Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PHNM.V ·

Phenom Reports Carlin Drilling Results

Drill Results

Phenom Reports Carlin Drilling Results

January 11, 2024 - Vancouver, British Columbia – Phenom Resources Corp. (TSX-V: PHNM) (OTCQX ®:

PHNMF) (FSE: 1PY 0) (“Phenom” or the “ Company”) is pleased to announce results from the reverse

circulation drill holes RC23-17 and RC23-18 both planned as a 2,000 foot depth test of the gold system at the

Carlin Gold-Vanadium Project in the Carlin Gold Trend of Nevada. RC23-17 was abandoned at 500 feet due to

difficult rock conditions. RC23-18 was drilled to a depth of 1900 feet. The two holes were collared 90 metres

apart, both near vertical tests and encountered a near-surface mineralized vanadium zone.

Hole RC23-17 encountered the 22.86 metres (75 feet) vanadium unit starting at a depth of 74.68 metres (245

feet) and returned an average grade of 0.48% V 205 Hole RC23-18 encountered the 15.24 metres (50 feet)

vanadium unit starting at a depth of 3.05 metres (10 feet) and returned an average grade of 0.41% V205. True

thicknesses of the two intercepts are not known. The nearest neighbour holes to RC23-17 and RC23-18 were

R-128 and DDH-4 each about 90 metres away and encountered 13.7m (44 feet) @ 0.51% V205 and 7.0 m (22

feet) @ 0.91% V205%, respectively.

These intercepts are now the southernmost drillholes through the vanadium deposit, resulting in extending

the deposit a further 90 metres (295 feet). The vanadium deposit still remains open southward, westward and

northwestward for further expansion.

RC23-17 did not penetrate deep enough to test the gold target. RC23 -18 encountered upper plate rocks

followed by moderate to strongly altered (silicified -dolomite and quartz stringer ed-sulfide bearing and

broken) Mississippian-aged Chainman Formation. The bottom 71.6 metres (235 feet) of the hole encountered

continuous geochemically elevated gold values. From all of this, Dave Mathewson interprets that due to

structural complexities the hole appears to be located a bit too far to the east and within the graben to

properly test the gold target . On a positive note, the Chainman rocks were exceptionally altered and

mineralized which indicated the gold system is there without question. He considers a hole placed to the west

is justifiable to properly test the target in this area.

Dave Mathewson states, “My convictions remain strong and undeterred on the opportunity in our gold system

on the Carlin Gold-Vanadium property. We took a very good shot 800 metres south of hole RC22-16, at a very

good target that has multiple clues with RC23-17 and 18 and still remains untested. The other high priority

target is the area around RC22-16 which remains very favourable for a gold discovery.”

Dave Mathewson continues, “I view all of our 3 gold projects as selective high impact target opportunities.

Having said that, there is always a need to prioritize the deployment of our shareholders’ money for best gains

according to our best judgement. As such, to continue our gold momentum, I am excited to next be drill testing

our Dobbin and Crescent Valley gold projects in Nevada this summer which are shallower less expensive gold

tests than at Carlin and for that reason will be prioritized ahead of drill testing next at Carlin.”

About Phenom Resources Corp.

Phenom has 100% interest in the Carlin Gold-Vanadium Project, located in Elko County , 6 miles south from

the town of Carlin, Nevada and Highway I-80 which hosts the Carlin Vanadium deposit, North America’s largest

highest grade primary vanadium resource. The Project lies in the Carlin Gold Trend. Approximately 9 million

ounces comprised of multiple gold deposits, including past producing mines, are present near the Phenom

property (5-15km).

ON BEHALF OF PHENOM RESOURCES CORP.

2

per: "Paul Cowley"

CEO & President

(604) 340-7711 [email protected] www.phenomresources.com

Technical disclosure in this news release has been reviewed and approved by Dave Mathewson, a Qualified Person

as defined by National Instrument 43-101 and director of the Company.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-looking information

Certain statements in this news release constitute "forward-looking" statements. These statements relate to future events or the

Company's future performance . All such statements involve substantial known and unknown risks, uncertainties and other factors

which may cause the actual results to vary from those expressed or implied by such forward -looking statements. Forward -looking

statements involve significant risks and uncertainties, they should not be read as guarantees of future perform ance or results, and

they will not necessarily be accurate indication s of whether or not such results will be achieved. Actual results could differ materially

from those anticipated due to a number of factors and risks. Although the forward-looking statements contained in this news release

are based upon what management of the Company believes are reasonable assumptions on the date of this news release, the

Company cannot assure investors that actual results w ill be consistent with these forward -looking statements. The forward -looking

statements contained in this press relea se are made as of the date hereof and the Company disclaims any intention or obligation to

update or revise any forward -looking statements whether as a result of new information, future events or otherwise, except as

required under applicable securities regulations.