Patriot Gold Announces Initial Metallurgy Results for Moss Mine Project, Arizona
Patriot Gold Announces Initial Metallurgy Results for Moss Mine Project, Arizona
Moss Mine Project Preliminary Bottle Roll Cyanide Leach Tests - Oxide and Sulfide Composite Samples
Sample ID
Crush Size
Calculated Head
Cumulative Extraction
MOSS MINE PROJECT- Oxide Composite Sample
Crush Size Locked Cycle Column Leach Study
Summary of Results
Sample ID
Test No.
Crush Size
Calculated Head (g/t)
Cumulative
Extraction (%)
Extraction (g/t)
P80 1 inch
P80 1/2 inch
P80 1/4 inch
Disclaimer: This announcement may contain forward-looking statements which involve risks and uncertainties that include, among others, limited operating history, limited access to operating capital, factors detailed in the accuracy of geological and geophysical results including drilling and assay reports; the ability to close the acquisition of mineral exploration properties, and other factors which may cause the actual results, performance or achievements of the company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. More information is included in the company's filings with the Securities and Exchange Commission, and may be accessed through the SEC's web site at http://www.sec.gov.