Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PGE.V ·

Group Ten Metals Completes Earn-In at Kluane PGE-Ni-Cu Project and Acquires Additional Adjacent Properties

Mergers & Acquisitions Property Options & Staking

Group Ten Metals Completes Earn-In at Kluane PGE-Ni-Cu Project and

Acquires Additional Adjacent Properties

VANCOUVER, British Columbia, July 16, 2018 -- Group Ten Metals Inc. (TSX.V:PGE) US OTC:PGEZF) (FSE:5D32) (the

“Company” or “Group Ten”) is pleased to provide an update on the Company’s Kluane PGE-Ni-Cu project, including the

completion of all outstanding earn-in requirements on the Ultra claim block and the addition of highly prospective new

properties to the project which add substantial exploration potential. Group Ten holds the largest land position in the Kluane

Ultramafic Belt; a mafic-ultramafic system that extends from northern BC through the Yukon to central Alaska and hosts

multiple PGE-Ni-Cu deposits. The Kluane project is located in Canada’s Yukon Territory on trend with Nickel Creek Platinum’s

Nickel Shäw project.

President and CEO Michael Rowley stated, “Results from our work programs confirm the exploration potential for new

discoveries of platinum group elements (PGE), nickel and copper within the Kluane Ultramafic Belt. The completion of our earn

-in at Ultra, and previously at Spy, coupled with our recent strategic acquisitions in the district, has strengthened our position

and brought us to 100% ownership on four key holdings being the Spy, Ultra, and Ellen properties, and also portions of the

Catalyst property. The Company has received expressions of interest from potential partners on the project and has planned

modest exploration programs for 2018 to further advance and demonstrate the high potential of this large land package

accordingly. Our Yukon and Ontario assets complement Group Ten’s core Stillwater West project with two large and highly

prospective land positions that are strategically located beside advanced-stage projects in world-class mining districts.”

A photo accompanying this announcement is available at http://www.globenewswire.com/NewsRoom/AttachmentNg/b125255f-

db2a-4555-922a-700718df3c41

Ellen Acquisition

Group Ten has acquired a 100% interest in the Ellen property pursuant to a purchase agreement with an arms-length private

vendor.  The Ellen property consists of 72 claims covering more than 13 square kilometers located approximately 4 kilometers

southeast of the Company’s Ultra claim block. Exploration at Ellen has identified significant massive sulphide mineralization

from drilling and trenching.  Drilling includes 17 drill holes from 1954 to 1995 with 12 holes returning significant sulphide

mineralization including 3.15% Cu over 5.2 meters in MC66-1, 1.64% Cu over 10.4 meters in MC66-2, 1.76% Cu over 5.5

meters in hole 95-1, and a 2.13-meter intersection grading 1.96% Cu and 2,098 ppb Au in hole 95-3. Trenching returned values

of up to 7.2% Cu with 1 g/t Au and 1 g/t Pd.  Strong copper plus gold soil geochemical signatures have been identified on the

property that are coincident with a large geophysical conductor nearly 1 kilometer in length (Davidson, 1995) 1 and (Pautlier,

2006)2.

In consideration, Group Ten will pay the vendor $3,200 and issue a total of 600,000 common shares of the Company within 10

days of regulatory approval. Issuance of shares per the agreement is subject to regulatory approval.

Outpost and Pacer Acquisition

The Company has also executed an option agreement with an arms-length private vendor, whereby Group Ten can earn a

100% interest in the Outpost and Pacer properties which consist of three claim blocks totaling approximately 25km 2.

The Outpost and Pacer properties show significant potential for discovery of new PGE-Ni-Cu deposits with a mineralized 70-

meter-wide mafic to ultramafic body that outcrops at Outpost adjoining the main Ultra property package, and elevated Ni and

Cu values in soils corresponding with kilometer-scale magnetic anomalies at both Outpost and Pacer.  Rock sample results at

Pacer show elevated Cu and Ni in an area adjacent to the Ellen property where drilling has intercepted mineralized ultramafic

sills.

Group Ten can earn a 100% interest in the properties by:

• making a cash payment of $8,000 and issuing 200,000 common shares of the Company within 10 days of regulatory

approval;

• completing $30,000 of work expenditures, making a cash payment of $20,000 and issuing 400,000 common shares of

the Company on or before the first anniversary of signing; and

• completing an additional $105,000 of work expenditures and issuing 500,000 common shares of the Company on or

before the second anniversary of the acceptance of this agreement.

The vendor will retain a royalty interest on the Outpost and Pacer claims, which includes a buy-down provision.  The issuance

of shares per the above agreement is subject to regulatory approval.

Ultra Project Update

Group Ten has completed the earn-in on the Ultra property, per the terms of an agreement announced December 4, 2014, and

now owns a 100% interest in the 93 square kilometer property, as expanded by direct staking, with the vendor retaining a

royalty interest with buy-down provision. The Company has also acquired a 100% interest in 24 claims adjoining the Ultra

project pursuant to a purchase agreement with two arms-length private vendors for a one-time payment of 100,000 shares in

total (subject to regulatory approval).

About the Kluane PGE-Ni-Cu Project

The Kluane PGE-Ni-Cu project is on trend with the Nickel Shäw project now being advanced by Nickel Creek Platinum Corp.

PGE-Ni-Cu mineralization in the Kluane belt typically occurs as magmatic disseminated to massive sulphides associated with

mafic to ultramafic intrusive bodies. 

The most advanced targets on the Kluane PGE-Ni-Cu project are the Ellen showing, as summarized above, and the Spy Sill,

which has been traced for over 8 kilometers with widths of 75 to 100 meters at surface.  Massive sulphide mineralization at the

Spy target have assayed up to 5.5 g/t 3E (3.1 g/t Pt, 1.4 g/t Pd, 1.0 g/t Au) with 3.1% Ni, 2.8% Cu and 0.2% Co, and historic

grab sample results of up to 90.7 g/t 3E (75.8 g/t Pt, 7.9 g/t Pd, 7.0 g/t Au) with 2.6% Ni, 10.5% Cu and 0.09% Co reported

from footwall siltstones (Bell, 1996)3. 

Trenches from the Ultra block yielded up to 19.5 g/t 3E (5.5 g/t Pt, 13.5 g/t Pd, 0.5 g/t Au), with 4.1% Cu, and 1.7% Ni from

an ultramafic sill (Casselman, 2005)4.

Work in 2017 included ground-based geophysics and soil and rock sampling programs, which successfully advanced multiple

targets for follow-up work in 2018, as the Company moves several zones to drill-ready status.  Work at the Ultra claim block

followed-up on the discovery of the UZE Zone and included a soil sampling and UAV MAG survey.  Soil sample results showed

elevated Ni, Cu, Au, Pt, Pd values associated with magnetic anomalies. Work for 2018 will continue to advance targets

towards drill testing with a focus on the Spy and Ultra areas, including the recently acquired land positions.

About Group Ten Metals Inc.

Group Ten Metals Inc. is a TSX-V-listed Canadian mineral exploration company focused on the development of high-quality

platinum, palladium, nickel, copper and gold exploration assets in top North American mining jurisdictions. The Company’s

core asset is the Stillwater West PGE-Ni-Cu project adjacent to Sibanye-Stillwater’s high-grade PGE mines in Montana, USA.

Group Ten also holds the highly prospective  Kluane PGE-Ni-Cu project on trend with Nickel Creek Platinum‘s Wellgreen

deposit in the Yukon Territory, Canada and the high-grade Black Lake-Drayton Gold project in the Rainy River district of

northwest Ontario.

References

1 - Davidson, G.S., 1995. Assessment report on the Ellen claims NTS A-113. Yukon Assessment Report 093356.

2 – Pautlier, J., 2006.  Geological and Geochemical Evaluation Report of the Ellen Project. Yukon Assessment Report

094776.

3 - Bell, C. 1996. Report on 1995 geological and geochemical surveys on the Klu property. Yukon Assessment Report

0933371.

4 – Casselman, S., 2005. Geological mapping and airborne surveying program on the Ultra property, Haines Junction area,

Yukon Territory. Yukon Assessment Report 094485.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Michael Rowley, President, CEO & Director

Email: [email protected]                            Phone: (604) 357 4790

Web: http://grouptenmetals.com                           Toll Free: (888) 432 0075

Quality Control and Quality Assurance

Ms. Debbie James, P.Geo., is the qualified person for the purposes of National Instrument 43-101, and she has reviewed and

approved the technical disclosure contained in this news release.

Historic samples were collected by reputable operators, using standard QAQC procedures and practices current at the time of

collection. They are considered reliable. Samples are not necessarily representative of all the mineralization hosted in the

area.

Forward-Looking Statements

Forward Looking Statements: This news release includes certain statements that may be deemed "forward-looking

statements". All statements in this release, other than statements of historical facts including, without limitation, statements

regarding potential mineralization, historic production, estimation of mineral resources, the realization of mineral resource

estimates, interpretation of prior exploration and potential exploration results, the timing and success of exploration activities

generally, the timing and results of future resource estimates, permitting time lines, metal prices and currency exchange

rates, availability of capital, government regulation of exploration operations, environmental risks, reclamation, title, and future

plans and objectives of the company are forward-looking statements that involve various risks and uncertainties. Although

Group Ten believes the expectations expressed in such forward-looking statements are based on reasonable assumptions,

such statements are not guarantees of future performance and actual results or developments may differ materially from those

in the forward-looking statements. Forward-looking statements are based on a number of material factors and assumptions.

Factors that could cause actual results to differ materially from those in forward-looking statements include failure to obtain

necessary approvals, unsuccessful exploration results, changes in project parameter as plans continue to be refined, results

of future resource estimates, future metal prices, availability of capital and financing on acceptable terms, general economic,

market or business conditions, risks associated with regulatory changes, defects in title, availability of personnel, materials

and equipment on a timely basis, accidents or equipment breakdowns, uninsured risks, delays in receiving government

approvals, unanticipated environmental impacts on operations and costs to remedy same, and other exploration or other risks

detailed herein and from time to time in the filings made by the companies with securities regulators. Readers are cautioned

that mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral exploration and

development of mines is an inherently risky business. Accordingly, the actual events may differ materially from those projected

in the forward-looking statements. For more information on Group Ten and the risks and challenges of their businesses,

investors should review their annual filings that are available at www.sedar.com.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.