Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PEX.V ·

Pacific Ridge Plans 7,000 Metre Drill Program at Kliyul Copper-Gold Project

Exploration Programs

Pacific Ridge Plans 7,000 Metre Drill Program

at Kliyul Copper-Gold Project

Vancouver, British Columbia--(Newsfile Corp. - May 25, 2023) - Pacific Ridge Exploration Ltd. (TSXV:

PEX) (OTCQB: PEXZF) ("Pacific Ridge" or the "Company") is pleased to announce the Company's

2023 exploration plans for its 100% owned Kliyul copper-gold porphyry project ("Kliyul"), located in the

prolific Quesnel Trough in northcentral British Columbia (see Figure 1). The exploration program will

have two main objectives, 1) to expand the size of the Kliyul Main Zone ("KMZ") mineralized body to the

southeast and into neighbouring fault blocks (see Figure 2), and, 2)

testing several high priority targets

that occur along the Divide Lake Fault Trend, a highly-prospective 6-km-long alteration and

mineralization corridor (see Figure 3).

"I have high expectations for this year's drill program at Kliyul," said Blaine Monaghan, President & CEO

of Pacific Ridge. "Our technical team, Executive Chairman Dr. Gerry Carlson, Vice President of

Exploration Danette Schwab, and Chief Geologist Paul Jago, have done a fantastic job further

developing our knowledge and understanding of Kliyul, which will be the key to unlocking its tremendous

potential. I believe that the results from this year's drill program will be an inflection point for the

Company."

Pacific Ridge will utilize two diamond drill rigs and plans to drill a minimum of 7,000 m expanding the

size of the KMZ mineralized body and testing other targets. The program is fully funded, budgeted at

$4.6 million, and the Company expects drilling to be underway by the end of June.

Figure 1:

Location of Kliyul

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5460/167413_d9e9b4ef840c7af7_001full.jpg

Figure 2:

Plan View of KMZ, Kliyul West, Kliyul North and East Wedge with magnetic vector inversion

(MVI) amplitude magnetics

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5460/167413_6a345223c4ca58e0_002full.jpg

Figure 3:

Other targets at Kliyul: Ginger, Parish Hill, Bap Ridge, and M39

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5460/167413_d9e9b4ef840c7af7_003full.jpg

Recap of the 2022 Exploration Program at Kliyul

Pacific Ridge's 2022 exploration program consisted of diamond drilling (7,014.7 m in 12 drill holes),

Induced Polarization (IP) survey (27 line-km), high-resolution heli-borne magnetic and radiometric survey

(423 line-km), MVI modelling of aeromagnetic survey results, LiDAR survey (257.5 line-km), porphyry

footprints geochemical modelling, geological mapping and surface sampling (rock), and continued

baseline water sampling.

Key accomplishments of the 2022 exploration program include the following:

The 2022 drilling campaign materially increased the size of the KMZ mineralized body to

approximately 600 m (E-W) x 350 m (N-S) x 600 m vertical depth from approximately 350 m (E-W)

x 150 m (N-S) x 500 m vertical depth;

Drilling confirmed that the KMZ is not bounded by faults on any side and mineralization remains

open in every direction and at depth;

Drilling confirmed the existence of the modelled NW-striking Lui Fault which separates KMZ block

from Kliyul West block and confirmed that the WSW-striking Valley Fault zone has a Late Triassic

phase related to mineralization and veining;

Broad step-outs to the west and east along the Valley Fault corridor confirmed the system centred

at KMZ extends for over 1.2 km along this trend before reaching the system edge, and that

mineralization is structurally controlled within the Valley Fault zone;

Drilling confirmed that neighbouring fault blocks (Kliyul West, Kliyul North, East Wedge) to the KMZ

block have chlorite-sericite alteration and associated mineralization suggesting these blocks are

downthrown several 100 m relative to the central KMZ block, and that these blocks have good

preservation potential for different segments of a larger porphyry deposit;

Drilling in the Kliyul North zone is providing new information on deposit scale geology and attitude

of geological features, including dyke and vein orientations, providing key marker units in

geological modelling which will aid in resolving if the porphyry system has been tilted post-mineral;

and

Drilling in Kliyul West has provided a vector to distinctively higher Cu:Au ratio in mineralization

which increases to 1.5 in Kliyul West versus 0.25-0.50 in the KMZ, and porphyry footprints

modelling has suggested a porphyry core to the west or southwest of KMZ.

See Table 1 for 2021 and 2022 drilling highlights.

2023 Drill Hole Planning

The planned 2023 drilling program at Kliyul will total 7,000 m in at least 12 drill holes.

KMZ Drill Holes

A minimum of seven drill holes (over 4,000 m) are planned to expand the size of the KMZ mineralized

body into neighbouring fault blocks Kliyul West, Kliyul North, and East Wedge (Figure 2).

At least three drill holes will be collared within KMZ, considered to be a high-standing block, and

drilled into neighbouring downthrown fault blocks at depth, allowing for continued infill and

expansion of KMZ block mineralization (currently about 400 m x 200 m and 450 m depth at 0.40%

CuEq), which remains open to the east and southeast within the KMZ block.

In Kliyul North, drilling will test a deep MVI (Induced) magnetic high anomaly below 400 m depth,

with similar signature as KMZ, and with coincident high resistivity and chargeability to 400 m

depth. Drilling will be in areas without any historical drilling below 150 m vertical depth.

Additionally, drilling will test for a northern extension of mineralization intersected in KLI-22-046

following a moderately south-dipping coincident magnetic-resistivity-chargeability high geophysical

feature north of Valley Fault that is roughly 600 m x 300 m and 150 m in thickness.

In Kliyul West, drilling will test for continuation of high Cu:Au ratio mineralization intersected in KLI-

22-043 to the southeast and below 400 m vertical depth within the deep magnetic high (MVI

Induced) anomaly. Drilling will step out 100 m to 350 m southeast of KLI-22-043 and KLI-22-050

along the Lui Fault corridor.

In East Wedge/Kliyul East, drilling will test for an extension of mineralization intersected in KLI-22-

049 within a coincident magnetic-resistivity-chargeability high geophysical signature below 400 m

depth.

Other targets

A minimum of four drill holes (over 2,300 m) is planned to test four satellite target areas of interest along

the prospective 6-km-long Divide Lake Fault trend from the Ginger target in the northwest to the M-39

target in the southeast (Figure 4). This northwest trending corridor includes KMZ where it intersects the

ENE-trending Valley Fault zone.

At the Ginger target area, drilling will test a coincident MVI Induced magnetic high and

chargeability high feature to over 500 m vertical depth. The 2022 IP survey chargeability results

suggest there may be a NE-tilted porphyry system underlying the western side of Ginger cirque

where magnetite, biotite and sericite altered volcaniclastic rocks were mapped on surface in 2022,

and where historical rock sampling returned >500 ppm copper.

A new target area called Ginger South lies 800 m south of Ginger and along the ENE-trending

Valley Fault corridor, 1.3 km west of KMZ, where it intersects the NW-trending Parish Hill fault.

Drilling will test a coincident RMI aeromagnetic high (150 m x 160 m), chargeability high, Cu-in-soil

(>500 ppm) anomaly near a potentially important lithological contact in the volcaniclastic

stratigraphy. Resistivity data suggests the target is at the inflection point of a syncline-anticline fold

pair.

The Parish Hill skarn target is located where a Cu-sulfide-mineralized magnetite garnet skarn

outcrop was mapped in 2021 proximal to the Lui Fault and the above-mentioned lithological

contact. MVI (Induced) modelling suggests there is a moderately west-dipping 200 m x 150 m pipe

shaped magnetic high feature that comes to surface in this area and expands into a large

magnetic anomaly starting at 300 m depth with coincident resistivity high signature. Chargeability

intensifies with depth. The target area is about 650 m southeast of planned Kliyul West drilling

along the Lui Fault corridor.

The M-39 target area underlies a 450 m x 400 m RMI aeromagnetic high anomaly. Results from

the 2022 IP survey indicate there is a large chargeability high feature (600 m x 500 m x 250 m)

starting at about 400-500 m depth that has a steeply dipping pipe-shaped arm (150 m x 200 m)

that approaches surface on its western side at the contact with the Kliyul Creek intrusive complex.

A flat-lying resistivity high feature at 200 m depth may represent a lithocap above the main

chargeability feature. Drilling will test the chargeability arm and continue to depth into the larger

anomaly.

Figure 4:

Target Zone Locations at Kliyul with RMI Aeromagnetics

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/5460/167413_d9e9b4ef840c7af7_004full.jpg

About Kliyul

Owned 100% by Pacific Ridge, Kliyul is over 60 km

2

in size and is located in the prolific Quesnel Trough

close to existing infrastructure. Kliyul comprises nine porphyry copper-gold targets along two main

trends: the 1.5 km-long east-northeast Valley Fault Trend, which includes its five fault-defined target

areas (Kliyul West, KMZ, Kliyul North, East Wedge, and Kliyul East); and the 6-km-long northwest-

trending Divide Lake Fault Trend which includes Ginger, Parish Hill, Bap Ridge, and M-39 target areas.

Since 2020, Pacific Ridge has spent over $7.5M advancing Kliyul, including 8,557 m of drilling in 15

holes as well as geological, geochemical and geophysical surveys. Based on the exploration results to

date, the Company believes that there is excellent potential to define a significant porphyry copper-gold

system with multiple centres. Drilling at KMZ to date has defined a mineralized body measuring

approximately 600 m by 350 m, and to a depth of 600 m; and geophysical data, including recent

magnetic and IP surveys, suggest that this body can be expanded significantly.

Table 1:

2021 and 2022 Kliyul Drill Highlights

Hole

From(m)

To(m)

Width(m)

Cu(%)

Au(g/t)

Ag(g/t)

CuEq(%)*

AuEq(g/t)**

KLI-21-036

12.0

449.0

437.0

0.22

0.60

1.62

0.68

0.93

Includes

12.0

65.0

53.0

0.22

0.83

1.52

0.84

1.15

And

12.0

33.0

21.0

0.34

1.30

2.48

1.31

1.80

And

47.0

65.0

18.0

0.22

0.89

1.24

0.88

1.21

Includes

143.3

435.0

291.7

0.28

0.74

2.04

0.84

1.15

And

294.0

435.0

141.0

0.36

1.11

2.76

1.19

1.64

KLI21-037

12.3

579.0

566.7

0.20

0.44

1.39

0.53

0.73

Includes

12.3

329.0

316.7

0.30

0.70

2.17

0.83

1.14

And

62.0

73.0

11.0

0.42

1.22

4.48

1.35

1.85

And

90.0

122.0

32.0

0.52

0.88

2.48

1.18

1.62

And

146.0

161.0

15.0

0.39

1.19

2.86

1.29

1.77

Includes

238.8

288.1

49.4

0.66

1.50

4.83

1.79

2.46

And

243.9

268.0

24.1

1.09

2.21

7.92

2.77

3.80

KLI21-038

9.0

516.0

507.0

0.15

0.39

1.51

0.45

0.62

Includes

9.0

351.0

342.0

0.17

0.50

2.00

0.56

0.77

And

9.0

43.0

34.0

0.27

0.72

2.84

0.82

1.13

And

9.0

63.0

54.0

0.21

0.56

2.27

0.64

0.88

And

108.0

136.0

28.0

0.21

0.60

9.01

0.72

0.99

And

153.1

186.0

32.9

0.24

0.78

1.68

0.82

1.12

And

226.0

351.0

125.0

0.23

0.69

1.57

0.74

1.02

And

261.0

349.0

88.0

0.26

0.84

1.82

0.89

1.22

KLI-22-039

9.3

252.0

242.7

0.15

0.17

1.05

0.29

0.39

Includes

22.0

43.4

21.4

0.38

0.48

3.96

0.76

1.04

And

192.0

229.0

37.0

0.20

0.27

0.67

0.40

0.55

KLI-22-040

23.0

550.8

527.8

0.19

0.30

1.35

0.42

0.58

Includes

89.0

355.5

266.5

0.23

0.48

1.94

0.60

0.82

And

170.0

268.0

98.0

0.33

0.90

3.42

1.01

1.39

And

210.0

253.0

43.0

0.50

1.11

2.72

1.33

1.83

And

306.6

340.0

33.4

0.09

0.56

0.77

0.50

0.69

KLI-22-041

12.0

600.0

588.0

0.12

0.39

0.90

0.41

0.56

Includes

106.0

442.0

336.0

0.15

0.62

1.04

0.61

0.84

And

164.0

442.0

278.0

0.14

0.72

0.95

0.67

0.92

And

164.0

200.0

36.0

0.30

0.70

1.61

0.82

1.13

And

280.0

323.0

43.0

0.09

1.59

1.34

1.26

1.73

And

337.0

398.0

61.0

0.25

1.15

1.12

1.09

1.50

And

420.0

442.0

22.0

0.10

0.63

1.01

0.56

0.77

KLI-22-042

9.0

702.0

693.0

0.11

0.20

0.81

0.26

0.36

Includes

136.0

474.4

338.4

0.12

0.30

0.98

0.35

0.48

And

136.0

306.0

170.0

0.18

0.35

1.34

0.44

0.61

And

438.0

474.4

36.4

0.14

0.62

0.99

0.60

0.82

KLI-22-043

9.0

516.0

507.0

0.17

0.19

0.82

0.32

0.44

Includes

147.0

261.0

114.0

0.28

0.36

1.52

0.55

0.76

And

165.0

229.0

64.0

0.31

0.47

1.82

0.67

0.92

Includes

463.0

501.0

38.0

0.45

0.26

0.83

0.65

0.89

KLI-22-044

11.6

651.0

639.4

0.11

0.23

0.84

0.29

0.39

Includes

81.5

432.2

350.7

0.13

0.32

0.98

0.38

0.52

And

134.0

352.0

218.0

0.15

0.37

1.15

0.43

0.59

And

136.0

194.0

58.0

0.25

0.38

1.73

0.54

0.74

And

237.3

336.7

99.4

0.13

0.47

1.01

0.48

0.66

KLI-22-045

112.0

184.0

72.0

0.21

0.59

1.96

0.66

0.91

Includes

141.0

184.0

43.0

0.17

0.57

2.39

0.61

0.83

And

330.0

367.0

37.0

0.15

0.34

0.89

0.40

0.55

KLI-22-046

273.0

442.0

169.0

0.20

0.46

1.65

0.55

0.75

Includes

313.0

336.2

23.2

0.15

0.49

1.36

0.51

0.71

And

371.0

430.0

59.0

0.24

0.87

2.29

0.89

1.22

KLI-22-047

332.0

385.0

53.0

0.10

0.11

0.72

0.18

0.25

KLI-22-048a

352.0

362.0

10.0

0.01

0.59

1.81

0.46

0.63

KLI-22-049

144.0

484.0

340.0

0.15

0.20

0.80

0.30

0.41

Includes

250.0

316.0

66.0

0.23

0.24

0.90

0.41

0.57

And

456.0

484.0

28.0

0.27

0.44

2.87

0.61

0.84

KLI-22-050

58.0

584.0

526.0

0.20

0.43

1.03

0.52

0.71

Hole

From(m)

To(m)

Width(m)

Cu(%)

Au(g/t)

Ag(g/t)

CuEq(%)*

AuEq(g/t)**

Includes

115.0

443.0

328.0

0.25

0.57

1.25

0.67

0.92

And

254.0

308.0

54.0

0.40

1.03

2.42

1.17

1.60

And

354.0

443.0

89.0

0.28

1.05

1.20

1.06

1.45

And

514.0

562.0

48.0

0.19

0.41

1.15

0.49

0.68

Hole

From(m)

To(m)

Width(m)

Cu(%)

Au(g/t)

Ag(g/t)

CuEq(%)*

AuEq(g/t)**

*CuEq = ((Cu%) x $Cu x 22.0462) + (Au(g/t) x $Au x 0.032151) + (Ag(g/t) x $Ag X 0.032151)) / ($Cu x 22.0462)

**AuEq = ((Cu%) x $Cu x 22.0462) + (Au(g/t) x $Au x 0.032151)) + (Ag(g/t) x $Ag X 0.032151)) / ($Au x 0.032151)

Commodity prices: $Cu = US$3.50/lb, $Au = US$1,750/oz., and Ag = US$20.00/oz.

Factors: 22.0462 = Cu% to lbs per tonne, 0.032151 = Au g/t to troy oz per tonne, and 0.032151 = Ag g/t to troy oz per tonne.

Recovery is assumed to be 100% - there has been no metallurgical testing on Kliyul mineralization

About Pacific Ridge

Our goal is to become British Columbia's leading copper-gold exploration company. Pacific Ridge's

flagship project is its 100% owned Kliyul copper-gold project, located in the Quesnel Trough close to

existing infrastructure. In addition to Kliyul, the Company's project portfolio includes the RDP copper-gold

project (optioned to Antofagasta Minerals S.A.), the Chuchi copper-gold project, the Onjo copper-gold

project, and the Redton copper-gold project, all located in British Columbia. Pacific Ridge would like to

acknowledge that its B.C. projects are located in the traditional, ancestral and unceded territories of the

Gitxsan Nation, McLeod Lake Indian Band, Nak'azdli Whut'en, Takla Nation, and Tsay Keh Dene Nation.

On behalf of the Board of Directors,

"Blaine Monaghan"

Blaine Monaghan

President & CEO

Pacific Ridge Exploration Ltd.

Corporate Contact:

Blaine Monaghan

President & CEO

Tel: (604) 687-4951

www.pacificridgeexploration.com

https://www.linkedin.com/company/pacific-ridge-exploration-ltd-pex-

https://twitter.com/PacRidge_PEX

Investor Contact:

G2 Consultants Corp.

Telephone: +1 778-678-9050

Email:

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

The technical information contained within this News Release has been reviewed and approved by

Gerald G. Carlson, Ph.D., P.Eng., Executive Chairman of Pacific Ridge and Qualified Person as

defined by National Instrument 43-101 policy.

Forward-Looking Information:

This release includes certain statements that may be deemed

"forward-looking statements". All statements in this release, other than statements of historical facts,

which address exploration drilling and other activities and events or developments that Pacific Ridge

Exploration Ltd. ("Pacific Ridge") expects to occur, are forward-looking statements. Forward-looking

statements in this news release include the planned 7,000 m drill program at Kliyul budgeted at

$4.6M, the potential for the KMZ mineralized body to continue growing, and the potential to define a

significant porphyry copper-gold system with multiple centres. Although Pacific Ridge believes the

expectations expressed in such forward-looking statements are based on reasonable assumptions,

such statements are not guarantees of future performance and actual results or developments may

differ materially from those forward-looking statements. Factors that could cause actual results to differ

materially from those in forward-looking statements include market prices, exploration successes, and

continued availability of capital and financing and general economic, market or business conditions.

These statements are based on a number of assumptions including, among other things,

assumptions regarding general business and economic conditions, that one of the options will be

exercised, the ability of Pacific Ridge and other parties to satisfy stock exchange and other regulatory

requirements in a timely manner, the availability of financing for Pacific Ridge's proposed programs

on reasonable terms, and the ability of third party service providers to deliver services in a timely

manner. Investors are cautioned that any such statements are not guarantees of future performance

and actual results or developments may differ materially from those projected in the forward-looking

statements. Pacific Ridge does not assume any obligation to update or revise its forward-looking

statements, whether as a result of new information, future events or otherwise, except as required by

applicable law.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/167413