Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PHNM.V ·

First Vanadium Corp. Files NI 43‐101 Technical Report for the Carlin Vanadium Project, Nevada

Resource Estimates Technical Reports (NI 43-101)

First Vanadium Corp. Files NI 43‐101 Technical Report for the Carlin Vanadium Project, Nevada 

April  10,  2019  ‐  Vancouver,  British  Columbia  – First  Vanadium  Corp.  (TSX‐V:  FVAN)  (OTCQX:  FVANF)  (FSE: 

1PY)  (“First  Vanadium”  o r  t h e  “Company”)  is  pleased  to  announce  that  a  National  Instrument  43‐101 

Technical Report titled “NI 43‐ 101 Technical Report, Carlin Van adium Project, Carlin, Nevada” has been filed 

on SEDAR (www.sedar.com). 

The report documents a maiden mineral resource estimate (Table  1) completed by SRK Consulting (U.S.), Inc. 

(“SRK”) on the Carlin Vanadium Deposit located 6 miles south of  Elko, Nevada, as initially reported by way of 

the Company’s news release dated February 27, 2019.  

Table 1.  Carlin Vanadium Mineral Resource Statement at 0.3% V 2O5 Cut‐off grade (CoG) (Effective January 31, 

2019) 

Classification  CoG (% V2O5)  Grade (% V2O5 )  Tons (in millions)  V2O5 lb (in millions)

Indicated  0.3  0.615  24.64  303 

Inferred  0.3  0.520  7.19  75 

1. Mineral Resources are not Mineral Reserves. Mineral resources which are not mineral reserves do not 

have demonstrated economic viability. There has been insufficie nt exploration to define the Inferred 

Resources  tabulated  above  as  an  Indicated  or  Measured  Mineral  Resource.    There  is  no  guarantee 

that any part of the mineral resources discussed herein will be  converted into a mineral reserve in the 

future.  

2. The  Mineral  Resources  in  this  estimate  were  calculated  using  th e  Canadian  Institute  of  Mining, 

Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resour ces and Reserves, Definitions and 

Guidelines  prepared  by  the  CIM  Standing  Committee  on  Reserve  Definitions  and  adopted  by  CIM 

Council. 

3. The mineral resources listed in Table 1 are confined within a W hittle Pit Shell with a 45⁰ pit slope and 

a  strip  ratio  of  2.6:1  waste  to  ore  including  all  categories.   The  following  parameters  were  used  to 

construct the Whittle pit shell and to derive the mineral resou rce cut‐off grade of 0.3% V 2O5: Metal 

prices: US$12.50/lb V 2O5 flake, Mining: US$2.50/t, Proce ssing: US$52.50/t, G&A: US$1.50 /t, Product 

Transport: $2.00/t, Process Recovery:  85%. 

4. Contained pounds may not add due to rounding. 

T h i s  i s  t h e  f i r s t  t i m e  I n d i c a t e d  m i n e r a l  r e s o u r c e s  h a v e  b e e n  e stablished  for  the  deposit.  The  resource  as 

defined  within  the  pit  shell  has  a  defined  strike  length  of  approximately  1,830  metres  (6,000  ft)  and  width 

averaging 610 metres (2,000 ft), starting at surface to depths  of 120 metres (395 ft).  The average thickness of 

the main mineralized zone is 35 metres (115 ft).  

The  Independent  Technical  Report  was  authored  by  Dr.  Bart  Stryh as,  PhD,  CPG.,  and  Ms.  Brooke  Miller 

Clarkson, CPG, of SRK and Mr. Frank Wright, P.Eng., of F. Wrigh t Consulting Inc. Messrs. Stryhas and Wright 

and Ms. Clarkson are Qualified Persons as defined by National I nstrument 43‐101 –  Standards of Disclosure 

for Mineral Projects of the Canadian Securities Ad ministrators (“NI 43‐101”). The r eport is filed on SEDAR and 

is available on First Vanadium’s website (click here to view full report). 

Sensitivity Table 

Sensitivity analysis of the Carlin Vanadium Project’s NI 43‐101 mineral resource estimate for V2O5 at various 

cutoff grades (CoG):

Classification  CoG (% V2O5)  Grade (% V2O5)  Tons (in millions)  V2O5 lb (in millions)

Indicated*1 

0.2  0.539  31.26  337 

0.3*2  0.615  24.64  303 

0.4  0.702  18.64  262 

0.5  0.776  14.44  224 

0.6  0.849  10.92  185 

0.7  0.929  7.80  145 

0.8  1.012  5.32  108 

Inferred*1 

0.2  0.450  9.72  87 

0.3*2  0.520  7.19  75 

0.4  0.596  4.94  59 

0.5  0.677  3.18  43 

0.6  0.745  2.08  31 

0.7  0.847  1.05  18 

0.8  0.959  0.53  10 

*1 Mineral Resources are not Minera l Reserves. Mineral resources w hich are not mineral reserves do not have 

demonstrated  economic  viability.  There  has  been  insufficient  exploration  to  define  the  Inferred  Resources 

tabulated above as an Indicated or Measured Mineral Resource.   There is no guarantee that any part of the 

mineral resources discussed herein will be converted into a mineral reserve in the future. 

*2 The Base Case reported resources are highlighted in bold and h ave been constrained within a US$12.50/lb 

V2O5 optimized pit shell described above. 

Technical disclosure in this news release has been reviewed and  approved by Paul Cowley, PGeo., a Qualified 

Person as defined by National Instrument 43‐101, and President and CEO of the Company. 

About First Vanadium Corp. 

First Vanadium has an option to earn a 100% interest in the Car lin Vanadium Project, located in Elko County, 6 

miles south of a major rail hub and mining community of Carlin,  Nevada, a major highway (I‐80) and power. 

The Carlin Vanadium Project host s the Carlin Vanadium deposit w hich is a black shale‐hosted flat to shallow 

dipping vanadium resource at shallow depths.  

ON BEHALF OF FIRST VANADIUM CORP.  

per: "Paul Cowley" 

CEO & President 

(778) 655‐4311 

[email protected]  

www.firstvanadium.com 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the 

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 

Forward‐looking information 

Certain  statements  in  this  news  release  constitute  "forward‐loo king"  statements.  These  statements  relate  to  future 

events  or  the  Company's  future  performance.  All  such  statements   involve  substantial  known  and  unknown  risks, 

uncertainties  and  other  factors  which  may  cause  the  actual  resul t s  t o  v a r y  f r o m  t h o s e  e x p r e s s e d  o r  i m p l i e d  b y  s u c h  

forward‐looking  statements.  Forward‐looking  statements  involve significant  risks  and  uncertainties,  they  should  not  be 

read as guarantees of future performance or results, and they w ill not necessarily be accurate  indications of whether or 

not such results will be achieve d. Actual results could differ  materially from those anticipated due to a number of factors 

and risks. Although the forward‐looking statements contained in  this news release are based upon what management of 

the Company believes are reasonable assumptions on the date of  this news release, the Company cannot assure investors 

that actual results will be consistent with these forward‐looking statements. The forward‐looking statements contained in 

this  press  release  are  made  as  of  the  date  hereof  and  the  Company  disclaims  any  intention  or  obligation  to  update  or 

r e v i s e  a n y  f o r w a r d ‐ l o o k i n g  s t a t e m e n t s  w h e t h e r  a s  a  r e s u l t  o f  n ew  information,  future  events  or  otherwise,  except  as 

required under applicable securities regulations.