 1.64 303

Vega CV25-941 84.5 86.0 1.5 0.21 2.78 177

Vega CV25-945 129.2 129.7 0.5 0.95 1.72 58

153.8 154.4 0.6 3.50 3.60 34

Helios CV25-968 46.4 49.0 2.6 1.68 1.14 229

Helios CV25-979 39.0 43.9 4.9 1.64 3.65 544

incl. 39.0 40.7 1.7 0.08 6.14 47

Helios CV25-984 44.2 44.7 0.5 4.15 6.28 97

North of Vega CV25-999 45.3 47.5 2.3 0.75 4.65 24

(1) All intervals are core length (i.e., true width not known given the varied drill orientations, inherent nature of pegmatite

bodies, and stage of delineation) and presented for all pegmatite intervals >1% Cs2O. A 0.5% Cs2O cut -off is used to

constrain the pegmatite interval.

Table 2: Attributes for drill holes reported herein at the CV13 Pegmatite.

Hole ID Substrate

Total

Depth

(m)

Azimuth

(°)

Dip

(°) Easting Northing Elevation

(m)

Core

Size Area

CV25-937 Land 173.1 170 -85 565442.2 5928367.5 405.3 HQ3 CV13

CV25-941 Land 169.9 140 -75 565709.0 5928599.6 382.3 HQ3 CV13

CV25-945 Land 215.1 295 -75 565461.9 5928558.3 387.9 HQ3 CV13

CV25-968 Land 263.2 205 -75 564777.7 5928210.4 425.9 HQ3 CV13

CV25-979 Land 80.3 200 -65 564820.9 5928193.9 426.8 NQ CV13

CV25-984 Land 94.9 20 -80 564821.8 5928196.1 427.0 NQ CV13

CV25-999 Land 179.1 65 -70 565431.0 5928780.9 390.0 HQ3 CV13

(1) Coordinate system NAD83 / UTM zone 18N; (2) All drill holes are diamond drill; (3) Azimuths and dips presented are those 'planned'

and may vary off collar/downhole.

QUALITY ASSURANCE / QUALITY CONTROL (QAQC)

Drill core was saw-cut with half-core sent for geochemical analysis and half-core remaining in the

box for reference. A Quality Assurance / Quality Control protocol following industry best

practices was incorporated into the program and included systematic insertion of quartz blanks

and certified/standard reference materials into sample batches at a rate of approximately 5% each.

Additionally, analysis of pulp-split sample duplicates was completed to assess analytical precision,

and external (secondary) laboratory pulp -split duplicates were prepared at the primary lab for

subsequent check analysis and validation.

All core samples collected were shipped to SGS Canada’s laboratory in Val-d’Or, QC, for sample

preparation (code PRP90 special) which includes drying at 105°C, crush to 90% passing 2 mm, riffle

split 250 g, and pulverize 85% passing 75 microns. The pulps were shipped by air to SGS Canada’s

laboratory in Burnaby, BC, where the samples were homogenized and subsequently analyzed for

multi-element (including Li, Ta, and Cs) using sodium peroxide fusion with ICP -AES/MS finish

(codes GE_ICP91A50 and GE_IMS91A50). Overlimits for Cs were completed at SGS Canada’s

laboratory in Lakefield, ON, by borate-fusion XRF (code GC_XRF76V).

ABOUT CAESIUM

Mineral deposits of pollucite -hosted caesium are very rare globally and represent the most

fractionated component of LCT pegmatite systems, which are effectively the only known primary

economic source of caesium supply. Economic deposits of caesium pegmatite are typically on a

smaller scale of <10 kt to 350 kt in size compared to deposits of lithium pegmatite that typically

range in the millions of tonnes in size (<10 Mt and rarely over 100 Mt).

The market for caesium compounds and metals is largely opaque because it is not publicly traded

like copper or gold, but rather through bi-lateral and term contracts. Further, product prices vary

depending on their contained caesium form, purity and end-product use. As an example, caesium

carbonate (Cs2CO3≥99%) currently trades at more than US$200/kg (excluding VAT, Price Sourcing

– Shanghai Metal Markets).

Caesium is currently supply constrained, with only limited sources supplying the global market. A

discovery at the size, grade, and scale of Shaakichiuwaanaan has the potential to be a primary

source of supply for global markets over the long -term. This includes existing applications for

caesium in oil/gas drilling, medical imaging , emissions reduction, atomic clocks and precision GPS

navigation, as well as new and potentially growing applications in the terrestrial solar panel industry.

Caesium has been found to play a vital role in significantly improving next generation solar panel

efficiency, stability, and life span. Additionally, the use of caesium in lithium-ion batteries to improve

performance is actively being explored through use as an additive in certain cathode, anode, and

electrolyte chemistries.

QUALIFIED/COMPETENT PERSON

The technical and scientific information in this news release that relates to the Mineral Resource

Estimate and exploration results for the Company’s properties is based on, and fairly represents,

information compiled by Mr. Darren L. Smith, M.Sc., P.Geo., who is a Qualified Person as defined

by National Instrument 43 -101 – Standards of Disclosure for Mineral Projects (“NI 43 -101”), and

member in good standing with the Ordre des Géologues du Québec (Geologist Permit number

01968), and with the Association of Professional Engineers and Geoscientists of Alberta (member

number 87868). Mr. Smith has reviewed and approved the related technical information in this

news release.

Mr. Smith is an Executive and Vice President of Exploration for PMET Resources Inc. and holds

common shares, Restricted Share Units (RSUs), Performance Share Units (PSUs) , and options in

the Company.

The information in this news release that relates to the Mineral Reserve Estimate and Feasibility

Study is based on, and fairly represents, information compiled by Mr. Frédéric Mercier -Langevin,

Ing. M.Sc., who is a Qualified Person as defined by NI 43-101, and member in good standing with

the Ordre des Ingénieurs du Québec. Mr. Mercier-Langevin has reviewed and approved the related

technical information in this news release.

Mr. Mercier-Langevin is the Chief Operating and Development Officer for PMET Resources Inc.

and holds common shares, RSUs, PSUs, and options in the Company.

ABOUT PMET RESOURCES INC.

PMET Resources Inc. is a pegmatite critical mineral exploration and development company focused

on advancing its district -scale 100% -owned Shaakichiuwaanaan Property located in the Eeyou

Istchee James Bay region of Quebec, Canada, which is accessible year -round by all -season road

and proximal to regional hydro-power infrastructure.

In late 2025, the Company announced a positive lithium -only Feasibility Study on the CV5

Pegmatite for the Shaakichiuwaanaan Property and declared a maiden Mineral Reserve of 84.3 Mt

at 1.26% Li2O (Probable)3. The study outlines the potential for a competitive and globally significant

high-grade lithium project targeting up to ~800 ktpa spodumene concentrate using a simple Dense

Media Separation (“DMS”) only process flowsheet. Further, the results highlight

Shaakichiuwaanaan as a potential North American critical mineral powerhouse with significant

opportunity for tantalum and caesium in addition to lithium.

The Project hosts a Consolidated Mineral Resource4 totalling 108.0 Mt at 1.40% Li2O and 166 ppm

Ta2O5 (Indicated) and 33.4 Mt at 1.33% Li2O and 155 ppm Ta2O5 (Inferred), and ranks as a top ten

lithium pegmatite globally in size . Additionally, the Project hosts the world’s largest pollucite-

hosted caesium pegmatite Mineral Resource at the Rigel and Vega zones with 0.69 Mt at 4.40%

Cs2O (Indicated), and 1.70 Mt at 2.40% Cs2O (Inferred).

For further information, please contact us at [email protected] or by calling +1 (604) 279 -8709, or

visit www.pmet.ca. Please also refer to the Company’s continuous disclosure filings, available under

its profile at www.sedarplus.ca and www.asx.com.au, for available exploration data.

3 See Feasibility Study news release dated October 20, 2025. Probable Mineral Reserve cut-off grade is 0.40% Li2O (open-pit) and 0.70%

Li2O (underground). Underground development and open-pit marginal tonnage containing material above 0.37% Li2O are also included in the

statement. Effective Date of September 11, 2025.

4 The Consolidated MRE (CV5 + CV13 pegmatites), which includes the Rigel and Vega caesium zones, totals 108.0 Mt at 1.40% Li2O, 0.11%

Cs2O, 166 ppm Ta2O5, and 66 ppm Ga, Indicated, and 33.4 Mt at 1.33% Li 2O, 0.21% Cs2O, 155 ppm Ta2O5, and 65 ppm Ga, Inferred,

and is reported at a cut-off grade of 0.40% Li2O (open-pit), 0.60% Li2O (underground CV5), and 0.70% Li2O (underground CV13). A grade

constraint of 0.50% Cs2O was used to model the Rigel and Vega caesium zones. The Effective Date is June 20, 2025 (through drill hole CV24-

787). Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. Mineral Resources are i nclusive of

Mineral Reserves.

This news release has been approved by

“KEN BRINSDEN”

Kenneth Brinsden, President, CEO, & Managing Director

Olivier Caza-Lapointe

Head, Investor Relations

T: +1 (514) 913-5264

E: [email protected]

DISCLAIMER FOR FORWARD-LOOKING INFORMATION

This news release contains “forward -looking statements” and “forward -looking information”

within the meaning of applicable securities laws.

All statements, other than statements of present or historical facts, are forward -looking

statements. Forward -looking statements involve known and unknown risks, uncertainties and

assumptions and accordingly, actual results could differ materially from those expressed or implied

in such statements. You are hence cautioned not to place undue reliance on forward -looking

statements. Forward -looking statements are typically identified by words such as “plan”,

“development”, “growth”, “continued”, “intentions”, “expectations”, “emerging”, “evolving”,

“strategy”, “opportunities”, “anticipated”, “trends”, “potential”, “outlook”, “ability”, “additional”,

“on track”, “prospects”, “viability”, “estimated”, “reaches”, “enhancing”, “strengthen”, “target”,

“believes”, “next steps” or variations of such words and phrases or statements that certain actions,

events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved.

Forward-looking statements include, but are not limited to, statements concerning the

interpretation of the results from exploration, the exploration and development potential of

various zones the remaining interpretations from the 2025 drill campaign and future exploration

work, including the anticipated results therefrom, the advancement of the host rock and pegmatite

geological models for the Project , the bulk sample of mineralized pegmatite at CV5, which is

currently being permitted, the preparation and release of an updated Feasibility Study for the CV5

Pegmatite with the addition of tantalum as a co -product, as well as a Preliminary Economic

Assessment for the broader Project inclusive of lithium, caesium, and tantalum.

Forward-looking statements are based upon certain assumptions and other important factors that,

if untrue, could cause actual results to be materially different from future results expressed or

implied by such statements. There can be no assurance that forward-looking statements will prove

to be accurate. Key assumptions upon which the Company’s forward-looking information is based

include, without limitation, the ability to make discoveries, the potential of each of tantalum,

lithium, caesium as a co-product, , the ability to complete an updated Feasibility Study for the CV5

Pegmatite with the addition of tantalum as a co -product, as well as a Preliminary Economic

Assessment for the broader Project inclusive of lithium, caesium, and tantalum, that proposed

exploration work on the Property and the results therefrom will continue as expected, the

accuracy of reserve and resource estimates, the classification of resources and the assumptions

on which the reserve and resource estimates are based, long -term demand for lithium

(spodumene), tantalum (tantalite), and caesium (pollucite) supply, and that exploration and

development results continue to support management’s current plans for the Property’s

development.

Forward-looking statements are also subject to risks and uncertainties facing the Company’s

business, any of which could have a material adverse effect on the Company’s business, financial

condition, results of operations and growth prospects. Readers shou ld review the detailed risk

discussion in the Company’s most recent Annual Information Form filed on SEDAR+, for a fuller

understanding of the risks and uncertainties that affect the Company’s business and operations.

Although the Company believes its expectations are based upon reasonable assumptions and has

attempted to identify important factors that could cause actual actions, events or results to differ

materially from those described in forward -looking statements, there may be other factors that

cause actions, events or results not to be as anticipated, estimated or intended. There can be no

assurance that forward -looking information will prove to be accurate. If any of the risks or

uncertainties mentioned above, w hich are not exhaustive, materialize, actual results may vary

materially from those anticipated in the forward-looking statements.

The forward -looking statements contained herein are made only as of the date hereof. The

Company disclaims any intention or obligation to update or revise any forward-looking statements,

whether as a result of new information, future events or otherwise, except to the extent required

by applicable law. The Company qualifies all of its forward-looking statements by these cautionary

statements.

COMPETENT PERSON STATEMENT (ASX LISTING RULES)

The information in this news release that relates to the Feasibility Study (“FS”) for the

Shaakichiuwaanaan Project, which was first reported by the Company in a market announcement

titled “ PMET Resources Delivers Positive CV5 Lithium -Only Feasibility Study for its Large -Scale

Shaakichiuwaanaan Project” dated October 20, 2025 (Montreal time) is available on the Company’s

website at www.pmet.ca, on SEDAR+ at www.sedarplus.ca and on the ASX website at

www.asx.com.au. The production target from the Feasibility Study referred to in this news release

was reported by the Company in accordance with ASX Listing Rule 5.16 on the date of the original

announcement. The Company confirms that, as of the date of this news releas e, all material

assumptions and technical parameters underpinning the production target in the original

announcement continue to apply and have not materially changed.

The Mineral Resource and Mineral Reserve Estimates in this release were first reported by the

Company in accordance with ASX Listing Rule 5.8 in market announcements titled "World's Largest

Pollucite-Hosted Caesium Pegmatite Deposit " dated July 20, 2025 (Montreal time) and “ PMET

Resources Delivers Positive CV5 Lithium -Only Feasibility Study for its Large -Scale Shaakichiuwaanaan

Project” dated October 20, 2025 (Montreal time) and are available on the Company’s website at

www.pmet.ca, on SEDAR+ at www.sedarplus.ca and on the ASX website at www.asx.com.au. The

Company confirms that, as of the date of this news release, it is not aware of any new information

or data verified by the competent person that materially affects the information included in the

relevant announcement and that all material assumption s and technical parameters underpinning

the estimates in the relevant announcement continue to apply and have not materially changed.

The Company confirms that, as at the date of this announcement, the form and context in which