Drill Results

Patriot Battery Metals Inc.

Suite 700 - 838 W. Hastings Street, Vancouver, BC, Canada, V6C 0A6

www.patriotbatterymetals.com TSX-V: PMET / ASX: PMT / OTC: PMETF / FSE: R9GA

LEGAL\63309512\1

Patriot Discovers New High-Grade Zone at the CV13 Spodumene

Pegmatite, Corvette Property, Quebec, Canada

October 18, 2023 – Vancouver, BC, Canada October 19, 2023 – Sydney, Australia

Highlights

• Discovery of new high-grade zone (with sample ranges including 3 – 5% Li2O) near-

surface at the CV13 Spodumene Pegmatite.

o 12.7 m at 2.46% Li 2O ( 73.3 m to 86.0 m), including 7.6 m at 3.82% Li 2O

(CV23-191).

o 8.0 m at 2. 86% Li 2O ( 57.2 m to 65.2 m), including 4.3 m at 5.03 % Li 2O

(CV23-195).

o 10.2 m at 2.70% Li 2O ( 56.3 m to 66.5 m), including 5.8 m at 4.48% Li 2O

(CV23-198)

o 10.7 m at 2.79% Li 2O (67.0 m to 77.7 m), including 7.3 m at 3.94% Li 2O

(CV23-200)

• The CV13 Spodumene Pegmatite trend extends over an approximate 2.3 km strike length

through multiple outcrop exposures, of which, approximately 1.1 km has now been traced

continuously by drilling – remains open along strike at both ends and to depth.

• With significant mineralization now delineated further west at CV5 and at CV13, there are

now several options for the mining starter pit.

• Company continues to drill westward from CV5 towards CV13 to test potential

connectivity.

• Thirty-seven (37) drill holes, totalling approximately 7,300 m, have been completed in

2023 through October 9 at the CV13 Spodumene Pegmatite.

• Additional rig now coring for a total of eight (8) drill rigs currently active at site – four (4)

at CV5, three (3) at CV13, and one (1) at CV9. Drilling is anticipated to ramp up further

after the holidays with ten (10) drill rigs anticipated by mid January 2024.

Darren L. Smith, Company Vice President of Exploration, comments: “Drilling at CV13 has

progressed steadily since our recommencement of activities in August, with results continuing to

support the interpretation of an extensive, shallow-dipping and near-surface spodumene pegmatite

dyke. The discovery announced today of a +3% Li 2O high-grade zone at CV13, now traced over

multiple drill holes, is reminiscent of the high -grade Nova Zone at CV5. As we continue to close

the distance between CV5 and CV13 through drilling, this newly discovered high -grade zone at

CV13, coupled with the large spodumene crystals observed (up to 1.3 m in drill core), supports

the interpretation that both share the same “plumbing” system.

Further highlights include;

• Metallurgy results to date provide a strong indication that material from both the CV13

Spodumene Pegmatite and CV5 Spodumene Pegmatite may be processed jointly using the

same design criteria and flowsheet, and therefore, processable at the same plant.

o Fe2O3 contents of <0.70% consistently demonstrated in final spodumene

concentrates produced from both the CV5 and CV13 pegmatites following heavy

liquid separation (HLS) and magnetic separation at the bench scale.

• Assays are pending for the vast majority of drill holes completed over the summer -fall

program. The Company will update the market as material sets of assays return from the

labs. The Company expects to provide an updated mineral resource estimate in mid-2024.

Patriot Battery Metals Inc. (the “Company” or “Patriot”) ( TSX-V: PMET) (ASX: PMT)

(OTCQX: PMETF) (FSE: R9GA) is pleased to announce core assays for the first series of drill

holes completed at the CV13 Spodumene Pegmatite as part of the ongoing 2023 summer-fall drill

program being completed at its wholly owned Corvette Property (the “Property” or “Project”),

located in the Eeyou Istchee James Bay region of Quebec. At the Property, the CV13 Spodumene

Pegmatite is located approximately 3.15 km along strike to the southwest of the CV5 Spodumene

Pegmatite. The CV5 Spodumene Pegmatite, with a maiden mineral resource estimate of 109.2 Mt

at 1.42% Li2O inferred1, is situated approximately 13.5 km south of the regional and all -weather

Trans-Taiga Road and powerline infrastructure.

Core assay results from the first series of drill holes completed this year at the CV13 Spodumene

Pegmatite have returned the highest -grade assays reported to date (Figure 1 and Figure 2, Table

1). Specifically, these drill holes have identified a newly discovered high- grade lithium zone –

12.7 m at 2.46% Li 2O, including 7.6 m at 3.82% Li 2O (CV23-191), 8.0 m at 2.86% Li 2O,

including 4.3 m at 5.03% Li 2O (CV23-195), 10.2 m at 2.70% Li 2O, including 5.8 m at 4.48%

Li2O (CV23-198), and 10.7 m at 2.79% Li 2O, including 7.3 m at 3.94% Li 2O (CV23-200).

Additionally, drill hole CV23-195 returned two (2) samples assaying greater than 6% Li 2O,

including 1.2 m at 6.41% Li2O.

The new high-grade zone at CV13 is located near-surface (~40-50 m vertical depth), and remains

open in multiple directions with a current strike length of approximately 170 m. Additionally, in

an adjacent drill hole (CV23-271), situated approximately 60 m to the west, an approximate 1.3 m

long, inclusion-free, and cream -white spodumene crystal was intersected (Figure 3) – assays

pending – and may represent an extension of this high-grade zone. Such high grades of lithium are

not typical in Li-Cs-Ta (“LCT”) pegmatite systems and this, coupled with the very large sizes of

spodumene crystals, highlight the unique and world-class nature of the LCT pegmatite system at

Corvette.

The discovery of a new and near-surface high-grade zone at CV13 provides multiple opportunities,

that the Company will investigate, for defining an initial production location(s) (i.e., mining starter

pit) that is complimentary to the CV5 mineral resource. With significant mineralization now

delineated further west at CV5 and at CV13, lake development at CV5 could come later in the

mine schedule.

The principal spodumene pegmatite dyke at CV13 (the “upper” dyke) is geologically modelled to

be shallowly dipping to the north, covering an extensive a rea, and remains open along strike at

both ends and to depth. A cross-section of the western portion of the CV13 Spodumene Pegmatite’s

current geological model is presented in Figure 4. The mineralized trend at CV13 extends for

approximately 2.3 km as defined by outcrop and drilling through 2022. The drill holes completed

in 2023 along this trend have now confirmed a continuous, variably mineralized spodumene

pegmatite extending along at least 1.1 km of this trend and remains open.

Pegmatite intersections of the upper dyke are up to 26 m (core length) over the thirty -seven (37)

drill holes (~ 7,300 m) completed in 2023 through October 9. A “lower” pegmatite dyke , which

also has a shallow and northerly dip, has been tested in multiple drill holes in 2023; however,

remains of secondary focus at this time due to more variability in thickness and mineralization.

The very high grades of lithium in drill core returned from CV13 to date, coupled with the large

spodumene crystals a s well as similar textures and gangue mineralogy as CV5, supports the

interpretation that both CV13 and CV5 share the same plumbing system and may potentially form

one continuous pegmatite body subsurface. However, a significant amount of drill testing remains

to be completed along this corridor to confirm this interpretation. Through September 18, 2023,

drilling had closed the gap between the CV13 and CV5 spodumene pegmatites to approximately

3.15 km (Figure 5, see news release dated September 24, 2023).

CV13 Metallurgy

A heavy liquid separation (HLS) test program assessed the liberation and recovery characteristics

of spodumene at different locations along the collective ~2.3- km trend that defines the CV13

Pegmatite (see news release dated July 4, 2023). The testwork returned very positive results with

lithium recoveries ranging from 67% to 77% at an interpolated spodumene concentrate grade of

6.00% Li2O and <0.70% Fe2O3. Recoveries also remained strong on the lower grade samples,

which is a testament to the coarse -grained nature of the spodumene making it more amenable to

liberation. Collectively, the preliminary HLS results strongly indicate that a dense media

separation (DMS) only operation at CV13 is applicable.

To date, the metallurgical data collected from CV5 and CV13 is highly encouraging and

demonstrates that a DMS only flowsheet is applicable to both pegmatites. Further, the data

suggests that both pegmatites could be jointly crushed and feed the same process plant, while

maintaining high recoveries into a marketable spodumene concentrate of +5.5% Li2O.

Due to the road closures in western parts of the Eeyou Istchee James Bay extending significantly

past the date in which the Company was able to re-commence drill operations at the Property, the

delivery of drill core samples to the laboratory was significantly delayed. However, core samples

from a large number of drill holes have now arrived at the laboratory with processing underway.

Results will be reported in batches as received.

Figure 1: Drill holes completed at the CV13 Spodumene Pegmatite through October 9, 2023.

Figure 2: Oblique view of the CV13 Spodumene Pegmatite’s geological model over the newly discovered

and near-surface high-grade zone.

Figure 3: Very ‘clean’ spodumene crystal of ~1.3 m in length – drill hole CV23-271 – at the CV13

Spodumene Pegmatite.

Figure 4: Cross-section of the CV13 Spodumene Pegmatite’s geological model, located at the western end

of the current drilling. Core assay results pending for CV23-238, 242, 263, and 269.

Figure 5: Proximity of the CV5 Spodumene Pegmatite to the CV13 Spodumene Pegmatite.

Table 1: Core assay summary for drill holes reported herein at the CV13 Spodumene Pegmatite

Hole ID From

(m)

To

(m)

Interval

(m)

Li2O

(%)

Ta2O5

(ppm) Comments

CV23-191 73.3 86.0 12.7 2.46 147

incl. 75.8 83.5 7.6 3.82 145

CV23-195 57.2 65.2 8.0 2.86 378

incl. 58.2 62.5 4.3 5.03 261

or 61.3 62.5 1.2 6.41 154

238.4 242.8 4.5 0.04 80

CV23-198 56.3 66.5 10.2 2.70 265

incl. 57.2 63.0 5.8 4.48 265

CV23-200 67.0 77.7 10.7 2.79 99

incl. 68.0 75.3 7.3 3.94 99

CV23-204 50.0 54.8 4.8 1.94 599

incl. 52.0 54.0 2.0 4.39 1,273 Lepidolite zone

(1) All intervals are core length and presented for all pegmatite intervals >2 m