Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PGLD.V ·

Central Timmins Exploration Corp. Completes Summer Work Program Best Intercept in the Dayton Gold Zone in Deloro Township 6.35 m

Drill Results Exploration Programs

Central Timmins Exploration Corp. Completes

Summer Work Program

Best Intercept in the Dayton Gold Zone in

Deloro Township

6.35 m

@ 3.29 g/t Gold (estimated true width

4.93 m

)

/NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES OR FOR RELEASE, PUBLICATION,

DISTRIBUTION OR DISSEMINATION DIRECTLY, OR INDIRECTLY, IN WHOLE OR IN PART, IN

OR INTO

THE UNITED STATES

./

CTEC interprets that the Historical Dayton gold zone has a parallel quartz breccia

system in sediments

Drill hole D-19-06 in the Dayton Gold Zone in

Deloro Township

intersected 3.29 g/t Au

over a

6.35 m

core width (estimated true width

4.93 m

) from

112.3 m

depth in quartz

sulphide and massive sulfide veins

CTEC's drill hole on the

Four Corners

property intersected a

30 m

wide band of

sediments, which is often a marker horizon above the VMS polymetallic vein style

mineralization in the Kam Kotia area mines

TORONTO

,

Sept. 26, 2019

/CNW/ -

Central Timmins Exploration Corp.

("CTEC" or the

"Company") (TSXV: CTEC) is pleased to present the results from its 2019 summer exploration

program. Diamond drilling totaling 1,600 meters commenced

July 9

th

, successfully advancing several

gold and base metal targets in

Timmins, Ontario

.

CTEC's 100%-owned land position (14,035 ha or 140 km

2

) in the Timmins Camp in

Northern Ontario

has been assembled over the past 15 years and grouped into distinct township referenced projects

within the city limits of

Timmins

. CTEC is undertaking brownfields gold and VMS exploration in the

Timmins Camp both to the north and south of the 10 km wide corridor encompassing the Porcupine

Destor Fault Zone (PDFZ), the preferential exploration focus of the past 100 years.

The Company's Deloro–Ogden Township brownfield exploration is focused on two gold systems

south of the PDFZ, the historic Dayton Gold Zone horizon and the past-producing Faymar Gold

Mine. An additional and substantial gold project on the north side of the PDFZ in

Mountjoy Township

is targeting the potential continuation of the Hollinger-McIntyre gold system westerly into

Mountjoy

Township

. CTEC's base metal-gold project is in the Kamiskotia VMS camp and centred on a series

of narrow but high-grade gold-silver-zinc veins located near the common corner of four Townships

(

Godfrey

, Jamieson,

Robb

, and Turnbull) within the city limits of

Timmins

.

The attached map shows the CTEC project and recently-completed drill holes relative to the giant

gold mines of the Timmins Camp and several of the historic VMS mines in the

Kamiskotia

area.

The summer drill program advanced all three CTEC projects:

Four Corners Project

Drill hole FC-19-01 was collared to test the potential lateral extensions of NW-SE to N-S trending

gold mineralization intersected by Claim Post Resources Inc. (CPS) in 2007 to 2010 drilling. This

drilling intersected multiple gold and zinc base metal bearing zones with widths varying from

0.18 m

(estimated true width

0.14 m

) to

1.63 m

(estimated true width

1.22 m

) at grades ranging from 1.44

g/t Au to 19.97 g/t Au and averaging 3.00 g/t over a

3.00 m

core width (estimated true width

2.25

m

).

More specifically, the hole targeted a magnetic low/coincident MMI target,

300 m

east of a vein set

where only gold values had been intersected in sediments. The CTEC hole intersected

30 m

of

intermixed sediments and porphyries. Identifying this horizon has substantially increased the VMS

potential of the

Four Corners

area. D.R.

Pyke and R.S. Middleton

published a paper in the

March

1971

CIM Bulletin, which describes a sedimentary unit up to

30 m

thick that overlies the rhyolitic unit

hosting the Kam Kotia, Canadian Jamieson, and Jameland VMS orebodies. CTEC is currently

undertaking a downhole IP survey to target potential massive sulphide lenses underlying the gold-rich

polymetallic veins.

South of the PDFZ

CTEC completed two oriented core diamond drill holes on the Dayton Gold Zone in

Deloro Township

first drill tested in the 1930s with 24 diamond drill holes. CPS added an additional 20 holes in 2010

and 2011. The zone has traditionally been viewed as a single narrow iron formation horizon with

variable gold mineralization. Computer modeling of all available drill hole data now indicates a

potential iron formation fold nose targeted by CTEC holes D-6-19 and D-7-19 near 2010 CPS drill

hole CPDP-10-01. Intersections are as follows:

CTEC D-19-06: 6

.

35 m

(estimated true width

4.93 m

) @ 3.29 g/t Au from

112.3 m

depth in

quartz sulphide and massive sulphide (MS) veins

CTEC D-19-07:

3.80 m

(estimated true width

3.44 m

) @ 1.51 g/t Au from

86.5 m

depth in

quartz sulphide and MS veins

CPDP 10-01:

14.07 m

(estimated true width

10.61 m

) @ 1.69 g/t Au from

117.1 m

depth in

quartz sulphide and MS veins

All three holes have intersections of similar quartz sulphide and massive sulphide veins. A down the

hole IP survey plus diamond drilling indicate that the immediate nose fold area of the Dayton Zone is

at least

100 m

long, extends to a depth of at least

150 m

(the extent of current drilling) and plunges

to the southeast. Relogging of the CPS holes is in progress.

The 2019 drilling has identified a second gold bearing quartz breccia horizon located about

15 m

horizontally from the iron formation. Secondly, the quartz breccia is located within a sedimentary

horizon that has previously been misidentified as an andesite-tuff horizon. Thirdly, the dip of the

breccia zones can be interpreted as flat lying or steep dipping parallel to the iron formation; more

drilling is required to confirm the orientation and extent of the breccia zones.

North of the PDFZ

The

Mountjoy

-

Godfrey

project is designed to test the theory that the Hollinger-McIntyre gold system

did not stop at the Mountjoy-Tisdale Township boundary but extends through

Mountjoy Township

to

the west.

Three holes drilled during CTEC's winter drill program had confirmed wide intersections of low-grade

gold mineralization in the Caron porphyry on the west boundary of

Mountjoy

. The best assay from

the program was 2.46 g/t Au over

0.70 m

hosted in porphyry in hole G1-19-02 (see CTEC press

release dated

June 6, 2019

). This hole also had 11 additional narrow gold intersections that assayed

100 to 300ppb Au in altered and quartz veined porphyry.

The summer drill program targeted three anomalies, two potential porphyry targets, one

600 m

and

the second

1,200 m

southeast of the Caron porphyry. The third target was a strong IP anomaly

500

m

directly to the east of the Caron porphyry. Drilling of these targets proved to be very difficult due

to deep overburden.

The first planned porphyry hole was lost at a

60 m

depth at the contact with a gravel deposit. The

patented surface rights owner hosting the second porphyry target wanted the hole to be drilled in a

winter program. The third was successfully drilled through

50 m

of fine sand and

10 m

of gravel and

boulders. The IP anomaly proved to be a graphitic schist.

Charles Gryba

, President and CEO stated, "CTEC's summer drill program successfully confirmed

that the narrow

Four Corners

high-grade base metal and gold veins are in the right location relative

to the rhyolite horizon that hosts the VMS deposits in the Kam Kotia area. Of particular interest is

that the CPS drilling in 2007 intersected gold mineralization in the sedimentary horizon that caps the

rhyolite-VMS horizon. There may be a gold system in addition to the VMS system.

Exploration drilling south of the PDFZ was very successful in expanding the potential of the Dayton

Gold Horizon. The two holes drilled into the zone confirmed a second gold horizon in a newly

recognized and prospective sedimentary unit. The new gold mineralization may be parallel to the iron

formation and/or flatter dipping. Recent government mapping plus a Deep Seismic survey following

Pine Street south of

Timmins

both indicate that the Dayton Gold Zone curves through a 10 km long

east-west anticline of the south side of the PDFZ. The quartz breccia zones may relate to fractured

areas along the hinge line of the large anticline. More drilling is required.

In addition to the summer drilling, a detailed geophysical compilation and interpretation of a historic

Mountjoy

airborne magnetic survey plus other historical geophysical surveys has been undertaken.

The results are now being analyzed by CTEC geologists in the hopes of advancing the theory that

Hollinger-McIntyre stratigraphy extends into and possibly across

Mountjoy Township

and further

drilling may be proposed. The company is also carrying out limited IP surveys to confirm

Mountjoy

gold targets."

The Company remains well financed and will announce details of the next phase of its exploration

program once all current information is compiled and reviewed.

CTEC has a comprehensive, industry standard Quality Assurance/Quality Control program in place

covering all its drill core assaying being done at Activation Laboratories Ltd. in

Ancaster, Ontario

.

The program is supervised by an independent Qualified Person.

Mr.

John Sullivan

, B.Sc., P. Geo, independent director of CTEC, has acted as the Qualified Person,

as defined in NI 43-101, with respect to the disclosure of the scientific and technical information

relating to exploration results and future plans disclosed in this press release.

About Central Timmins Exploration Corp.

CTEC is an early-stage Canadian junior exploration company with property exclusively within the city

limits of

Timmins

in the Porcupine Mining District in the northeastern region of

Ontario

. The

Company's assets are prospective for gold as well as a suite of base metals. See the company

website at

www.centraltimmins.com

.

Forward Looking Information

This press release contains "forward-looking information" within the meaning of applicable securities

laws that is intended to be covered by the safe harbours created by those laws. "Forward-looking

information" includes statements that use forward-looking terminology such as "may", "will", "expect",

"anticipate", "believe", "continue", "potential" or the negative thereof or other variations thereof or

comparable terminology. Such forward-looking information includes, without limitation, the

Corporation's expectations, strategies and plans for the Timmins Properties, including the

Corporation's planned exploration activities and the intended uses of the net proceeds of the IPO.

Forward-looking information is not a guarantee of future performance and is based upon a number

of estimates and assumptions of management at the date the statements are made. Furthermore,

such forward-looking information involves a variety of known and unknown risks, uncertainties and

other factors which may cause the actual plans, intentions, activities, results, performance or

achievements of the Corporation to be materially different from any future plans, intentions,

activities, results, performance or achievements expressed or implied by such forward-looking

information. See "Risk Factors" in the Corporation's final prospectus dated

October 4, 2018

filed on

SEDAR at

www.sedar.com

for a discussion of these risks.

The Corporation cautions that there can be no assurance that forward-looking information will prove

to be accurate, as actual results and future events could differ materially from those anticipated in

such information. Accordingly, investors should not place undue reliance on forward-looking

information.

Except as required by law, the Corporation does not assume any obligation to release publicly any

revisions to forward-looking information contained in this press release to reflect events or

circumstances after the date hereof.

Neither the Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the Exchange) accepts responsibility for the adequacy or accuracy of this release.

CTEC Project Location Map (CNW Group/Central Timmins Exploration Corp)

SOURCE

Central Timmins Exploration Corp

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/September2019/26/c8443.html

%SEDAR: 00045664E

For further information:

Central Timmins Exploration Corp., Charles Gryba, President, CEO &

Director, [email protected], Tel: 416-801-6366; Chris Hopkins, CFO, [email protected], Tel:

416 786 9793

CO: Central Timmins Exploration Corp

CNW 08:30e 26-SEP-19