Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PGZ.V ·

Pan Global Reports New Drill Results and Extends High Grade Copper at La Romana, Southern Spain Continued high-grade intercepts including 18m at 1.0% Cu eq, 6m at 2.44% Cu eq, 10.6m at 1.55% Cu eq and 10.35m at 1.23% Cu eq

Drill Results

Pan Global Reports New Drill Results and

Extends High Grade Copper at La Romana,

Southern Spain

Continued high-grade intercepts including 18m at 1.0% Cu eq, 6m at 2.44% Cu eq, 10.6m at

1.55% Cu eq and 10.35m at 1.23% Cu eq

Exceptionally high-grade massive sulfide with up to 17.05% Cu, 0.16% Co, 42.7g/t Ag,

0.22g/t Au (18.7% Cu eq) over 0.43m

Thick copper, tin, silver intervals to within 0.5m from surface, including 67.5m at 0.54% Cu

eq and 50.1m at 0.50% Cu eq extending the open pit target which remains open in several

directions

Vancouver, British Columbia--(Newsfile Corp. - February 23, 2021) - Pan Global Resources Inc. (TSXV:

PGZ) (OTC: PGNRF) (the "Company") is pleased to report results for an additional five drill holes

(LRD21, LRD22, LRD24, LRD25 and LRD27) from the Phase 3 drill program completed in 2020 at the

La Romana target, in the Escacena Project. The Phase 4 drill program is also underway, with six

additional holes completed and results pending. La Romana is located approximately 6km southwest of

the former Aznalcollar open pit mine and approximately 15km west of the Las Cruces copper mine, in

the Iberian Pyrite Belt, southern Spain.

Tim Moody, Pan Global President and CEO states: "The new results confirm continuity of the near

surface copper mineralization to within 0.5m depth from surface and increasing in thickness to the east.

This near surface thick mineralization has now been intercepted over a strike extent of over

approximately 500m and is still wide open.

"The results also provide continued confirmation of extensions of the deeper high-grade massive

chalcopyrite mineralization in the northeast, including the highest copper assays reported to-date at La

Romana with assay values up to 17.05% Cu, 0.16% Co, 42.7g/t Ag, 0.22g/t Au. The copper

mineralization corresponds strongly with the IP and down-hole EM geophysics and indicates excellent

potential to significantly extend the mineralization in all directions."

Mr. Moody added: "Assay results are pending for drill holes LRD26 and LRD28 from Phase 3 and the

Phase 4 drill program is advancing quickly with an additional six drill holes already completed (LRD29 to

LRD34) and showing visible copper mineralization."

Drill highlights

:

LRD22

intersected

18.0m at 1.0% Cu eq

(0.87% Cu, 2.6 g/t Ag, 0.02g/t Au) from 259m,

including;

6m at 2.44% Cu eq

(2.19% Cu, 0.02% Co, 5.7 g/t Ag, 0.03g/t Au) from 259m including;

0.43m at 18.7% Cu eq

(17.05% Cu, 0.16% Co, 42.7g/t Ag, 0.22g/t Au) from 260.8m

(

massive chalcopyrite

)

LRD24

intersected

50.1m at

0.50% Cu eq

(0.35% Cu, 2.1g/t Ag, 0.03% Sn) from 15.5m

and

an

additional

25.9m at 0.41% Cu eq

(0.25% Cu, 1.5g/t Ag, 0.03% Sn) from 77.5m, including;

30.0m at 0.64% Cu eq

(0.45% Cu, 2.6g/t Ag, 0.04% Sn) from 26m;

7m at 1.18% Cu eq

(0.83% Cu, 4.4g/t Ag, 0.08% Sn)

from 26m

1.5m at 1.12% Cu eq

(0.82% Cu, 3.4g/t Ag, 0.07% Sn)

from 54.5m

LRD25

intersected

67.5m at 0.54% Cu eq

(0.34% Cu, 3.0 g/t Ag, 0.04% Sn) from 0.5m,

including;

37.25m at 0.73% Cu eq

(0.46% Cu, 3.2g/t Ag, 0.06% Sn) from 26.7m

1.1m at 1.42% Cu eq

(1.14% Cu, 13.8g/t Ag, 0.02% Sn) from 48.2m

10.35m at 1.23% Cu eq

(0.67% Cu, 4.1g/t Ag, 0.16% Sn) from 53.6m

2m at 3.05% Cu eq

(1.46% Cu, 7.9g/t Ag, 0.49% Sn) from 53.6m

0.2m at 4.77% Cu eq

(3.45% Cu, 15g/t Ag, 0.35% Sn) from 84.3m

LRD27

intersected

23.5m at 0.32% Cu eq

(0.21% Cu, 2.6g/t Ag) from 5.5m followed by

30.2m at

0.85% Cu eq

(0.62% Cu, 3.7g/t Ag, 0.05% Sn) from 65.8m, including;

10.6m at 1.55% Cu eq

(1.19% Cu, 6.5g/t Ag, 0.08% Sn) from 65.8m

7m at 2.03% Cu eq

(1.59% Cu, 8.7g/t Ag, 0.09% Sn) from 65.8m

Drill results

The new drill results are from holes completed in late 2020 as part of Pan Global's Phase 3 drill program

targeting extensions of the volcanic hosted massive sulphide associated mineralization at the La

Romana discovery. The program included a mix of 50 x 50m pattern drilling for dimension and grade

continuity in the west and larger step-out holes in the east testing large downhole electromagnetic

(DHEM) conductor and IP chargeability anomalies.

Drill hole collar information for holes LRD21, LRD22, LRD24, LRD25 and LRD27 is provided in Table 1

below. Assay results are summarized in Table 2. Drill hole locations are shown in Figure 1. Summary

cross sections with holes LRD24, 25 and 27 are provided in Figure 2. The drill holes were all inclined

towards the south and all reported drill intervals are approximately true width.

Table 1

Escacena Project, La Romana drill hole collar information (Total 1109.35m)

Hole ID

Easting

1

Northing

1

Azimuth (º)

Dip (º)

Depth (m)

LRD21

736837

4152836

180

-45

301.8

LRD22

736934

4152905

180

-50

314.1

LRD24

736535

4152651

180

-55

132.2

LRD25

736588

4152655

180

-55

161.1

LRD27

736582

4152697

180

-55

200.15

1

Coordinates are in ERTS89 datum UTM29N

Table 2

- Escacena Project, La Romana drill results summary

Hole

Fr

To

Int

Cu eq

1

Cu%

Sn

Ag

Co

Au

Pb

Zn

m

%

%

ppm

g/t

ppm

g/t

ppm

ppm

LRD21

167.3

167.7

0.4

5.03

4.44

287

14.0

449

0.11

143

513

194.6

222.0

27.4

0.27

0.20

58

1.2

49

0.01

101

362

194.6

195.6

1.0

1.53

1.33

80

5.3

151

0.05

109

2130

226.2

235.0

8.8

0.38

0.25

81

2.1

99

0.02

200

607

226.2

226.8

0.6

2.09

1.72

130

7.3

348

0.06

118

767

LRD22

238.5

239.0

0.5

2.86

2.57

75

12.0

153

0.04

54

205

253.3

253.7

0.4

1.76

1.59

48

4.7

154

0.02

20

91

259.0

277.0

18.0

1.00

0.87

70

2.6

111

0.02

84

194

259.0

265.0

6.0

2.44

2.20

74

5.7

233

0.03

27

151

260.8

261.23

0.43

18.68

17.05

267

42.7

1550

0.22

107

656

312.1

313.1

1.0

1.04

0.66

59

19.6

127

0.04

224

175

LRD24

15.5

103.4

87.9

0.42

0.28

281

1.7

64

0.00

134

303

15.5

65.6

50.1

0.50

0.35

317

2.1

62

0.00

92

309

26.0

56.0

30.0

0.64

0.45

416

2.6

70

0.00

93

295

26.0

33.0

7.0

1.18

0.83

783

4.4

122

0.01

124

413

77.5

103.4

25.9

0.41

0.25

325

1.5

76

0.01

272

284

94.0

95.1

1.1

1.14

0.77

745

2.7

219

0.01

360

313

LRD25

0.5

68.0

67.5

0.54

0.34

385

3.0

64

0.01

180

373

0.5

8.5

8.0

0.47

0.31

76

6.8

47

0.03

784

406

26.7

63.95

37.25

0.73

0.46

620

3.2

75

0.01

118

369

48.2

63.95

15.75

0.98

0.56

1098

4.1

68

0.01

137

461

48.2

49.3

1.1

1.42

1.14

154

13.8

84

0.02

517

597

53.6

63.95

10.35

1.23

0.67

1574

4.1

76

0.01

111

460

53.6

55.6

2.0

3.05

1.46

4932

7.9

99

0.01

159

361

84.3

84.5

0.2

4.77

3.45

3460

15.0

187

0.03

97

437

141.9

142.1

0.2

1.69

0.54

3090

3.1

149

0.15

88

77

LRD27

5.5

29.0

23.5

0.32

0.21

78

2.6

62

0.02

199

436

19.0

29.0

10.0

0.47

0.33

76

3.3

86

0.04

121

426

65.8

96.0

30.2

0.85

0.62

460

3.7

74

0.00

72

560

65.8

83.0

17.2

1.06

0.81

491

4.7

79

0.01

81

742

65.8

76.4

10.6

1.55

1.19

758

6.5

95

0.01

76

863

65.8

72.8

7.0

2.04

1.59

943

8.7

108

0.01

95

1152

68.9

70.3

1.4

4.18

3.23

2120

18.1

167

0.01

232

1880

92.0

94.0

2.0

1.12

0.70

1135

3.7

78

0.01

24

333

1

Metal prices used: Copper US$6,200 per tonne, Silver USD22.50 per ounce, Gold US$1,500 per

ounce, Cobalt US$32,800 per tonne and Tin US$18,000 per tonne. The copper equivalent (Cu eq)

values are for exploration purposes only and include no assumptions for metal recovery.

The new results show the high-grade massive chalcopyrite associated copper mineralization continues

to the east and remains wide open in most directions coincident with a large down-hole EM conductor

plate. The near surface copper mineralization has also been extended on consecutive 50m-spaced

sections to the east, including the widest copper intervals reported to date and remains open down-dip

and along strike. The mineralization includes mainly stockwork, semi-massive and bands of massive

sulphides, including chalcopyrite and pyrite associated with chlorite alteration. The mineralization also

includes elevated levels of tin, silver, cobalt and locally anomalous gold. The tin occurs as cassiterite and

mainly in the west and center of the area drilled to date.

Drill hole

LRD21

tested a downhole EM conductor approximately 50m west and 30m up-dip from hole

LRD14. The hole intersected 27.4m at 0.27% Cu eq from 194.6m downhole and several narrow copper

intervals, including 1m at 1.33% Cu eq approximately coincident with the conductor target, 5.03% Cu eq

over 0.4m from 167.3m and 2.09% Cu equivalent over 0.6m from 226.2m.

Drill hole

LRD22

was designed to extend the high-grade copper mineralization associated with a large

downhole EM conductor anomaly. The hole intersected 18m at 1.0% Cu eq from 259m downhole,

including 6m at 2.44% Cu eq and assays up to 17.05% Cu, 0.16% Co, 18.7g/t Ag and 0.22g/t Ag

associated with a 0.43m thick massive chalcopyrite interval. The results confirm the continuation and

increasing thickness of the high-grade mineralization to the east and down-dip from previous drill holes

LRD14, 15 and 19 at approx. 200m vertical depth. The massive chalcopyrite associated mineralization

remains open down-dip, up-dip and laterally coincident with the downhole EM conductor anomaly. The

hole also intersected additional narrow high-grade intervals, including 2.86% Cu eq over 0.5m from

238.5m and 1.76% Cu eq over 0.4m from 253.3m downhole.

Drill hole

LRD24

tested 50m up-dip of previous hole LRD10 and 50m east of hole LRD11. The results

show a thick zone of copper mineralization almost from surface, including 50.1m at 0.5% Cu eq (0.35%

Cu, 2.1g/t Ag, 0.03% Sn) from 15.5m downhole, which includes 30m at 0.64% Cu eq from 26m and

higher-grade interval of 7m at 1.18% Cu eq from 26m downhole (approx. 20m vertical). A deeper low

grade copper zone includes 25.9m at 0.41% Cu eq from 77.9m downhole.

Drill hole

LRD25

tested 50m east of LRD24. The hole confirmed continuation of the near surface copper

mineralization and increasing thickness to the east. The results show a 67.5m interval averaging 0.54%

Cu eq (0.34% Cu, 3g/t Ag, 0.04% Sn) from 0.5m downhole. This includes 8m at 0.47% Cu eq from 0.5m

immediately beneath a thin soil cover, followed by 37.25m at 0.73% Cu eq from 26.7m downhole with

higher grade intervals of 1.1m at 1.42% Cu eq and 10.35m at 1.23% Cu eq and locally significant tin

grades (up to 0.89% Sn). Additional narrow high-grade intersections include 4.77% Cu eq over 0.2m

from 84.3m and 1.69% Cu eq over 2m from 141.9m.

Drill hole

LRD27

tested approximately 50m down-dip from LRD25. The hole shows a low-grade copper

interval commencing immediately beneath the cover sediments, including 23.5m at 0.32% Cu eq,

including 10m at 0.47% Cu eq, followed by 30.2m of higher grade at 0.85% Cu eq from 65.8m,

including10.6m at 1.55% Cu eq from 65.8m downhole. Copper grade is increasing down-dip on this

section.

Assay results for drill holes LRD26 and LRD28, completed in late 2020, are expected within the next two

weeks. The 2021 Phase 4 drill program is advancing quickly with an additional six drill holes completed

(LRD29 to LRD34) and results awaited. The drill holes continue to show intervals with visible copper

mineralization from near surface.

Figure 1

- La Romana drill hole locations and geophysics targets

To view an enhanced version of Figure 1, please visit:

https://orders.newsfilecorp.com/files/5190/75140_b525439fc4a1488b_001full.jpg

Figure 2

- Summary drill sections (736535 E and 736585 E)

To view an enhanced version of Figure 2, please visit:

https://orders.newsfilecorp.com/files/5190/75140_b525439fc4a1488b_002full.jpg

QA/QC

Core size was HQ (63mm) and all samples were ½ core. Nominal sample size was 1m core length and

ranged from 0.4 to 2m. Sample intervals were defined using geological contacts with the start and end of

each sample physically marked on the core. Diamond blade core cutting and sampling was supervised

at all times by Company staff. Duplicate samples of ¼ core were taken approximately every 30 samples

and Certified Reference materials inserted every 25 samples in each batch.

All samples were crushed and split (method CRU-31, SPL22Y), and pulverized using (method PUL-31).

Gold analysis was by 50gm Fire assay with ICP finish (method Au-ICP22) and multi element analysis

was undertaken using a 4-acid digest with ICP AES finish (method ME-ICP61). Tin was analyzed in

selected intervals using Lithium borate fusion and ICP MS finish (method ME-MS81). Over grade base

metal results were assayed using a 4-acid digest ICP AES (method OG-62).

Over grade tin was

determined using peroxide fusion with ICP finish (method Sn-ICP81x).

Qualified Person

Patrick Downey, a Director of Pan Global Resources and a qualified person as defined by National

Instrument 43-101, has reviewed the scientific and technical information that forms the basis for this

news release. Mr. Downey is not independent of the Company.

About Pan Global Resources

Pan Global Resources Inc. is actively engaged in base and precious metal exploration in southern Spain

and is pursuing opportunities from exploration through to mine development.

The Company is committed

to operating safely and with respect to the communities and environment where we operate.

On behalf of the Board of Directors

www.panglobalresources.com

.

FOR FURTHER INFORMATION PLEASE CONTACT:

[email protected]

Statements which are not purely historical are forward-looking statements, including any statements

regarding beliefs, plans, expectations or intentions regarding the future. It is important to note that actual

outcomes and the Company's actual results could differ materially from those in such forward-looking

statements. Risks and uncertainties include, but are not limited to, economic, competitive, governmental,

environmental and technological factors that may affect the Company's operations, markets, products

and prices. Readers should refer to the risk disclosures outlined in the Company's Management

Discussion and Analysis of its audited financial statements filed with the British Columbia Securities

Commission.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT

TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS

RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/75140