Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PHNM.V ·

First Vanadium Step‐out Drilling Expands the Carlin Vanadium Deposit

Exploration Programs

First Vanadium Step‐out Drilling Expands the Carlin Vanadium Deposit  

November  7,  2018  ‐  Vancouver,  British  Columbia –  First  Vanadium  Corp.  (formerly  Cornerstone  Metals 

Inc.) (TSX‐V: FVAN) (OTCQX: CCCCF) (FSE: 1PY)  (“First Vanadium” or the “Company”) is pleased to announce 

that  it  has  expanded  the  Carlin  Vanadium  Deposit  with  the  result s  f r o m  1 0  s t e p ‐ o u t  h o l e s  f r o m  t h e  6 9  

reverse circulation drill holes from its Phase 2 drilling on th e Carlin Vanadium Project, located 6 miles south 

of  Carlin,  Nevada.  The  objectives  of  this  drill  program  are  both  to  infill  and  expand  the  Carlin  Vanadium 

deposit. There were 33 step‐out holes of the 69 holes drilled t hat were aimed at expanding the deposit. Only 

results from 10 of those step‐out holes are available and reported below.  

Holes  RCC18‐11  through  RCC18‐14, RCC18‐27  through  RCC18‐29  and RCC18‐34  focused  in  a  300m  x  220m 

untested  area  beyond  the  known  limits  of  the  deposit.  This  dril ling  proved  continuity  of  shallow  near 

horizontal mineralization, connecting to the nearest previous d rill holes R‐33, R‐63, and DDC17‐003 through 

DDC17‐005. The average thickness of the zone in this new area i s 18.7m (61ft) thick with an average grade of 

0.60% V2O5. A figure has been placed on the Company website to  demonstrate the location of these holes 

and this new area (https://firstvanadium.com/images/projects/Figure_for_News_release_Nov_7.jpg). 

“This  is  an  excellent  start  to  the  deposit  expansion,  with  inter c e p t s  o f  g o o d  g r a d e  a n d  t h i c k n e s s  s o  n e a r  

surface  in  a  flat  valley.  This  new  area  of  mineralization,  still  o p e n  t o  t h e  n o r t h ,  i s  a  p o s i t i v e  i m p a c t  t o  t h e  

project and will factor into a resource estimate expected to be  completed before the end of the year”, said 

First  Vanadium  President  and  Chief  Executive  Officer  Paul  Cowley.  “There  are  pending  assay  results  on  a 

further 23 step‐out holes that aimed at expanding the deposit.” 

Expansion Drilling Highlights: 

Drillhole ID From (m) To (m) Length (m) From (ft) To (ft) Length (ft) V2O5 (%)

RCC18‐11 6.10 33.53 27.43 20 110 90 0.44

RCC18‐12 15.24 30.48 15.24 50 100 50 0.45

RCC18‐13 3.05 9.14 6.09 10 30 20 0.32

RCC18‐14 0.00 7.62 7.62 0 25 25 0.25

RCC18‐27 16.76 22.86 6.10 55 75 20 0.55

RCC18‐28 9.14 41.15 32.01 30 135 105 0.81

RCC18‐29 21.34 28.96 7.62 70 95 25 0.52

RCC18‐34 6.10 24.38 18.28 20 80 60 0.40

R‐33* 1.52 30.48 28.96 5 100 95 0.95

R‐63* 0.00 28.96 28.96 0 95 95 0.55

DDC17‐003* 15.85 30.50 14.65 52 100 48 0.68

DDC17‐004* 0.00 20.50 20.50 0 67.25 67.25 0.75

DDC17‐005* 1.52 30.48 28.96 5 100 95 1.12

*Previously reported  

Holes RCC18‐07 and RCC18‐10 located south of the area described  above (see figure) returned multiple near 

surface  flat‐lying  mineralized  intervals  from  6m  (20ft)  to  20m (65ft)  thick  grading  between  0.2  and  0.25% 

V2O5. 

All holes reported here are vertical; thus, drill intercepts are considered true thickness. 

Combining the 1960’s Union Carbide drilling with the Company’s  winter 2018 diamond drilling program and 

its Phase 2 summer reverse circulation drilling, the Carlin Van adium deposit is now defined by 216 drill holes. 

The program was supervised by the Company’s Qualified Person, Paul Cowley, P.Geo., and President and CEO 

of  the  Company.  Industry  standard  QAQC  practices  were  followed.  A n a l y s e s  w e r e  p e r f o r m e d  b y  M S  

Analytical of Langley, BC, an I SO 17025 Accredited laboratory.  Further results will be forthcoming. Once  all 

drill results have been received, the Company will initiate a new resource estimate. 

The  Carlin  Vanadium  deposit  is  considered  the  largest,  highest grade  primary  vanadium  deposit  in  North 

America  (USGS  Professional  Paper  1802  Critical  Mineral  Resources  of  the  United  States—Economic  and 

Environmental Geology and Prospects for Future Supply dated December 18, 2017).  

Vanadium prices for 98% flake V2O5 have steadily risen from und er US$3.00/lb less than 3 years ago. Last  

week’s  prices  reached  over  US$33/lb,  reflecting  the  higher  dema nd  for  vanadium  over  its  tight  supply, 

globally.    

Vanadium  is  growing  in  importanc e  for  key  industrial  manufactur ing  sectors  most  notably  steel  and 

renewable  energy.  Today,  more  than  85  percent  of  the  world’s  vanadium  is  used  in  steel  manufacturing 

applications.  Its  importance  to  the  energy  sector  is  also  growi ng  rapidly  with  more  than  10  percent  of 

vanadium production used in energy storage where its substantia l cost and performance benefits make it an 

alternative choice to lithium ion in several areas.  

About First Vanadium Corp. 

First  Vanadium  (formerly  Cornerstone  Metals  Inc.)  has  an  option   to  earn  a  100%  interest  in  the  Carlin 

Vanadium Project, located in Elko County 6miles south from the town of Carlin, Nevada. The Carlin Vanadium 

Project hosts the Carlin Vanadium Deposit which is flat to shal low dipping and at shallow depths, 0‐60 m (0‐

200 ft) below surface. 

ON BEHALF OF FIRST VANADIUM CORP.  

per: "Paul Cowley" 

CEO & President 

(604) 340‐7711 

[email protected]  

www.firstvanadium.com

Technical disclosure in this news release has been reviewed and approved by Paul Cowley, P.Geo., a Qualified 

Person as defined by National Instrument 43‐101, and President and CEO of the Company. 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of 

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 

Forward‐looking information  

Certain statements in this news release constitute "forward‐loo king" statements. These statements relate to 

future events or the Company's f uture performance and include t he Company’s ability to meet the conditions 

required to exercise in full its option to acquire the Carlin V anadium project and with respect to current and 

planned drill programs, the results of exploration programs, me tallurgical test work, and changes in mineral 

resources. All such statements i nvolve substantial known and un known risks, uncertainties and other factors 

which  may  cause  the  actual  results  to  vary  from  those  expressed   or  implied  by  such  forward‐looking 

statements.  Forward‐looking  statements  involve  significant  risks  and  uncertainties,  they  should  not  be  read 

as  guarantees  of  future  performance  or  results,  and  they  will  no t  n e c e s s a r i l y  b e  a c c u r a t e  i n d i c a t i o n s  o f  

whether or not such results will be achieved. Actual results co uld differ materially from those anticipated due 

to a number of factors and risks. Although the forward‐looking  statements contained in this news release are 

based upon what management of the Company believes are reasonab le assumptions on the date of this news 

release, the Company cannot assure investors that actual results will be consistent with these forward‐looking 

statements. The forward‐looking statements contained in this pr ess release are made as of the date hereof 

and  the  Company  disclaims  any  intention  or  obligation  to  update  or  revise  any  forward‐looking  statements 

whether  as  a  result  of  new  information,  future  events  or  otherwise,  except  as  required  under  applicable 

securities regulations.