Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PGDC.V ·

HUNT Mining Provides an Update ON Concentrate Shipments from Martha Project - 2018 Year to Date

Mine Development & Operations

HUNT MINING PROVIDES AN UPDATE ON CONCENTRATE SHIPMENTS FROM

MARTHA PROJECT - 2018 YEAR TO DATE

Liberty Lake, Washington, July 26, 2018 – Hunt Mining Corp. (the “ Corporation ” or “ Hunt ”) (TSX

VENTURE: “HMX” OTCQB: “HGLD”) is pleased to update concentrate shipments from th e Martha

Project located in Santa Cruz Province, Argentina. The total, contained troy ounces of silver and gold in

these three shipments was 87,533.49 and 206.98, respectively

Argentina Ag-Au 2018 Shipments (based on Alex Stewart outbound port assays)

Shipment Date of

Analysis

Weight

dmt

Ag g/t grade

& weighted

average

Au g/t

grade &

weighted

average

Silver

(Troy

Ounces)

Gold

(Troy

Ounces)

10 19 -Feb -2018 19.997 55,897 91.7 35,937.19 58.96

11 20 -Mar -2018 13.295 48 ,230 47.4 20,615.62 20.26

12 23 -Jul -2018 16.2 53 59,288 244.5 30,980.69 127.76

Summaries 49.527 54,952.02 129.9 4 87,533.49 206.98

1 troy ounce = 31.1035 grams

dmt = dry metric tonne

g/t = grams per tonne

Grades are based on independent assays taken at the Deseado port by Alex Stewart International, a glob al, independent, certified analytical

services company.

Ongoing activity at the Martha Project is being und ertaken without established mineral resources or

reserves and the Corporation has not established th e economic viability of the operations on the Marth a

Project. As a result, there is increased uncertaint y and economic risk of failure associated with thes e

production activities. Hunt is presently preparing an updated NI 43-101 Technical Report (“Technical

Report”) for the Martha property. It is anticipate d that this Technical Report will be published in Q 3

2018.

Donald J, Birak, an independent consulting geologis t and Registered Member of the Society for Mining,

Metallurgy and Exploration, and Qualified Person, a s defined by Canadian National Instrument 43-101,

has approved the scientific and technical and details of this press release.

Additional information on the Martha Project and ot her Santa Cruz, Argentina projects can be viewed on

the Company website at: www.huntmining.com .

About Hunt Mining

Hunt Mining Corp. has continued to develop its prop erties as an active and aggressive explorer in Sant a

Cruz since 2006. During that time, Hunt's wholly ow ned subsidiary, Cerro Cazador S.A., has completed

exploration activity including 62,000 meters of HQ core drilling, 416 line kilometers of Induced

Polarization geophysical surveys and more than 20,0 00 surface soil, sediment, channel, chip, and trenc h

samples, beyond the historical work previous to the same properties. Hunt also owns a 100% interest in

the Martha Mine, located in the Santa Cruz Province, Argentina.

For more information contact:

Dean Stuart

Investor Relations

T: (403) 617-7609

E: [email protected]

Bob Little

Chief Administration Officer

T: (509) 290-5659

E: [email protected]

Neither the TSX Venture nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture) accepts responsibility for

the adequacy or accuracy of this release.