Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PGZ.V ·

Pan Global Reports Drill Results FOR Cañada Honda and Zarcita Targets at the Escacena Project, Spain

Drill Results

PAN GLOBAL REPORTS DRILL RESULTS FOR CAÑADA HONDA AND

ZARCITA TARGETS AT THE ESCACENA PROJECT, SPAIN

TSXV: PGZ | OTCQX: PGZFF

Cañada Honda copper-gold mineralization extended to

600m

down-dip at east end of a 2km long east-west gravity anomaly

Zarcita drilling intersects narrow intervals of higher-grade copper within a wider zone of stockwork and alteration

Drilling at Escacena now focused on highly prospective western extension of the La Romana copper-tin-silver mineralization at Romana West

VANCOUVER, BC

,

Sept. 8, 2023

/CNW/ - Pan Global Resources Inc. ("Pan Global" or the "Company") (TSXV: PGZ) (OTCQX: PGZFF) is pleased to announce

positive results for its follow-up drilling at the Cañada Honda and Zarcita targets at the 100%-owned Escacena Project in the Iberian Pyrite Belt, southern

Spain

.

Both targets are located 4km north of the La Romana copper-tin-silver discovery where ongoing drilling is extending mineralization at Romana West. Three

follow-up drill holes have been completed at the Cañada Honda copper-gold target and an additional 13 drill holes have been completed at the Zarcita copper

target.

The Company will host a conference call and webcast on

Monday, September 11, 2023

, at

10:00 a.m. Eastern Time

/

7:00 a.m. Pacific Time

to discuss the

Cañada Honda and Zarcita drill results and also provide an overview of current exploration and drilling at Romana West. An open Q&A session will follow a short

presentation. For webcast details please see information at the conclusion of this release.

"The follow-up drilling at Cañada Honda confirms copper-gold mineralization coincident with a gravity anomaly, and extends the copper-gold mineralization from

surface to

600m

down-dip where it remains wide open. The new results highlight additional gold potential in the hanging wall. The drilling is at the eastern end of

a 2km long east-west gravity target, indicating potential for the mineralization to significantly expand, making this a compelling, high priority target for additional

drilling," said

Tim Moody

, Pan Global's President & CEO.

Currently, drilling at Escacena is focused along the highly prospective western extension (Romana West) of the La Romana copper-tin-silver discovery. In

addition to the 12 geophysical targets that are being sequentially prioritized for drill testing, exploration on the 5,760-hectare Escacena Project continues to

identify new drill targets. Initial assay results from the first set of drill holes at Romana West are expected soon.

Cañada Honda and Zarcita drill hole locations are shown in Figure 1 below. Drill hole assay results for Cañada Honda are summarized in Table 1 and collar

details are presented in Table 2 below. Drill assay results for Zarcita are summarized in Table 3 and collar details provided in Table 4.

Figure 1 – Simplified geology map with Cañada Honda and Zarcita drill hole locations. Cross section location (A-A’) shown in Figure 2. (CNW Group/Pan Global

Resources Inc.)

Cañada Honda Highlights

New drill hole results include:

CHD05 –

20m

at 0.5% Cu, 0.8g/t Au, 1.9g/t Ag

, including

5.1m

at 1.3% Cu, 0.5g/t Au, 3.9g/t Ag

(reported

July 4, 2023

); and new results including

2m

at 1.6g/t Au

CHD06 –

7m

at 0.6% Cu, 0.8g/t Au, 6.5g/t Ag

, including

3m

at 1.1g/t Au, 5.5g/t Ag

CHD07 –

5m

at 1.1g/t Au, 0.2% Cu, 2.3g/t Ag

Surface rock samples up to 9g/t Au

New untested DHEM conductor anomalies

The follow-up drill program included holes CHD05, CHD06 and CHD07. Drill hole CHD05, testing

150m

down-dip from previous drill hole CHD04 and

approximately

330m

down-dip from a historical mine tunnel, confirmed copper-gold mineralization coincident with the targeted gravity anomaly. CHD06, located

100m

east of CHD05, intersected copper-gold mineralization coincident with a DHEM target. Hole CHD07 tested a resistivity low anomaly

190m

down-dip from

CHD05. Each of the drill holes also intersected additional gold mineralization in the hanging wall.

DHEM in holes CHD06 and CHD07 confirmed new off-hole conductor anomalies for future drilling to test the potential for stronger sulphide mineralization. See

Figure 3 below.

Anomalous gold assays from 28 rock grab samples at Cañada Honda indicate a gold anomaly extending

200m

west of the historical mine tunnel and up-dip from

the recent drilling, with several samples reporting >0.1g/t Au up to 9.0g/t Au.

Figure 2 – Geology cross section 737250mE, A-A’, showing new results for follow-up drill holes CHD05 and CHD-7, and previous holes CHD03 and CHD04. The

results show the main Cu-Au zone extending 600m down-dip from a historical mine tunnel, and multiple Au veins in the hanging wall. Approximately 150m

separates CHD04 and CHD05, and 190m separates CHD05 and CHD07. (CNW Group/Pan Global Resources Inc.)

Figure 3 – Cañada Honda target map showing a large gravity anomaly extending west of the drill holes, DHEM conductors, soil and rock sample copper-gold

anomalies. (CNW Group/Pan Global Resources Inc.)

Table 1

– Cañada Honda drill results summary (all intervals close to true thickness); Results in italics for CHD05 were first reported on

July 4, 2023

.

Hole ID

From

To

Interval

Cu

Au

Ag

Co

Pb

Zn

m

m

m

%

g/t

g/t

ppm

ppm

ppm

CHD05

65.00

66.00

1.00

0.28

1.41

14.8

367

3430

4100

100.00

102.00

2.00

<0.01

1.61

0.5

414

37

39

203.00

204.00

1.00

0.06

0.41

9.3

603

3900

1.32 %

287.00

307.00

20.00

0.50

0.28

1.9

102

38

124

inc.

296.00

307.00

11.00

0.76

0.44

2.4

117

36

147

inc.

296.00

301.10

5.10

1.31

0.47

3.9

182

39

154

inc.

296.00

296.50

0.50

10.3

1.42

29.2

592

114

371

CHD06

57.00

58.00

1.00

<0.01

1.23

<0.5

155

8

45

73.00

76.00

3.00

0.47

0.05

1.1

109

7

82

101.00

102.00

1.00

0.06

1.13

17.8

41

6180

9380

120.00

122.00

2.00

0.11

1.36

0.5

54

6

35

188.00

195.00

7.00

0.64

0.80

6.5

240

390

412

inc.

188.00

189.00

1.00

0.80

1.32

20.3

117

2140

2280

inc.

191.00

194.00

3.00

0.91

1.10

5.5

413

91

96

CHD07

75.00

76.00

1.00

<0.01

1.13

3.6

266

261

299

241.00

246.00

5.00

0.19

1.09

2.3

219

525

1151

inc.

244.00

245.00

1.00

0.94

4.39

9.0

741

1760

3860

258.00

259.00

1.00

0.02

1.17

1.2

115

129

94

428.00

433.00

5.00

0.34

0.30

0.9

125

9

53

inc.

430.00

431.00

1.00

1.33

0.69

2.7

145

23

92

Table 2

– Cañada Honda drill hole collar information (3 holes

1,238.95m

)

Hole ID

Easting

1

Northing

1

Azimuth (

o

)

Dip (

o

)

Depth (m)

CHD05

737208

4156446

180

-70

443.40

CHD06

737336

4156389

180

-75

320.40

CHD07

737286

4156582

180

-75

475.15

1

Coordinates are in ERTS89 datum UTM29N

Zarcita results commentary

"The recent exploration drilling and mapping at Zarcita has highlighted a 2.1km long trend with anomalous copper, lead, zinc, gold and silver. The highest

potential remains centered on the historical Zarcita mine workings where drilling has intersected narrow intervals of higher-grade copper within a wider zone of

stockwork and alteration. While untested down-hole electromagnetic (DHEM) conductors, gravity and IP anomalies define prospective targets for future

campaigns at Zarcita, the Romana West and Cañada Honda targets are key near-term priorities," said

Tim Moody

, Pan Global's President & CEO.

Zarcita highlights

New drill hole results include:

ZAD05: intersected copper mineralization from surface, including

14.45m

at 0.2% Cu before entering a

10.5m

assumed historical mine cavity

ZAD06:

5.5m

at 0.7% Cu from

106.2m

, including

1.85m

at 1.6% Cu, 0.15g/t Au, 2.4g/t Ag

The completed drill program at Zarcita includes 17 holes for a total of

4,363m

, along a 2.1km east-west trend. The holes were designed to test a combination of

geophysical, geological and geochemical targets, and to acquire mineral alteration information to assist in identifying vectors to potential higher-grade

mineralization. Results from the first four holes, ZAD01 to ZAD04, drilled on a single north-south section, were reported on

January 17, 2023

showing copper

grades increasing to

400m

down-dip and narrow intervals of higher grade (e.g., drill hole ZAD04:

17m

at 0.3% Cu, including 1.9% Cu over

1.1m

). The new drill-

holes, ZAD05 to ZAD17, were drilled on a

100m

to

600m

spacing along the trend. Much of the strike potential to-date has only been tested by single wide-

spaced drill holes.

The most promising results are from a

600m

section of the 2.1km trend, coincident with the Zarcita mine workings. This includes thin bands of semi-massive and

massive sulphide intervals within a wider zone of stockwork veining and chlorite-sericite alteration. DHEM in holes ZAD01 and ZAD05 identified untested off-hole

and below-hole anomalies, representing potential nearby stronger sulphide mineralization.

Drill hole ZAD05, intersected 0.2% Cu (oxide zone) over

14.85m

from surface followed by

10.5m

with no core recovery in an assumed historical mine cavity, and

trace chalcopyrite continuing in the drill core below the cavity. Drill holes ZAD06 and ZAD15, intersected narrow intervals of high-grade copper. The

mineralization remains open down-dip and along-strike within the historical mining area.

Table 3

– Zarcita drill results summary (all intervals close to true thickness to >90%)

Hole ID

From

To

Interval

Cu

Au

Ag

Co

Pb

Zn

m

m

m

%

g/t

g/t

ppm

ppm

ppm

ZAD05

0.00

14.45

14.45

0.19

0.02

0.3

33

60

281

14.45

24.95

10.50

No drill core - assumed historical mine cavity

ZAD06

106.20

111.70

5.50

0.67

0.06

1.0

173

30

487

inc.

106.20

108.05

1.85

1.61

0.15

2.4

392

73

737

inc.

146.10

146.35

0.25

1.40

0.13

5.9

197

869

3680

ZAD07

No significant results

ZAD08

130.00

132.00

2.00

0.10

0.06

1.2

12

245

2.09 %

ZAD09

185.00

186.00

1.00

0.03

0.07

1.6

9

566

1.07 %

ZAD10

No significant results

ZAD11

158.00

159.00

1.00

1.04

1.44

4.4

146

77

314

ZAD12

51.00

54.00

3.00

0.08

0.01

5.3

24

6513

1.04 %

ZAD13

No significant results

ZAD14

No significant results

ZAD15

41.50

42.00

0.50

1.93

0.41

6.5

362

186

1105

ZAD16

No Significant results

ZAD17

No Significant results

Table 4

– Zarcita drill hole collar information (13 holes

3221.15m

)

Hole ID

Easting

1

Northing

1

Azimuth (

o

)

Dip (

o

)

Depth (m)

ZAD05

738291

4156973

180

-70

179.40

ZAD06

738351

4157082

130

-55

305.00

ZAD07

738180

4157081

180

-50

241.10

ZAD08

737986

4156899

180

-55

201.85

ZAD09

737985

4156900

0

-90

203.50

ZAD10

737984

4157098

180

-70

356.25

ZAD11

737439

4156993

180

-55

275.35

ZAD12

738984

4157026

180

-60

230.20

ZAD13

738984

4157027

0

-90

179.50

ZAD14

738987

4157027

140

-55

124.40

ZAD15

738984

4157027

220

-55

117.70

ZAD16

737095

4157069

180

-60

360.90

ZAD17

739264

4157060

215

-55

446.00

1

Coordinates are in ERTS89 datum UTM29N

Investor Call to Discuss Drill Results and Escacena Exploration Update

The Company will host a conference call and webcast on

Monday, September 11, 2023

, at

10:00 a.m. Eastern Time

to discuss the Cañada Honda and Zarcita

drill results and provide an overview of current exploration and drill testing at Romana West. An open Q&A session will follow a short presentation.

Date:

Monday, September 11, 2023

Time:

10:00 a.m. Eastern Time

|

7:00 a.m. Pacific Time

Please register in advance:

https://us06web.zoom.us/meeting/register/tZ0pcumgqTksH9Qjcmz0fzUGukwCwrpLAVng

After registering, you will receive a confirmation email containing information about joining the meeting. Investors are encouraged to send questions or topics of

interest in advance to

[email protected]

to be addressed following the presentation. A link to the webcast will be available on the Company's

website at:

https://panglobalresources.com

following the live broadcast.

About the Escacena Project

The Escacena Project comprises a large, contiguous, 5,760-hectare land package controlled 100% by Pan Global in the east of the Iberian Pyrite Belt.

Escacena is located near operating mines at Las Cruces and Riotinto and is immediately adjacent to the former Aznalcóllar and Los Frailes mines where Minera

Los Frailes/Grupo Mexico is in the final permitting stage with construction anticipated to start in 2023. The Escacena Project hosts the La Romana copper-tin-

silver discovery and a number of other prospective targets, including, Romana West, Cañada Honda, Bravo, Barbacena, El Pozo, Zarcita, Hornitos, La Jarosa,

Romana Deep

,

Romana North

, and San Pablo.

About Pan Global Resources

Pan Global Resources Inc. is actively targeting copper-rich mineral deposits, given copper's compelling supply-demand fundamentals and outlook for strong

long-term prices as a critical metal for global electrification and energy transition. The Company's flagship Escacena Project is located in the prolific Iberian

Pyrite Belt in southern

Spain

, where infrastructure, mining and professional expertise, and support for copper as a Strategic Raw Material by the European

Commission collectively define a tier-one jurisdiction for mining investment. The Pan Global team comprises proven talent in exploration, development, and mine

operations - all of which are committed to operating safely and with utmost respect for the environment and our partnered communities.

QA/QC Procedures

Core size was HQ (63mm) and all samples were ½ core. Nominal sample size was

1m

core length and ranged from 0.5 to

2m

. Sample intervals were defined

using geological contacts with the start and end of each sample physically marked on the core. Diamond blade core cutting and sampling was supervised at all

times by Company staff. Duplicate samples of ¼ core were taken approximately every 30 samples and Certified Reference materials inserted every 25 samples

in each batch.

Drill core and rock samples were delivered to ALS laboratory in

Seville, Spain

and assayed at the ALS laboratory in

Ireland

. All samples were crushed and split

(method CRU-31, SPL22Y), and pulverized using (method PUL-31). Gold analysis was by 50gm Fire assay with ICP finish (method Au-ICP22) and multi element

analysis was undertaken using a 4-acid digest with ICP AES finish (method ME-ICP61). Over grade base metal results were assayed using a 4-acid digest ICP

AES (method OG-62). Over grade tin was determined using peroxide fusion with ICP finish (method Sn-ICP81x).

Qualified Persons

James Royall

, Vice President Exploration for Pan Global Resources and a qualified person as defined by National Instrument 43-101, has reviewed the scientific

and technical information for this news release. Mr. Royall is not independent of the Company.

On behalf of the Board of Directors

www.panglobalresources.com

Forward-looking statements

Statements which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations or intentions

regarding the future. It is important to note that actual outcomes and the Company's actual results could differ materially from those in such forward-looking

statements. The Company believes that the expectations reflected in the forward-looking information included in this news release are reasonable but no

assurance can be given that these expectations will prove to be correct and such forward-looking information should not be unduly relied upon. Risks and

uncertainties include, but are not limited to, economic, competitive, governmental, environmental and technological factors that may affect the Company's

operations, markets, products and prices. Readers should refer to the risk disclosures outlined in the Company's Management Discussion and Analysis of its

audited financial statements filed with the British Columbia Securities Commission.

The forward-looking information contained in this news release is based on information available to the Company as of the date of this news release. Except as

required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX

VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/pan-global-reports-drill-results-for-canada-honda-and-zarcita-targets-at-the-escacena-project-spain-301921688.html

SOURCE

Pan Global Resources Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/September2023/08/c9664.html

%SEDAR: 00024063E

For further information:

Jason Mercier, VP Investor Relations and Communications, [email protected], +1 778 372-7101

CO: Pan Global Resources Inc.

CNW 07:30e 08-SEP-23