Drilling Update at Playfair’s RKV Project in Norway

Exploration Programs

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

NEWS RELEASE

224-470 Granville St. Tel: 604 687-7178 PLY: TSX-V

Vancouver, B.C. Fax: 604 687-7179 P1J1 (Frankfurt)

Canada V6C 1V5 Toll Free: 888-244-6644 PLYFF (OTC)

August 12, 2022

Drilling Update at Playfair’s RKV Project in Norway

Playfair is now drilling the Sæterfjellet MMI target having competed initial drilling at the Røstvangen and

Kletten MMI targets. At Røstvangen a total of 544m were drilled in 11 holes while six holes totalling 439m

were drilled at Kletten. Drill core logging, cutting, and sampling has been completed at Røstvangen. A total of

88 samples, including blanks, standards and duplicates are being shipped for analysis. Drill core from Kletten

has now been moved from the field to our facility in Tynset where core logging is in progress.

Playfair has made Drill Notifications covering its 2022 drill program at RKV for 33 initial drillholes and up to 107

additional holes for a total of 140 holes dependent on results. All notifications and necessary permits are

in place.

In 2021 initial drilling was carried out at the Rødalen and Storboren targets, further drilling at Storboren is

planned in 2022 following completion of drilling at the Sæterfjellet target.

Page 2 of 3

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

Don Moore, CEO of Playfair, comments: “Our drilling and support team in Norway is doing an

incredible job, The exploration technique requires numerous drill moves at each of our seven

targets. Considerable effort has been made ‘to protect nature’ and gain the support of the local

Municipality with very positive results. We truly appreciate the growing support. We continue to

press forward with the objective of finishing up this phase of drilling by mid-September.”

Røstvangen Kletten

Playfair is using a drilling machine which can be disassembled for moving between drillholes. Although

lightweight, the drill is capable of drilling to 150m depth using BQ sized rods (36.5 mm or 1.437 inches core

diameter) and to 100m depth using NQ sized rods (47.8mm or 1.872 inches core diameter).

The man-portable drill team is supervised by Canadian drillers, No Limit Diamond Drilling. Local “Muskelgutta”

(Muscle Guys) are again rising to the challenge of moving the man-portable drill when required. Local

community support continues to be greatly appreciated.

Promin AS, a Trondheim-based consultancy with extensive experience in the Norwegian Mining industry,

provides logistical support and experienced geologists.

Overall management and execution of Playfair’s RKV drilling program is provided by Ronacher McKenzie

Geoscience Inc., an independent consulting group, who, as part of their supervision, will ensure that

Page 3 of 3

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

appropriate quality assurance/quality control (QA/QC) protocols are in place. RMG follows the Canadian

Institute of Mining, Metallurgy and Petroleum’s (CIM) Best Practices.

The technical contents of this release were approved by Greg Davison, PGeo, a qualified person as defined by

National Instrument 43-101.

The road to a cleaner environment includes electric vehicles. Electric vehicles

need copper, nickel, and cobalt. There is no green future without minerals.

For further information visit our website at www.playfairmining.com or contact:

Donald G. Moore D. Neil Briggs

CEO and Director Director

Phone: 604-377-9220 Phone: 604-562-2578

Email: [email protected] Email: [email protected]

Forward-Looking Statements: This Playfair Mining Ltd News Release may contain certain "forward-looking" statements and information relating to Playfair

which are based on the beliefs of Playfair management, as well as assumptions made by and information currently available to Playfair management.

Such statements reflect the current risks, uncertainties and assumptions related to certain factors including, without limita tions, exploration and

development risks, expenditure and financing requirements, title matters, operating hazards, metal prices, political and economic factors, competitive

factors, general economic conditions, relationships with vendors and strategic partners, governmental regulation and supervis ion, seasonality,

technological change, industry practices, and one-time events. Should any one or more of these risks or uncertainties materialize or change, or should

any underlying assumptions prove incorrect, actual results and forward-looking statements may vary materially from those described herein.