Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PGZ.V ·

Pan Global Intersects 1.08 G/T GOLD over 46 Meters from Near Surface IN First Drillhole at Cármenes Project, Spain

Drill Results

PAN GLOBAL INTERSECTS 1.08 G/T GOLD OVER 46 METERS FROM

NEAR SURFACE IN FIRST DRILLHOLE AT CÁRMENES PROJECT, SPAIN

TSXV: PGZ | OTCQB: PGZFF | FRA: 2EU

Confirms potential for significant new gold discovery at 100%-owned Cármenes Project, northern

Spain

Potential for additional discoveries in the large Cármenes Project area

VANCOUVER, BC

,

May 19, 2025

/CNW/ - Pan Global Resources Inc. ("Pan Global" or the "Company") (TSXV: PGZ) (OTCQB: PGZFF) (FRA: 2EU) is pleased

to announce significant near surface gold assay results in the first drillhole completed in the maiden drill campaign at the Company's 100%-owned Cármenes

Project ("Cármenes"), northern

Spain

.

The current six-hole drill program is targeting expansion of the breccia-hosted mineralization associated with the historical Providencia copper-cobalt-nickel

underground mine workings. The potential for significant gold was highlighted in recent soil, trench and channel sampling results. The Providencia target area had

no previous drilling and no past reports of gold mineralization.

Drill Highlights:

Drillhole

PVD02

46.0m

at 1.08 g/t Au

from 24.0m down-hole, including

4.0m

at 6.27 g/t Au, 0.25 g/t Pt+Pd

from

66.0m

"The first drill results at the Providencia target represent an exceptional start to Pan Global's maiden drill program at Cármenes, confirming discovery of previously

unknown near-surface gold mineralization over a wide interval. The results expand the breccia-hosted mineralization south of the historical high-grade copper,

cobalt and nickel mine workings at Providencia and is wide open. The new gold zone occurs as a potential halo to the copper-rich mineralization found in the mine

workings," said

Tim Moody

, Pan Global President and CEO.

"Multiple targets have been identified from soil geochemistry and mapping in the immediate area around Providencia, including the large untested Profunda target

located 1km to the south. This further highlights the potential for additional discoveries in the Cármenes Project."

Key points:

Current six-hole dill program is Pan Global's maiden drill campaign at the Cármenes Project, and the first-ever drillholes at the Providencia target.

First completed drillhole (PVD02) intersected a high-grade interval of 6.27 g/t gold over

4m

within a broader interval averaging 1.08 g/t gold over

46m

from

24m

down-hole.

The gold intersection in PVD02 is associated with strong multi-stage hydrothermal breccia within strongly dolomitized/altered limestones, with local trace

quantities of sulphides, and favourable very low contents of metals such as arsenic or antimony.

Assay results are anticipated within three weeks for completed drillholes (PVD03 and PVD04), with breccia intersected over more than

120m

from near-

surface in PVD04. Drillhole PVD01 was abandoned before reaching the target after the hole collapsed.

Historical underground mine workings at Providencia extracted copper, cobalt and nickel ore from within a "pipe-like" hydrothermal breccia to a depth of 110

meters. The mineralization remained open when mining ceased in the early-1930s.

There is no record of gold extraction at Providencia and the new gold zone appears to have been previously unrecognized.

The on-going drilling includes three step-out holes up to

120m

east of the Providencia mine workings, testing beneath recently reported highly anomalous

trench and channel sample results (

3.11 g/t Au over

37m

, and

1.74 g/t Au over

20m

). [See media release from

February 11, 2025

]

Large surface target area extending more than

250m

x

150m

, characterized by coincident strong dolomite-alteration, breccia and strongly anomalous Cu, Au,

Ni, Co and Pb geochemistry in soils, trench and channel sample assays.

Channel sampling inside the historical mine workings at Providencia is underway to better understand the continuity of the mineralization.

Multiple targets identified in the Cármenes Project area highlight the potential for additional discoveries from the ongoing exploration program.

Interpretation of a recently completed helicopter electromagnetic, magnetic and radiometric survey over the Cármenes Project is in progress to fast-track

identification and prioritization of additional potential drill targets.

Pan Global is also pleased to report that drilling has resumed at the Company's flagship Escacena Project in southern

Spain

following record rainfall in March and

April, with the focus on the high-priority Bravo target, expansion of the La Romana copper-tin discovery, and testing of new targets.

Figure 1 – Providencia Target - geology map showing the historical mine workings, drillholes and cross-section location (A-A’ - Figure 2). (CNW Group/Pan Global

Resources Inc.)

Figure 2 – North-south cross section for drillholes PVD02 and PVD04 (CNW Group/Pan Global Resources Inc.)

Table 1

– Providencia Drill Results Summary

Drillhole

From

To

Interval

1

Au

Cu

Co

Ni

Pt

Pd

m

m

m

g/t

ppm

ppm

ppm

ppm

ppm

PVD01

Hole abandoned

PVD02

0.0

2.0

2.00

0.07

2050

291

574

0.01

<0.01

15.0

24.0

9.0

0.17

9

15

2

0.01

0.01

24.0

70.0

46.0

1.08

44

21

37

0.03

0.02

including

24.0

48.0

24.0

1.01

25

10

29

0.04

0.03

Including

26.0

38.0

12.0

1.22

26

10

36

0.05

0.03

including

35.0

38.0

3.0

2.00

34

15

49

0.06

0.04

including

43.0

48.0

5.0

1.44

36

11

27

0.05

0.04

including

66.0

70.0

4.0

6.27

47

12.5

30

0.14

0.11

1

All intercepts are reported as downhole drill widths. There is insufficient drilling to constrain the geometry to determine true width.

Table 2

–Drillhole Collar Information

Hole ID

Easting

2

Northing

2

Azimuth (º)

Dip (º)

Length (m)

PVD01

287514

4761180

345

-65

44.8

PVD02

287514

4761181

345

-61

188.2

2

Coordinate system: UTM30N ERTS89

About the Cármenes Project

The Cármenes Project is located approx. 55km north of León in northern

Spain

and comprises five Investigation Permits over 5,653 hectares. The Project area is

highly prospective for multiple bodies or "clusters" of carbonate-hosted "pipe-like" breccia style copper, nickel, cobalt, and gold mineralization. The area includes

the former Profunda and Providencia mines that last operated in the 1930s, producing concentrates of copper and cobalt with nickel. Numerous other smaller

historical mine workings in the area highlight potential for additional breccia pipes. These types of ore deposits can have significant vertical dimensions exceeding

1km.

About Pan Global Resources

Pan Global Resources Inc. is actively exploring for copper-rich mineral deposits along with gold and other metals. Copper has compelling supply-demand

fundamentals and outlook for strong long-term prices as a critical metal for global electrification and energy transition. Gold is also attracting record prices.

The Company's flagship Escacena Project is located in the prolific Iberian Pyrite Belt in southern

Spain

, where a favourable permitting track record, excellent

infrastructure, mining and professional expertise, and support for copper as a Strategic Raw Material by the European Commission collectively define a tier-one

low-risk jurisdiction for mining investment. The Company's second project, at Cármenes, in northern

Spain

, is also an area with a long mining history and excellent

infrastructure. The Pan Global team comprises proven talent in exploration, discovery, development, and mine operations - all of which are committed to operating

safely and with utmost respect for the environment and our partnered communities. The Company is a member, and operates under the principles, of the United

Nations Global Compact.

Qualified Persons

Álvaro Merino, Vice President Exploration for Pan Global Resources and a qualified person as defined by National Instrument 43-101, has approved the scientific

and technical information for this media release. Mr. Merino is not independent of the Company.

QA/QC

Core size was HQ (63mm) and all samples were ½ core. Nominal sample size was

1m

core length and ranged from 0.5 to

2m

. Sample intervals were defined

using geological contacts with the start and end of each sample physically marked on the core. Diamond blade core cutting and sampling was supervised at all

times by Company staff. Duplicate samples of ¼ core were taken approximately every 30 samples and Certified Reference materials inserted every 25 samples

in each batch.

Samples were delivered to ALS laboratory in

Seville, Spain

and assayed at the ALS laboratory in

Ireland

. All samples were crushed and split (method CRU-31,

SPL22Y), and pulverized using (method PUL-31). Gold, platinum and palladium analysis was by 50gm fire assay with ICP finish (method Au-ICP-24) and multi

element analysis was undertaken using a 4-acid digest with ICP AES finish (method ME-ICP-61). Over grade base metal results were assayed using a 4-acid

digest ICP AES (method OG-62).

www.panglobalresources.com

Forward-looking statements

Statements which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations, or intentions regarding

the future. It is important to note that actual outcomes and the Company's actual results could differ materially from those in such forward-looking statements. The

Company believes that the expectations reflected in the forward-looking information included in this media release are reasonable, but no assurance can be given

that these expectations will prove to be correct and such forward-looking information should not be unduly relied upon. Risks and uncertainties include, but are not

limited to, economic, competitive, governmental, environmental, and technological factors that may affect the Company's operations, markets, products, and

prices. Readers should refer to the risk disclosures outlined in the Company's Management Discussion and Analysis of its audited financial statements filed with

the British Columbia Securities Commission.

The forward-looking information contained in this media release is based on information available to the Company as of the date of this media release. Except as

required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX

VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/pan-global-intersects-1-08-gt-gold-over-46-meters-from-near-surface-in-first-drillhole-at-carmenes-project-spain-302458396.html

SOURCE

Pan Global Resources Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/May2025/19/c1288.html

%SEDAR: 00024063E

For further information:

​FOR MORE INFORMATION PLEASE CONTACT: Jason Mercier, VP Investor Relations and Communications,

[email protected] / [email protected], Tel: +1-236-886-9518, www.panglobalresources.com

CO: Pan Global Resources Inc.

CNW 02:00e 19-MAY-25