Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PGLD.V ·

P2 Gold Announces Positive Metallurgical Results with Higher Gold, Silver and Copper Recoveries

Metallurgy & Processing

P2 Gold Announces Positive Metallurgical

Results with Higher Gold, Silver and Copper

Recoveries

VANCOUVER, BC

,

Aug. 11, 2025

/CNW/ -

P2 Gold Inc.

("P2" or the "Company") (TSXV: PGLD)

(OTCQB: PGLDF) reports positive test results from the metallurgical program for its gold-copper

Gabbs Project located on the Walker-Lane Trend in

Nevada

.

After 115 days of leaching, the metal recoveries of the Phase 3 Metallurgical Program are far

exceeding the recoveries used in the

May 2024

Preliminary Economic Assessment on the Gabbs

Project. See Table 1 below for a comparison of the Phase Three results at 115 days to the Phase

Three results at 58 days and the recoveries used in the 2024 Preliminary Economic Assessment.

Table 1: Comparison of Oxide Sample Column Test Leach Results

(1)(2)

Metal

Average Metal

Recovery of Phase 3

Met Program

at 115 Days

Average Metal

Recovery of Phase 3

Met Program

at 58 Days

(3)

May 2024

Preliminary

Economic

Assessment Leach

Recoveries

(4)

Gold

88.1 %

86.6 %

78 %

Silver

81.6 %

73.5 %

45 %

Copper

66.5 %

56.6 %

54 %

(1)

Samples were submitted for preparation and multi-element analysis by Kappes, Cassiday & Associates. All samples were analyzed using multi-acid digestion with ICP

finish for silver and copper and fire assay with AA finish for gold.

(2)

Recoveries based are on standard assaying protocols and will be subject to change at the end of the program when tail assays are available and incorporated into the

calculated head assays.

(3)

See P2 Gold news release dated June 16, 2025, available under the Company's profile on SEDAR+ at www.sedarplus.com and on the Company's website at

www.p2gold.com.

(4)

See P2 Gold news release dated May 22, 2024, and the Gabbs Technical Report dated May 17, 2024 available under the Company's profile on SEDAR+ at

www.sedarplus.com and on the Company's website at www.p2gold.com.

"The Phase Three Metallurgical Program was established with a target of improving the leach

kinetics and overall extraction by adding cyanide during agglomeration and by increasing the cyanide

concentration in the leach solutions," commented

Joe Ovsenek

, President & CEO of P2. "Recoveries

and leach kinetics have significantly improved with 98% of the gold, 90% of the silver and 85% of the

copper recovered in the first 58 days of leaching."

The Phase Three Metallurgical Program ended at 115 days of leaching with copper and silver

recoveries continuing to increase. Final metallurgical recoveries will be announced upon completion

of final analysis.

The Company retained Kappes, Cassiday & Associates ("KCA") in

Reno, Nevada

to carry out the

Phase Three Metallurgical Program, which is focused on increasing copper and gold recoveries of

the oxide mineralization and providing a marketing sample of the copper-silver SART (sulphidization,

acidification, recycling and thickening) concentrate.

2025 Preliminary Economic Assessment Update

Following completion of the Phase Three Metallurgical Program, the Company plans to update the

May 2024

Preliminary Economic Assessment using, among other things, the updated recoveries for

gold, copper and silver.

Using existing recoveries (78% for oxide gold mineralization, 45% for oxide silver mineralization and

54% for oxide copper mineralization)

Gabbs

has an internal rate of return of 56.5% and net present

value at a 5% discount rate of over

US$1.6 billion

at

August 7, 2025

spot metal prices of

$3,391

gold,

$38.06

silver and

$4.35

copper. (See the Company's preliminary economic assessment

announced on

May 22, 2024

and described in the Gabbs Technical Report dated

May 17, 2024

available under the Company's profile on SEDAR+ at

www.sedarplus.com

.)

Qualified Person

Ken McNaughton

, M.A.Sc., P.Eng., Chief Exploration Officer, P2 Gold, is the Qualified Person, as

defined by National Instrument 43-101, responsible for the Gabbs Project. Mr. McNaughton has

reviewed, verified, and approved the scientific and technical information in this news release.

About P2 Gold Inc.

P2 Gold is a mineral exploration and development company focused on advancing its gold-copper

Gabbs Project on the Walker Lane Trend in

Nevada

. A positive preliminary economic assessment

has outlined a long-life, mid-size mine at Gabbs with annual average production of 104,000 ounces

gold and 13,500 tonnes copper over a 14.2-year mine life. The Gabbs Project has excellent

infrastructure with access via paved Hwy 361, and power and water on site. Additional metallurgical

testing is underway, and a water permit is expected in the second quarter of this year. All zones on

the property remain open and additional exploration targets, near surface and at depth, are drill

ready.

Neither the TSX Venture Exchange (the "Exchange") nor its Regulation Services Provider (as that

term is defined in the policies of the Exchange) accepts responsibility for the adequacy or accuracy

of this release.

Forward Looking Information

This press release contains "forward-looking information" within the meaning of applicable securities

laws that is intended to be covered by the safe harbours created by those laws. "Forward-looking

information" includes statements that use forward-looking terminology such as "may", "will", "expect",

"anticipate", "believe", "continue", "potential" or the negative thereof or other variations thereof or

comparable terminology. Such forward-looking information includes, without limitation, information

with respect to the Company's expectations, strategies and plans for its Gabbs Project including the

Company's planned expenditures and exploration activities.

Forward-looking information is not a guarantee of future performance and is based upon a number

of estimates and assumptions of management at the date the statements are made, including

without limitation, the estimated internal rate of return and net present value at a 5% discount rate of

the Gabbs Project, as well as the other assumptions disclosed in this news release. Furthermore,

such forward-looking information involves a variety of known and unknown risks, uncertainties and

other factors which may cause the actual plans, intentions, activities, results, performance or

achievements of the Company to be materially different from any future plans, intentions, activities,

results, performance or achievements expressed or implied by such forward-looking information,

including without limitation, the estimates and assumptions contained in the Gabbs Technical Report

dated

May 17, 2024

, and risks associated with mineral exploration, including the risk that actual

results and timing of exploration and development will be different from those expected by

management. See "Risk Factors" in the Company's annual information form for the year ended

December 31, 2024

, dated

March 21, 2025

filed on SEDAR+ at

www.sedarplus.com

for a

discussion of these risks.

The Company cautions that there can be no assurance that forward-looking information will prove to

be accurate, as actual results and future events could differ materially from those anticipated in such

information. Accordingly, investors should not place undue reliance on forward-looking information.

Except as required by law, the Company does not assume any obligation to release publicly any

revisions to forward-looking information contained in this press release to reflect events or

circumstances after the date hereof.

SOURCE

P2 Gold Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/August2025/11/c9437.html

%SEDAR: 00045664E

For further information:

For further information, please contact: Joseph Ovsenek, President &

CEO, (778) 731-1055; P2 Gold Inc., Suite 789, 999 West Hastings Street, Vancouver, BC, V6C

2W2, [email protected], (SEDAR filings: P2 Gold Inc.); Michelle Romero, Executive Vice President,

(778) 731-1060

CO: P2 Gold Inc.

CNW 05:00e 11-AUG-25