Patriot Gold Bruner Project Delivers Final Results For Its 2014 Drilling Program
Patriot Gold Bruner Project Delivers Final Results For Its 2014 Drilling Program
Core drilling at Penelas East discovery area intersected gold mineralization across a 170 feet (51.8 meters) interval in B-1454C, the last hole drilled in the area for 2014.
Follow-up drilling is planned to explore the area further north of Penelas East given the deeper intercepts uncovered thus far.
Core drilling at the historic resource area intersected gold mineralization across a 105.3 feet (32.1 meters) interval in B-1463C, the next-to-last hole drilled in the area for 2014 with considerable potential to expand the resource further north.
Because both of these final holes of the 2014 drilling program indicate further exploration potential, drilling program proposals are already in the works for 2015 to pursue possible extensions in both areas.
Disclaimer: This announcement may contain forward-looking statements which involve risks and uncertainties that include, among others, limited operating history, limited access to operating capital, factors detailed in the accuracy of geological and geophysical results including drilling and assay reports; the ability to close the acquisition of mineral exploration properties, and other factors which may cause the actual results, performance or achievements of the company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. More information is included in the company's filings with the Securities and Exchange Commission, and may be accessed through the SEC's web site at http://www.sec.gov.