Wednesday, May 6, 2026
MiningNewsTerminal
Wednesday, May 6, 2026 Admin

PGOL.CN · ·

Bruner Gold Project Intersects 11.1 g/tonne Over 4.6 Meters, Visible Gold Reported

Drill Results Mergers & Acquisitions

Original source ↗

Bruner Gold Project Intersects 11.1 g/tonne Over 4.6 Meters, Visible Gold Reported

RC drill hole B-1430 is the first drill hole intersecting the plane of the Penelas Vein structure (at 15 feet grading 0.324 oz/ton of gold) at historically significant mined depths with gold visibility observed during the drilling process.

Metallic screen assays are already underway to test the accuracy of the fire assay data.

Drill holes B-1433 and B-1434 were also drilled into the Penelas Vein structure at similar depths.

Additional drilling on the vein will be determined after all data has been fully evaluated and aligned with existing access requirements.

Disclaimer: This announcement may contain forward-looking statements which involve risks and uncertainties that include, among others, limited operating history, limited access to operating capital, factors detailed in the accuracy of geological and geophysical results including drilling and assay reports; the ability to close the acquisition of mineral exploration properties, and other factors which may cause the actual results, performance or achievements of the company to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. More information is included in the company's filings with the Securities and Exchange Commission, and may be accessed through the SEC's web site at http://www.sec.gov.