Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PGZ.V ·

Pan Global Resources Intersects Massive Chalcopyrite in Two New Drill Holes at the Escacena Project, Spain

Exploration Programs

Pan Global Resources Intersects Massive

Chalcopyrite in Two New Drill Holes at the

Escacena Project, Spain

Vancouver, British Columbia--(Newsfile Corp. - September 29, 2020) -

Pan Global Resources Inc.

(TSXV:

PGZ

) (OTC:

PGNRF

) (the "Company") is pleased to report the ongoing Phase 3 drill program is

continuing to intersect copper mineralization at the La Romana copper target in the Escacena Project,

Iberian Pyrite Belt, southern Spain.

As reported in the Press Release of September 8, 2020, the first five drill holes of the current program all

returned visual copper mineralization.

Of significance, the next two recently completed drill holes (LRD14

to LRD15) have intersected massive chalcopyrite mineralization within a broad zone of stockwork pyrite-

chalcopyrite mineralization. Hole LRD014 intersected the massive chalcopyrite at a down hole depth of

224.1m (See Photo 1 below). Hole LRD015 was then drilled down dip to test the potential continuity of

the massive chalcopyrite zone. Hole LRD15 again intercepted massive chalcopyrite at a down hole

depth of 225.9m (See Photo 2 below). Both intercepts are being sent to the laboratory and assay results

are awaited. Down-hole geophysics is also planned following the recent drill holes.

Tim Moody, President and CEO of Pan Global commented:

"The intersections of massive chalcopyrite

mineralization in the two new drill holes is highly encouraging as we continue to expand the La

Romana target. Every hole drilled on the property to date has intercepted visual copper over wide

intervals, but these massive chalcopyrite intercepts could be very significant in terms of exploration

potential."

Mr. Moody added: "

Whilst we are awaiting assay results, the exploration continues to show excellent

potential for a significant new copper deposit commencing near to surface and wide open in several

directions. On the strength of the results of the new drilling, additional drill holes are now being

planned and preparations are being made to add a second drill rig."

The Company has completed seven drill holes (LRD09 to LRD15) as part of the Phase 3 drill program

for a total of 1377.95m. The program envisages approximately twenty-five drill holes and 3,500m aimed

at expanding the copper mineralization along strike, up and down dip from the previous drilling. Each of

the drill holes has intersected visual copper mineralization.

Previous drill highlights at La Romana include LRD02, which intersected

20.55m at 1.5% Cu

equivalent

from 37m, including

7m at 3.43% Cu

equivalent, and LRD-05 with

21m at 1.55% Cu

equivalent from

12m, including

11m at 2.60% Cu

equivalent.

Drill holes

LRD14 and LRD15

are the eastern-most drill holes completed to date at La Romana. The

massive chalcopyrite intersected in both holes is coincident with a large down-hole EM conductor. The

intersections are approximately 50m apart and show continuity at approximately 170 to 200m vertical

depth. The massive sulphide occurs near the top of a more than 60m thick pyrite, pyrite-chalcopyrite

stockwork zone with bands of semi-massive sulphides. The mineralization is open up and down dip, and

appears to be increasing in thickness towards the east.

Drill hole locations are shown on Figure 1 below. Hole LRD14 was drilled approximately 130m north-

east of hole LRD09 and inclined approximately -50

°

towards the south targeting the lower DHEM

conductor. Hole LRD15 was collared from the same platform as LRD14 and inclined approximately -61

°

south, designed to test the continuity of the massive chalcopyrite in LRD14.

The Phase 3 drilling shows copper mineralization continues from near surface in several directions and

confirms a strong coincidence with geophysics targets. Numerous geophysics targets at Escacena

remain to be tested. Additional down-hole EM and mise-a-la-masse surveys are planned at the recent

drill holes to identify extensions to the mineralization. Assay results are awaited.

Qualified Person

Robert Baxter (FAusIMM), a Director of Pan Global Resources and a qualified person as defined by

National Instrument 43-101, has reviewed the scientific and technical information that forms the basis for

this news release. Mr. Baxter is not independent of the Company.

Photo 1

- LRD14 massive chalcopyrite

To view an enhanced version of Photo 1, please visit:

https://orders.newsfilecorp.com/files/5190/64742_24454312e4f3d87e_001full.jpg

Photo 2

- LRD15 massive chalcopyrite

To view an enhanced version of Photo 2, please visit:

https://orders.newsfilecorp.com/files/5190/64742_24454312e4f3d87e_002full.jpg

Figure 1

- Drill hole locations.

To view an enhanced version of Figure 1 please visit:

https://orders.newsfilecorp.com/files/5190/64742_24454312e4f3d87e_003full.jpg

About Pan Global Resources

Pan Global Resources is actively engaged in base and precious metal exploration in Spain, and is

pursuing opportunities from exploration through to mine development.

The Company has committed to

operating safely and with respect to the communities and environment where we operate.

On behalf of the Board of Directors

www.panglobalresources.com

.

FOR FURTHER INFORMATION PLEASE CONTACT:

[email protected]

Statements which are not purely historical are forward-looking statements, including any statements

regarding beliefs, plans, expectations or intentions regarding the future. It is important to note that actual

outcomes and the Company's actual results could differ materially from those in such forward-looking

statements. Risks and uncertainties include, but are not limited to, economic, competitive, governmental,

environmental and technological factors that may affect the Company's operations, markets, products

and prices. Readers should refer to the risk disclosures outlined in the Company's Management

Discussion and Analysis of its audited financial statements filed with the British Columbia Securities

Commission.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT

TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS

RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/64742