Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PMET.TO ·

Share issuance to VW Group

Share Capital & Compensation

PMET Resources Inc.

Suite 900 - 1801 McGill College, Montreal, Qc, Canada, H3A 1Z4

www.pmet.ca / TSX: PMET / ASX: PMT / OTC: PMETF / FSE: R9GA

1

Share issuance to VW Group

December 18, 2025 – Montréal, QC, Canada December 19, 2025 – Sydney, Australia

PMET Resources Inc. (the “Company” or “PMET”) (TSX: PMET) (ASX: PMT)

(OTCQX: PMETF) (FSE: R9GA) is pleased to advise that its largest strategic investor,

Volkswagen Finance Luxemburg S.A. ( Volkswagen), has accepted an offer by the Company to

subscribe for 89,125 fully paid common shares in the Company at an issue price of $4.03 per share,

pursuant to the Investor Rights Agreement with the Company , for aggregate gross proceeds of

approximately $359,000. The Company expects to use such proceeds for general c orporate

purposes.

Volkswagen's subscription follows the recent issuance of shares by the Company to Azimut

Exploration Inc. and SOQUEM Inc at a deemed issue price of $3.68 per share as part of the Pikwa

acquisition announced on 12 November 2025.

The Toronto Stock Exchange has conditionally approved the issuance of the 89,125 shares to

Volkswagen. The shares will be issued in accordance with the Company’s existing placement

capacity under the ASX Listing Rule 7.1.

About PMET Resources Inc.

PMET Resources Inc. is a pegmatite critical mineral exploration and development company focused

on advancing its district -scale 100% -owned Shaakichiuwaanaan Property located in the Eeyou

Istchee James Bay region of Quebec, Canada, which is accessible year -round by all -season road

and proximal to regional hydro-power infrastructure.

In late 2025, the Company announced a positive lithium-only Feasibility Study on the CV5

Pegmatite (the “Feasibility Study”) and declared a maiden Mineral Reserve of 84.3 Mt at 1.26%

Li2O (Probable)1. The study outlines the potential for a competitive and globally significant high -

grade lithium project targeting up to ~800 ktpa spodumene concentrate using a simple Dense

Media Separation (“DMS”) only process flowsheet. Further, t he results highlight

Shaakichiuwaanaan as a potential North American critical mineral powerhouse with significant

opportunity for tantalum and caesium in addition to lithium.

1 See Feasibility news release dated October 20, 2025. Probable Mineral Reserve c ut-off grade is 0.40% Li2O (open-pit) and 0.70% Li 2O

(underground). Underground development and open -pit marginal tonnage containing material above 0.37% Li 2O are also included in the

statement. Effective Date of September 11, 2025.

2

The Project hosts a Consolidated Mineral Resource2 totalling 108.0 Mt at 1.40% Li2O and 166 ppm

Ta2O5 (Indicated), and 33.4 Mt at 1.33% Li 2O and 155 ppm Ta 2O5 (Inferred), and ranks as the

largest3 lithium pegmatite resource in the Americas, and in the top ten globally. Additionally, t he

Project hosts the world’s largest pollucite-hosted caesium pegmatite Mineral Resource at the Rigel

and Vega zones with 0.69 Mt at 4.40% Cs2O (Indicated), and 1.70 Mt at 2.40% Cs2O (Inferred).

For further information, please contact us at [email protected] or by calling +1 (604) 279- 8709, or

visit www.pmet.ca. Please also refer to the Company’s continuous disclosure filings, available under

its profile at www.sedarplus.ca and www.asx.com.au, for available exploration data.

This news release has been approved by

“KEN BRINSDEN”

Kenneth Brinsden, President, CEO, & Managing Director

Olivier Caza-Lapointe

Head, Investor Relations

T: +1 (514) 913-5264

E: [email protected]

Qualified Person(s)

The technical and scientific information in this news release that relates to the Mineral Resource

Estimate and exploration results for the Company’s properties is based on, and fairly represents,

information compiled by Mr. Darren L. Smith, M.Sc., P.Geo., who is a Qualified Person as defined

by National Instrument 43 -101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) , and

member in good standing with the Ordre des Géologues du Québec (Geologist Permit number

01968), and with the Association of Professional Engineers and Geoscientists of Alberta (member

number 87868). Mr. Smith has reviewed and approved the related technical information in this

news release.

Mr. Smith is an Executive and Vice President of Exploration for PMET Resources Inc. and holds

common shares, Restricted Share Units (RSUs), and Performance Share Units (PSUs) in the

Company.

The information in this news release that relates to the Feasibility Study and Mineral Reserve

Estimate is based on, and fairly represents, information compiled by Mr. Frédéric Mercier-Langevin,

Ing. M.Sc., who is a Qualified Person as defined by NI 43-101, and member in good standing with

the Ordre des Ingénieurs du Québec. Mr. Mercier-Langevin has reviewed and approved the related

technical information in this news release.

2 The Consolidated MRE (CV5 + CV13 pegmatites), which includes the Rigel and Vega caesium zones, totals 108.0 Mt at 1.40% Li2O, 0.11%

Cs2O, 166 ppm Ta2O5, and 66 ppm Ga, Indicated, and 33.4 Mt at 1.33% Li 2O, 0.21% Cs2O, 155 ppm Ta2O5, and 65 ppm Ga, Inferred,

and is reported at a cut-off grade of 0.40% Li2O (open-pit), 0.60% Li2O (underground CV5), and 0.70% Li2O (underground CV13). A grade

constraint of 0.50% Cs2O was used to model the Rigel and Vega caesium zones. The Effective Date is June 20, 2025 (through drill hole CV24-

787). Mineral Resources are not Mineral Reserves as they do not have demonstrated economic viability. Mineral Resources are inclusive of

Mineral Reserves.

3 Determination based on Mineral Resource data, sourced through July 11, 2025, from corporate disclosure.

3

Mr. Mercier-Langevin is the Chief Operating and Development Officer for PMET Resources Inc.

and holds common shares, options, Restricted Share Units (RSUs), and Performance Share Units

(PSUs) in the Company.

Competent Person Statement (ASX Listing Rules)

The information in this news release that relates to the Feasibility Study (“FS”) for the

Shaakichiuwaanaan Project, which was first reported by the Company in a market announcement

titled “ PMET Resources Delivers Positive CV5 Lithium -Only Feasibility Study for its Large -Scale

Shaakichiuwaanaan Project” dated October 20, 2025 (Montreal time) is available on the Company’s

website at www.pmet.ca , on SEDAR+ at www.sedarplus.ca and on the ASX website at

www.asx.com.au. The production target from the Feasibility Study referred to in this news release

was reported by the Company in accordance with ASX Listing Rule 5.16 on the date of the original

announcement. The Company confirms that, as of the date of this news release, all material

assumptions and technical paramete rs underpinning the production target in the original

announcement continue to apply and have not materially changed.

The Mineral Resource and Mineral Reserve Estimates in this release were first reported by the

Company in accordance with ASX Listing Rule 5.8 and 5.9 in market announcements titled "World's

Largest Pollucite-Hosted Caesium Pegmatite Deposit" dated July 20, 2025 (Montreal time) and “PMET

Resources Delivers Positive CV5 Lithium -Only Feasibility Study for its Large- Scale Shaakichiuwaanaan

Project” dated October 20, 2025 (Montreal time) and are available on the Company’s website at

www.pmet.ca, on SEDAR+ at www.sedarplus.ca and on the ASX website at www.asx.com.au. The

Company confirms that, as of the date of this news release, it is not aware of any new information

or data verified by the competent person that materially affects the information included in the

relevant announcement and that all material assumptions and technical parameters underpinning

the estimates in the relevant announcement continue to apply and have not materially changed.

The Company confirms that, as at the date of this announcement, the form and context in which

the competent person’s findings are presented have not been materially modified from the original

market announcement.