Pan Global Adds Second Drill Rig at Escacena Project, Southern Spain DHEM Survey Significantly Extends Copper Target
Pan Global Adds Second Drill Rig at Escacena
Project, Southern Spain
DHEM Survey Significantly Extends Copper Target
Vancouver, British Columbia--(Newsfile Corp. - October 8, 2020) -
Pan Global Resources
Inc.
(TSXV:
PGZ
) (OTC:
PGNRF
) (the "Company") is pleased to report that new down hole
electromagnetic (DHEM) survey results have significantly expanded the lower conductor anomaly
associated with recently intersected massive chalcopyrite mineralization. Based on these results, Pan
Global is mobilizing a second drill rig to accelerate the ongoing Phase 3 drill program at the La Romana
copper discovery in the Escacena Project, Iberian Pyrite Belt, southern Spain.
Tim Moody, President and CEO of Pan Global commented:
"The new down hole electromagnetic
survey results are very positive and significantly extend the copper target east of recent drill holes
LRD14 and LRD15, which both intersected massive chalcopyrite mineralization. The copper
mineralization is wide open in this area."
Mr. Moody added: "
Whilst we are awaiting assay results, we're mobilizing a second drill rig to
accelerate the drilling. Additional drill holes have now been added to further test the lower conductor
along strike and down-dip from holes LRD 14 and 15."
As reported in the News Releases of September 8 and September 29, 2020, the first seven drill holes of
the current program all intersected visual copper mineralization. Of significance, drill holes LRD14 to
LRD15 intersected massive chalcopyrite mineralization at down-hole depths of approx. 225m within a
broad zone of stockwork pyrite-chalcopyrite mineralization. Assay results are awaited. The second drill
rig is expected to be on-site this week. Holes LRD16 and 17 (in-progress) are sited east and west of
hole LRD06.
New DHEM geophysics surveys have been completed in drill holes LRD09 and LRD14. Previous DHEM
survey results show two large north-dipping conductor anomalies coincident with copper mineralization
in drill holes (Figures 1 and 2). These DHEM results expand the lower conductor a further 240m east and
40m west.
The overall dimensions of the lower conductor are approximately 620 x 300m, and open to the east,
down-dip and potentially up-dip in the east. The combined DHEM results extend approximately 1 km
east-west, and dip of approximately 40° towards the north. The massive chalcopyrite in holes LRD14
and 15 coincides with the lower conductor. Additional drill holes are now planned to further test the lower
conductor for extensions to the copper mineralization whist continuing to test the upper conductor.
Qualified Person
Robert Baxter (FAusIMM), a Director of Pan Global Resources and a qualified person as defined by
National Instrument 43-101, has reviewed the scientific and technical information that forms the basis for
this news release. Mr. Baxter is not independent of the Company.
Figure 1
- Down hole electromagnetic conductor anomaly and drill hole locations.
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5190/65455_1ee1a533440099a6_001full.jpg
Figure 2
- Drill hole locations (holes 9 to 15) and geophysics. Lower conductor in yellow and upper
conductor in magenta. (Oblique view looking down towards the southwest)
To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/5190/65455_1ee1a533440099a6_002full.jpg
About Pan Global Resources
Pan Global Resources is actively engaged in base and precious metal exploration in Spain, and is
pursuing opportunities from exploration through to mine development.
The Company has committed to
operating safely and with respect to the communities and environment where we operate.
On behalf of the Board of Directors
www.panglobalresources.com
.
FOR FURTHER INFORMATION PLEASE CONTACT:
Statements which are not purely historical are forward-looking statements, including any statements
regarding beliefs, plans, expectations or intentions regarding the future. It is important to note that actual
outcomes and the Company's actual results could differ materially from those in such forward-looking
statements. Risks and uncertainties include, but are not limited to, economic, competitive, governmental,
environmental and technological factors that may affect the Company's operations, markets, products
and prices. Readers should refer to the risk disclosures outlined in the Company's Management
Discussion and Analysis of its audited financial statements filed with the British Columbia Securities
Commission.
NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT
TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS
RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/65455