Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PGLD.V ·

P2 Gold Intersects 0.71 g/t Gold and 0.31% Copper Over 54.86 Meters, Including 1.28 g/t Gold and 0.43% Copper over 22.86 meters at Lucky Strike Zone

Drill Results

P2 Gold Intersects 0.71 g/t Gold and 0.31%

Copper Over 54.86 Meters, Including 1.28 g/t

Gold and 0.43% Copper over 22.86 meters at

Lucky Strike Zone

VANCOUVER, BC

,

March 3, 2026

/CNW/ -

P2 Gold Inc.

("P2" or the "Company") (TSXV: PGLD)

(OTCQB: PGLDF) reports results from an additional ten reverse circulation ("RC") drill holes (GBR-

082 to 091) drilled at the Lucky Strike Zone as part of the Infill and Expansion Drill Program at its

Gabbs Project located on the Walker-Lane Trend in Nevada. A total of 11,500 meters in 70 RC

holes is planned for the Lucky Strike Zone as part of the Infill and Expansion Drill Program. On

completion of the drilling underway at the Lucky Strike Zone, the RC drill is expected to return to the

Sullivan Zone for additional drilling to extend the zone down dip. Results from drilling to date confirm

the Mineral Resource model for the Lucky Strike Zone.

Drilling Highlights

Select drill results (see Table 1 below for drill results) from holes GBR-082 to GBR-091 drilled at the

Lucky Strike Zone include:

Hole GBR-088

intersected

0.65 g/t gold and 0.32% copper over 68.58 meters from 54.86

meters downhole

,

including 18.29 meters grading 1.22 g/t gold and 0.64% copper (one

sample capped at 8 g/t gold) starting 54.86 meters downhole

and also intersected 0.20 g/t

gold and 0.11% copper over 27.43 meters starting 123.44 meters downhole and intersected

0.13 g/t gold and 0.18% copper over 47.24 meters starting 167.64 meters downhole;

Hole GBR-089

intersected

0.71 g/t gold and 0.31% copper over 54.86 meters starting

74.68 meters downhole

,

including 22.86 meters grading 1.28 g/t gold and 0.43% copper

starting 74.68 meters downhole

and also intersected 0.21 g/t gold and 0.15% copper over

45.72 meters starting 164.59 meters downhole;

Hole GBR-091

intersected

0.51 g/t gold and 0.22% copper over 68.58 meters from 47.24

meters downhole

,

including 22.86 meters grading 0.92 g/t gold and 0.34% copper

starting 48.77 meters downhole

and also intersected 0.11 g/t gold and 0.15% copper over

41.15 meters starting 115.82 meters downhole.

The available drill data confirms that the ore controls at Lucky Strike are the same as at the Sullivan

Zone where mineralization is localized within and below a tabular unit of quartz monzonite underlain

by pyroxenite. As with Sullivan, the higher-grade gold and copper at Lucky strike is at the core of

the zone and at restricted halos around subvertical structures. This mineralization is gold dominant

and gives way to copper-gold mineralization in the footwall of the main mineralized body. At Lucky

Strike, the deeper footwall mineralization ranges in thickness from 20 meters to 60 meters and with

the main mineralized body ranging up to 75 meters thick forms a zone with a combined thickness of

up to 125 meters thick. There are numerous quartz filled structures that cut across the Lucky Strike

Zone which come to surface and were exploited historically as narrow, high-grade pits and shallow

workings.

The Lucky Strike Zone remains open in all directions. Drilling is currently focused on the western

half of the zone, which measures approximately 700 meters by 500 meters, as defined by current

and historical drilling, and is where the relatively shallow mineralization is hosted. This targeted area

is roughly the same size as the Sullivan Zone. Based on available current and historical drill data,

the Lucky Strike Zone has the potential to be significantly larger than the Sullivan Zone.

Since the start of the Program in October 2025, a total of 57 RC drill holes have been drilled, with

24 holes drilled at the Sullivan Zone and 33 holes drilled at the Lucky Strike Zone. The diamond drill

has completed 18 metallurgical and slope stability geotechnical holes to date. Assays will continue

to be reported over the coming months.

On completion of the Infill and Expansion Drill Program, an updated Mineral Resource estimate will

be prepared for Gabbs, which is expected to be completed in the third quarter of 2026. The

updated Mineral Resource estimate will form the basis of a feasibility study on placing Gabbs in

production, which is expected to be completed in the fourth quarter of 2026.

Lucky Strike Zone Plan View (CNW Group/P2 Gold Inc.)

Lucky Strike Section RR-RR' (CNW Group/P2 Gold Inc.)

Lucky Strike Section CC-CC' (CNW Group/P2 Gold Inc.)

Lucky Strike Section EE-EE' (CNW Group/P2 Gold Inc.)

Table 1: Selected Gabbs Drill Results, March 2026 (GBR-082 to GBR-091)

(1, 2)

Hole

Collar Coords

Dip/

Azimuth

From

(m)

To

(m)

Interval

(m)

Gold

(g/t)

Copper

(%)

GBR-082

N4293869/

E414909

-90/0

7.62

59.44

51.82

0.44

0.18

FM

(3)

59.44

94.49

35.05

0.12

0.15

GBR-083

N4293869/

E414910

-55/45

7.62

57.91

50.29

0.47

0.23

FM

60.96

114.30

53.34

0.21

0.22

GBR-084

N4293869/

E414910

-55/135

7.62

64.01

56.39

0.42

0.22

FM

64.01

124.97

60.96

0.14

0.15

GBR-085

N4293869/

E414910

-50/225

22.86

74.68

51.82

0.39

0.19

FM

74.68

97.54

22.86

0.18

0.13

FM

114.30

137.16

22.86

0.15

0.15

GBR-086

N4293869/

E414910

-60/315

16.76

67.06

50.29

0.52

0.22

FM

85.34

112.78

27.43

0.12

0.21

GBR-087

N4293812/

E415017

-70/0

53.34

118.87

65.53

0.44

0.20

FM

118.87

152.40

33.53

0.11

0.16

GBR-088

N4293812/

E415017

-65/45

54.86

123.44

68.58

0.65

(4)

0.32

incl

54.86

73.15

18.29

1.22

(4)

0.64

FM

123.44

150.88

27.43

0.20

0.11

FM

167.64

214.88

47.24

0.13

0.18

GBR-089

N4293812/

E415017

-65/135

74.68

129.54

54.86

0.71

0.31

Incl

74.68

97.54

22.86

1.28

0.43

FM

164.59

210.31

45.72

0.21

0.15

GBR-090

N4293803/

E415019

-60/225

60.96

120.40

59.44

0.43

0.18

FM

140.21

182.88

42.67

0.14

0.18

GBR-091

N4293803/

E415019

-60/315

47.24

115.82

68.58

0.51

0.22

Incl

48.77

71.63

22.86

0.92

0.34

FM

115.82

156.97

41.15

0.11

0.15

(1)

True thickness to be determined.

(2)

All samples were submitted for preparation by ALS Global at its facilities in Reno, Nevada, with the analysis completed at ALS Global facilities in Reno, Nevada, and North

Vancouver, British Columbia. All samples were analyzed using multi-digestion with ICP finish and fire assay with AA finish for gold. Samples with over 10 ppm gold were fire

assayed with a gravimetric finish. One in 20 samples was blank, one in 20 was a standard sample, and one in 20 samples had a sample cut from assay rejects assayed as a

field duplicate.

(3)

FM means footwall mineralization

(4)

One sample (1.52 meters) capped at 8 g/t gold.

Qualified Person

Ken McNaughton, M.A.Sc., P.Eng., Chief Exploration Officer, P2 Gold, is the Qualified Person, as

defined by National Instrument 43-101, responsible for the Gabbs Project. Mr. McNaughton has

reviewed, verified, and approved the scientific and technical information in this news release.

About P2 Gold Inc.

P2 Gold is a mineral exploration and development company focused on advancing its gold-copper

Gabbs Project on the Walker Lane Trend in Nevada, where work to support a feasibility study is

underway. A positive preliminary economic assessment has outlined a long-life, mid-size mine at

Gabbs with annual average production of 109,000 ounces gold, 15,000 tonnes copper over a 14.2-

year mine life. The Gabbs Project has excellent infrastructure with access via paved Hwy 361, and

power and water on site. Additional metallurgical work is being planned, and a water permit is

expected in the first quarter of this year. All zones on the property remain open and additional

exploration targets, near surface and at depth, are drill ready.

Neither the TSX Venture Exchange (the "Exchange") nor its Regulation Services Provider (as that

term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Forward Looking Information

This press release contains "forward-looking information" within the meaning of applicable securities

laws that is intended to be covered by the safe harbours created by those laws. "Forward-looking

information" includes statements that use forward-looking terminology such as "may", "will", "expect",

"anticipate", "believe", "continue", "potential" or the negative thereof or other variations thereof or

comparable terminology. Such forward-looking information includes, without limitation, information

with respect to the Company's expectations, strategies and plans for the Gabbs Project including the

Company's planned expenditures and exploration activities.

Forward-looking information is not a guarantee of future performance and is based upon a number

of estimates and assumptions of management at the date the statements are made as well as the

other assumptions disclosed in this news release. Furthermore, such forward-looking information

involves a variety of known and unknown risks, uncertainties and other factors which may cause the

actual plans, intentions, activities, results, performance or achievements of the Company to be

materially different from any future plans, intentions, activities, results, performance or achievements

expressed or implied by such forward-looking information and risks associated with mineral

exploration, including the risk that actual results and timing of exploration and development will be

different from those expected by management. See "Risk Factors" in the Company's annual

information form for the year ended December 31, 2024, dated March 21, 2025 filed on SEDAR+ at

www.sedarplus.com

for a discussion of these risks.

The Company cautions that there can be no assurance that forward-looking information will prove to

be accurate, as actual results and future events could differ materially from those anticipated in such

information. Accordingly, investors should not place undue reliance on forward-looking information.

Except as required by law, the Company does not assume any obligation to release publicly any

revisions to forward-looking information contained in this press release to reflect events or

circumstances after the date hereof.

SOURCE P2 Gold Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/March2026/03/c9729.html

%SEDAR: 00045664E

For further information:

For further information, please contact: Joseph Ovsenek, President &

CEO, (778) 731-1055, P2 Gold Inc., Suite 789, 999 West Hastings Street, Vancouver, BC, V6C

2W2, [email protected], (SEDAR filings: P2 Gold Inc.); Michelle Romero, Executive Vice President,

(778) 731-1060

CO: P2 Gold Inc.

CNW 05:00e 03-MAR-26