Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PGDC.V ·

HUNT Mining Announces 8TH and 9 Th Concentrate Shipments from Martha Project

Mine Development & Operations

HUNT MINING ANNOUNCES 8TH and 9 TH CONCENTRATE SHIPMENTS FROM

MARTHA PROJECT

Liberty Lake, Washington, January 09, 2018 – Hunt Mining Corp. (the “ Corporation ” or “ Hunt”)

(TSX VENTURE: “HMX”) is pleased to announce concentrate shipments 8 and 9 from the Martha Mine

Project (“Martha Project”) located in Santa Cruz Province, Argentina. The combined total ounces of silver

were 79,099 troy ounces and 87.8 troy ounces for gold.

Argentina Summer 2017 Shipment

Shipment Date Weight

dmt

Ag g/t Au g/t Silver (Troy

Ounces)

Gold (Troy

Ounces)

Lot 8 11/12/17 8.9 95,018 87.1 27,204 24.9

Lot 9 12/14/17 19 .7 81,836 99.1 51,896 62.8

Total 28.6 86,479 96.0 79,099 87.8

Troy ounces consisting of 31.1035 grams

dmt = dry metric tonne

g/t = grams per tonne

Grades are based on independent assays taken at the port by Alex Stewart International, Argentina S.A. , Rodriguez Pena 1140, Luzuriaga,

Maipu, Mendoza, Argentina

While continuing to pursue mining the remnants of p redecessors’ exploitation activities at Martha, Hun t

is also evaluating the metallurgy of the gold and s ilver veins on its La Josefina property for optimum

flotation processing and investing substantially in the modification of the Martha mill to best

accommodate this new metallurgy.

Ongoing production at the Martha Project is being u ndertaken without established mineral resources or

reserves and the Corporation has not established th e economic viability of the operations on the Marth a

Project. As a result, there is increased uncertai nty and economic risks of failure associated with t hese

production activities.

Klaus Triebel, Hunt Mining's director of project de velopment, is the qualified person under National

Instrument 43-101 who has approved the technical and scientific aspects of this press release.

Additional information on the Martha Project and other Santa Cruz, Argentina projects can be viewed on

the Company website at: www.huntmining.com .

About Hunt Mining

Hunt Mining Corp. has continued to develop its prop erties as an active and aggressive explorer in Sant a

Cruz since 2006, entering into production of silver and gold at the Mina Martha property in January 2017.

Since 2006, Hunt's wholly owned subsidiary, Cerro C azador S.A., has completed exploration activity

including 62,000 meters of HQ core drilling, 416 li ne kilometers of Induced Polarization geophysical

surveys and more than 20,000 surface soil, sediment , channel, chip, and trench samples, beyond the

historical work previous to the same properties. Hu nt also owns a 100% interest in the Martha property ,

which includes the Martha Project, also located in the Santa Cruz Province of Argentina.

For more information contact:

Dean Stuart

Investor Relations

T: (403) 617-7609

E: [email protected]

Bob Little

Chief Administration Officer

T: (509) 290-5659

E: [email protected]

Neither the TSX Venture nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture) accepts responsibility for

the adequacy or accuracy of this release.