P2 Gold Files Gabbs PEA Technical Report
P2 Gold Files Gabbs PEA Technical Report
VANCOUVER, BC
,
July 4, 2024
/CNW/ -
P2 Gold Inc.
("P2" or the "Company") (TSXV: PGLD)
(OTCQB: PGLDF) reports it has filed a National Instrument 43-101 Standards of Disclosure for
Mineral Projects ("NI 43-101") technical report entitled "NI 43-101 Technical Report, Preliminary
Economic Assessment, Gabbs Heap Leach and Mill Project,
Nye County, Nevada
, USA", with an
effective date of
May 17, 2024
(the "Gabbs Technical Report"). The Gabbs Technical Report is
available under the Company's profile on SEDAR at
www.sedar.com
and on the Company's website
at
www.p2gold.com
.
The Gabbs Technical Report was prepared by
Carl E. Defilippi
, RM, SME of Kappes, Cassiday &
Associates of
Reno Nevada
,
Eugene Puritch
, P.Eng., FEC, CET,
Andrew Bradfield
, P.Eng.,
William
Stone
, Ph.D., P.Geo.,
Jarita Barry
, P.Geo. and
David Burga
, P.Geo. of P&E Mining Consultants Inc.
of
Brampton, Ontario
and
Douglas Willis
, CPG of Welsh Hagen Associates of
Reno Nevada
, each of
whom is a "Qualified Person" as defined by NI 43-101 and independent of the Company.
About P2 Gold Inc.
P2 Gold is a mineral exploration and development company focused on advancing its gold-copper
Gabbs Project on the Walker Lane Trend in
Nevada
. A positive preliminary economic assessment
has outlined a long-life, mid-size mine at Gabbs with annual average production of 104,000 ounces
gold and 13,500 tonnes copper over a 14.2 year mine life.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this release.
Forward Looking Information
This press release contains "forward-looking information" within the meaning of applicable securities
laws that is intended to be covered by the safe harbours created by those laws. "Forward-looking
information" includes statements that use forward-looking terminology such as "may", "will", "expect",
"anticipate", "believe", "continue", "potential" or the negative thereof or other variations thereof or
comparable terminology. Such forward-looking information includes, without limitation, information
with respect to the Company's expectations, strategies and plans for its exploration and
development projects, including the Company's planned expenditures and exploration and
development activities at the Gabbs Project.
Forward-looking information is not a guarantee of future performance and is based upon a number
of estimates and assumptions of management at the date the statements are made. Furthermore,
such forward-looking information involves a variety of known and unknown risks, uncertainties and
other factors which may cause the actual plans, intentions, activities, results, performance or
achievements of the Company to be materially different from any future plans, intentions, activities,
results, performance or achievements expressed or implied by such forward-looking information.
See "Risk Factors" in the Company's annual information form for the year ended
December 31,
2023
, dated
March 21, 2024
filed on SEDAR at www.sedar.com for a discussion of these risks.
The Company cautions that there can be no assurance that forward-looking information will prove to
be accurate, as actual results and future events could differ materially from those anticipated in such
information. Accordingly, investors should not place undue reliance on forward-looking information.
Except as required by law, the Company does not assume any obligation to release publicly any
revisions to forward-looking information contained in this press release to reflect events or
circumstances after the date hereof.
SOURCE
P2 Gold Inc.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/July2024/04/c8806.html
%SEDAR: 00045664E
For further information:
For further information, please contact: Joseph Ovsenek, President &
CEO, (778) 731-1055, P2 Gold Inc., Suite 789, 999 Hastings Street, Vancouver, BC, V6C 2W2,
[email protected], (SEDAR filings: P2 Gold Inc.); Michelle Romero, Executive Vice President, (778)
731-1060
CO: P2 Gold Inc.
CNW 07:57e 04-JUL-24