Pacific Ridge Completes Geophysical Interpretation and 3-D Modeling on Its Kliyul Au-Cu Porphyry Project, BC
Pacific Ridge Completes Geophysical Interpretation and
3-D Modeling on Its Kliyul Au-Cu Porphyry Project, BC
Vancouver, British Columbia--(Newsfile Corp. - June 18, 2020) -
Pacific Ridge Exploration Ltd. (TSXV: PEX) ("Pacific Ridge" or
the "Company") reports that it has completed a reinterpretation of historical geophysical surveys, including several campaigns of
ground magnetics and induced polarization ("IP") surveys and an airborne magnetic survey completed by Geoscience BC over
its Kliyul Au-Cu porphyry prospect, north-central BC. This interpretation has been integrated with known surface geology,
alteration and mineralization as well as data from 19 drill holes to produce a 3-D target model. The geophysical interpretation
was completed by Platform Geoscience of Toronto. The Kliyul property is located 200 km north of Smithers and 70 km south of
the Kemess mine, within 5 km of the Omineca Mine Road (Figure 1).
The geophysical study demonstrated that mineralization is associated with a wide range of chargeabilities and resistivities, but it
is typically associated with the transition between moderate to low chargeabilities and moderate resistivity. Most of the
mineralized intersections are either within or adjacent to areas of magnetic highs, although the correlation between Au-Cu and
magnetite does not always hold. In some mineralized intervals alteration overprinting has destroyed hydrothermal magnetite, and
in others, magnetite is not part of the mineral assemblage or is weak. The mineralization footprint has the potential to be
expanded beyond the magnetic anomalies. The study has shown that the main Kliyul zone is open laterally, particularly to the
north and to depth. It has also shown the potential for new discoveries, in particular at BAP Ridge, the M39 Zone and Ginger, all
of which demonstrate similar geophysical targets (see Figure 2).
The table below shows highlights from historical drilling at the main Kliyul Zone. Drill hole collar locations are shown in Figure 3
and an east-west section through the Kliyul zone is shown in Figure 4.
Hole
From
(m)
To
(m)
Width
(m)
Cu
(%)
Au
(gpt)
CuEQ
(%)
AuEQ
(gpt)
KL-5
10.8
68.3
57.5
0.32
0.99
1.36
1.28
KL-6*
30.1
78.9
48.8
0.31
1.33
1.71
1.61
KL-7
20.0
71.0
51.0
0.17
1.19
1.42
1.34
KL-93-4
46.0
102.0
56.0
0.34
0.89
1.28
1.20
KL-93-5
16.0
76.0
60.0
0.26
1.34
1.67
1.57
KL-06-30
22.0
239.8
217.8
0.23
0.52
0.78
0.73
KL-15-34
123.0
368.0
245.0
0.18
0.53
0.74
0.69
KL-15-34
280.6
301
20.4
0.39
2.55
3.08
2.89
KL-15-33
32.5
194.9
162.4
0.20
0.26
0.47
0.44
*interval to end of hole
CuEQ = ((Cu(%) x CuP x 22.0642) + (Au(gpt) x AuP x 0.032151)) / (CuP x 22.0642)
AuEQ = ((Cu(%) x CuP x 22.0642) + (Au(gpt) x AuP x 0.032151)) / (AuP x 0.032515)
CuP = US$2.35/lb. AuP = US$1,700/oz.
The planned 2020 field program will include additional IP surveying, to extend the depth of investigation at the Kliyul Zone from
250 m to over 400 m and to extend the survey coverage to the south over BAP Ridge and the M39 Zone. The purpose of this
program is to refine targets for a planned 2021 drill campaign. Permit applications have been submitted for this work.
Figure 1. Kliyul project location
To view an enhanced version of Figure 1, please visit:
https://orders.newsfilecorp.com/files/5460/58103_acbebf2574d89825_001full.jpg
Figure 2. Kliyul project magnetization anomaly distribution indicating main target areas
To view an enhanced version of Figure 2, please visit:
https://orders.newsfilecorp.com/files/5460/58103_acbebf2574d89825_002full.jpg
Figure 3. Kliyul Zone: Chargeability plan map and historic drill collars
To view an enhanced version of Figure 3, please visit:
https://orders.newsfilecorp.com/files/5460/58103_acbebf2574d89825_003full.jpg
Figure 4. Kliyul Zone: E-W cross (A-A' - Figure 3) section with AuEQ values on chargeability
To view an enhanced version of Figure 4, please visit:
https://orders.newsfilecorp.com/files/5460/58103_acbebf2574d89825_004full.jpg
Pacific Ridge has the right to earn a 51% interest in the Kliyul and Redton properties from Aurico Metals Inc. by making cash
payments totaling $100,000, issuing 2.0 million shares and spending $3.5 million on exploration by December 31, 2023. The
Company then has the right to increase its interest in the Properties to 75% by making additional payments totaling $60,000,
issuing 1.5 million shares and completing an additional $3.5 million in exploration by December 31, 2025.
About Pacific Ridge
Pacific Ridge is a well-financed junior exploration company that has assembled a portfolio of highly prospective gold and base
metal projects located in the Yukon and British Columbia, where its board and management team have a track record of
success. Its holdings include the new Kliyul and Redton copper-gold porphyry projects in north-central British Columbia, the
Mariposa, Eureka Dome and Gold Cap gold exploration projects in the Klondike-White Gold District, Fyre Lake Cu-Au-Co
massive sulphide deposit in the Finlayson District and the Spius Cu-Mo porphyry prospect in southern British Columbia.
On behalf of the Board of Directors,
"Gerald G. Carlson"
Gerald G. Carlson
President & CEO
Pacific Ridge Exploration Ltd.
For further information, contact:
Pacific Ridge Exploration Ltd.
Gerald G. Carlson
President & CEO
Tel: (604) 687-4951
www.pacificridgeexploration.com
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
The technical information contained within this News Release has been reviewed and approved by Gerald G. Carlson, Ph.D.,
P.Eng., President and CEO of Pacific Ridge and Qualified Person as defined by National Instrument 43-101 policy.
Forward-Looking Information:
This release includes certain statements that may be deemed "forward-looking statements".
All statements in this release, other than statements of historical facts, that address exploration drilling and other activities
and events or developments that Pacific Ridge Exploration Ltd. ("Pacific Ridge") expects to occur, are forward-looking
statements. Forward-looking statements in this news release include statements regarding the exercise of the options and
future exploration plans and expenditures. Although Pacific Ridge believes the expectations expressed in such forward-
looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and
actual results or developments may differ materially from those forward-looking statements. Factors that could cause actual
results to differ materially from those in forward looking statements include market prices, exploration successes, and
continued availability of capital and financing and general economic, market or business conditions. These statements are
based on a number of assumptions including, among other things, assumptions regarding general business and economic
conditions, that one of the options will be exercised, the ability of Pacific Ridge and other parties to satisfy stock exchange
and other regulatory requirements in a timely manner, the availability of financing for Pacific Ridge's proposed programs on
reasonable terms, and the ability of third party service providers to deliver services in a timely manner. Investors are
cautioned that any such statements are not guarantees of future performance and actual results or developments may differ
materially from those projected in the forward-looking statements. Pacific Ridge does not assume any obligation to update or
revise its forward-looking statements, whether as a result of new information, future events or otherwise, except as required by
applicable law.
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/58103