Chakana Reports 113m of 0.90 g/t Gold, 0.92% Copper and 72.8 g/t Silver (2.13% Cu-Eq) in Huancarama at Soledad, Peru Soledad Project Highlights Include: 12 new resource definition holes at Huancarama reported, totalling 2,974.85m

Drill Results

Chakana Reports 113m of 0.90 g/t Gold, 0.92%

Copper and 72.8 g/t Silver (2.13% Cu-Eq) in

Huancarama at Soledad, Peru

Soledad Project Highlights Include:

12 new resource definition holes at Huancarama reported, totalling 2,974.85m

Additional resource definition drill results pending for Breccia Pipe 5 "(Bx 5)" and

Huancarama

Gradient-array induced-polarization (IP) geophysical survey completed over entire

mineral system

Off-set IP surveys underway over high priority targets defined by gradient array and other

data sets

Vancouver, British Columbia--(Newsfile Corp. - November 1, 2021) -

Chakana Copper Corp. (TSXV:

PERU) (OTCQB: CHKKF) (FSE: 1ZX)

(the

"

Company

"

or

"

Chakana

"), is pleased to provide results

from twelve resource definition holes drilled in Huancarama totaling 2,974.85m at the Soledad project,

Ancash, Peru (see table below). The resource drilling is part of a fully funded 26,000m exploration and

resource drilling program planned for 2021 (Fig. 1).

These results compliment previous results from

Huancarama and will increase confidence in the initial resource estimate covering six breccia pipes,

which is anticipated to be completed by the end of 2021.

"Results for the resource definition drilling at Huancarama have been outstanding thus far. This is a

large breccia pipe that is part of a much larger breccia complex. The resource drilling has focused on

the east side of the breccia complex where two breccia pipes coalesce into one larger pipe with

excellent grades for copper, gold, and silver. We have additional resource definition drill results to

release for Bx 5 and Huancarama as we close in on the first resource ever for this new discovery,"

stated President and CEO David Kelley.

Drill Results

Huancarama (Resource Definition)

DDH #

From

-

To (m)

Core Length

(m)

Au

g/t

Ag

g/t

Cu %

Cu-eq

%*

Au-eq g/t*

SDH21-228

89.75

141.00

51.25

0.25

34.4

0.27

0.73

1.11

and

170.00

222.00

52.00

0.40

50.6

1.14

1.83

2.81

SDH21-230

90.00

93.25

3.25

1.53

285.2

5.75

9.19

14.06

and

125.00

200.00

75.00

0.56

44.3

0.34

1.08

1.66

and

219.00

221.00

2.00

2.94

132.6

1.07

4.13

6.31

SDH21-232

114.20

242.00

127.80

0.55

65.1

0.48

1.40

2.14

SDH21-237

123.00

236.00

113.00

0.90

72.8

0.92

2.13

3.26

SDH21-242

146.00

210.00

64.00

0.50

41.3

0.63

1.31

2.00

SDH21-245

152.00

217.00

65.00

0.31

40.7

0.70

1.25

1.91

SDH21-246

153.00

218.00

65.00

0.29

27.4

0.58

1.00

1.54

SDH21-247

170.35

199.00

28.65

0.45

68.3

0.86

1.74

2.66

and

283.00

323.15

40.15

0.22

30.0

0.67

1.07

1.64

SDH21-248

146.00

184.00

38.00

0.77

56.2

1.03

2.01

3.08

and

229.15

241.00

11.85

1.06

37.9

0.10

1.71

SDH21-249

53.60

128.55

74.95

0.32

82.4

0.42

1.33

2.04

SDH21-250

45.00

133.00

88.00

0.31

66.5

0.86

1.63

2.50

SDH21-251

85.00

221.00

136.00

0.29

26.6

0.30

0.72

1.10

* Cu_eq and Au_eq values were calculated using copper, gold, and silver. Metal prices utilized for the calculations are Cu - US$2.90/lb, Au -

US$1,300/oz, and Ag - US$17/oz. No adjustments were made for recovery as the project is an early-stage exploration project and metallurgical data

to allow for estimation of recoveries are not yet available. The formulas utilized to calculate equivalent values are Cu-eq (%) = Cu% + (Au g/t *

0.6556) + (Ag g/t * 0.00857) and Au-eq (g/t) = Au g/t + (Cu% * 1.5296) + (Ag g/t * 0.01307).

Huancarama

The Huancarama breccia pipe is in the central part of the project at an elevation of 3,950m and is one of

six breccia pipes that will be included in our initial resource estimate (Fig. 1). The breccia pipe is part of

a breccia complex with six outcropping breccias over a lateral distance of 200m east-west. Two of the

breccias, separated by 50m at surface, coalesce at depth, forming a large breccia pipe approximately

100m x 60m in plan. Breccia has been intercepted to a depth of 492m below surface and remains open.

Drill holes described in this release were drilled from four different platforms and were designed to

confirm the geometry and continuity of mineralization within the breccia pipe (Figs. 2 and 3). All holes

intersected significant mineralization (see Figure 4 for select core photos of the mineralization). Thirteen

additional holes have been drilled as part of the resource definition program; results for these holes are

pending.

2021 Resource and Exploration Drill Program

A total of 23,947m (incorrectly reported in previous release) of drilling has been completed in 2021. The

objectives of this drill program are to complete resource definition drilling on six initial breccia pipes to

an approximate depth of 300m and test several new exploration targets. Breccia pipes that will be

included in the initial resource estimate are: Bx 1, Bx 5, Bx 6, Paloma East, Paloma West, and

Huancarama (Fig. 1). Additional resource definition drill results for Bx 5 and Huancarama are pending.

During 2021 our drilling was focused on the north half of the project where drill permits are in place.

Permitting for the south half of the project is well advanced. The southern half of the property hosts

several outcropping mineralized tourmaline breccia pipes and has been recently covered by the

Company's ongoing geophysical program.

Numerous targets exist, none of which have been drilled

previously.

Geophysical Surveys

Gradient-array induced-polarization (IP) surveys have been completed over the entire 12km

2

footprint of

the Soledad mineral system.

Off-set IP surveys are now in-progress covering high priority target areas.

This work complements the extensive exploration database that supports our current inventory of 110

exploration targets. This new information identifies both new targets and prioritizes existing targets that

will be tested when the exploration drilling programs resume.

About Chakana Copper

Chakana Copper Corp is a Canadian-based minerals exploration company that is currently advancing

the Soledad Project located in the Ancash region of Peru, a highly favorable mining jurisdiction with

supportive communities. The Soledad Project is notable for the high-grade copper-gold-silver

mineralization that is hosted in tourmaline breccia pipes. A total of 60,854 metres in 261 diamond core

holes for exploration and resource definition drilling have been completed since 2017, testing 16 of 110

total exploration targets, confirming that Soledad is a large, well-endowed mineral system with strong

exploration upside.

Chakana's investors are uniquely positioned as the Soledad Project provides

exposure to base and precious metals. For more information on the Soledad project, please visit the

website at

www.chakanacopper.com

.

Sampling and Analytical Procedures

Chakana follows rigorous sampling and analytical protocols that meet or exceed industry standards.

Core samples are stored in a secured area until transport in batches to the ALS facility in Callao, Lima,

Peru.

Sample batches include certified reference materials, blank, and duplicate samples that are then

processed under the control of ALS. All samples are analyzed using the ME-MS41 (ICP technique that

provides a comprehensive multi-element overview of the rock geochemistry), while gold is analyzed by

AA24 and GRA22 when values exceed 10 g/t by AA24.

Over limit silver, copper, lead and zinc are

analyzed using the OG-46 procedure. Soil samples are analyzed by 4-acid (ME-MS61) and for gold by

Fire Assay on a 30g sample (Au-ICP21).

Results of previous drilling and additional information concerning the Project, including a technical report

prepared in accordance with National Instrument 43-101, are made available on Chakana's SEDAR

profile at www.sedar.com.

Qualified Person

David Kelley, an officer and a director of Chakana, and a Qualified Person as defined by NI 43-101,

reviewed and approved the technical information in this news release.

ON BEHALF OF THE BOARD

(signed) "

David Kelley

"

David Kelley

President and CEO

For further information contact:

Joanne Jobin, Investor Relations Officer

Phone:

647 964 0292

Email:

[email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Forward-looking Statement Advisory:

This release may contain forward-looking statements.

Forward-looking statements involve known and unknown risks, uncertainties, and other factors which

may cause the actual results, performance, or achievements of Chakana to be materially different

from any future results, performance, or achievements expressed or implied by the forward-looking

statements. Forward looking statements or information relates to, among other things, the

interpretation of the nature of the mineralization at the

Soledad copper-gold-silver

project (the

"Project"), the potential to expand the mineralization, and to develop and grow a resource within the

Project, the planning for further exploration work, the ability to de-risk the potential exploration targets,

and our belief in the potential for mineralization within unexplored parts of the Project. These forward-

looking statements are based on management's current expectations and beliefs but given the

uncertainties, assumptions and risks, readers are cautioned not to place undue reliance on such

forward- looking statements or information. The Company disclaims any obligation to update, or to

publicly announce, any such statements, events or developments except as required by law.

Figure 1 - View looking north showing outcropping breccia pipes and occurrences within the northern

Soledad cluster. Pipes that will be included in the initial resource are shown in green (Bx 1, Bx 5, Bx 6,

Paloma East, Paloma West, and Huancarama). Breccia pipes shown in yellow have had exploration

drilling completed. Other pipes/occurrences and targets defined by other exploration data remain to be

tested by drilling. Additional breccia pipes occur on the south half of the property and are not shown

here.

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/2172/101484_9a212c47c4cd39e6_001full.jpg

Figure 2 - Map showing drill holes reported in this release and modeled breccia pipes at Huancarama

(light red shape) based on all drill holes. Light gray contours are at 5m intervals. Blue rectangle in the

inset map shows the area of Figure 2 within the overall Soledad property.

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/2172/101484_9a212c47c4cd39e6_002full.jpg

Figure 3 - 3D sectional view of Huancarama looking northwest. Light red 3D shape shows breccia pipe

geometry based on all drill holes. Previous holes drilled shown in grey.

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/2172/101484_9a212c47c4cd39e6_003full.jpg

Figure 4 - Select core photos from Huancarama reported in this release: SDH21-228 (187.95m) semi-

massive chalcopyrite-pyrite replacement of tourmaline breccia; SDH21-228 (190.1m) chalcopyrite filling

open cavity in breccia; SDH21-228 (192.2m) chalcopyrite-tourmaline-cemented breccia; SDH21-230

(91.35m) massive chalcopyrite; SDH21-230 (193.35m) chalcopyrite-tourmaline-cemented breccia;

SDH21-232 (161.80m) chalcopyrite-pyrite replacement of clasts; SDH21-232 (279.55m) chalcopyrite-

tourmaline-cemented breccia; SDH21-237 (151.45m) chalcopyrite-tourmaline-cemented breccia and

sulfide clast replacement; SDH21-237 (152.8m) chalcopyrite-tourmaline-cemented breccia and sulfide

clast replacement; SDH21-242 (172.05m) semi-massive chalcopyrite-pyrite replacement breccia;

SDH21-242 (173.0m) chalcopyrite replacement of clasts in mosaic breccia; SDH21-245 (185.9m)

chalcopyrite-quartz cemented breccia; SDH21-245 (187.1m) chalcopyrite-tourmaline-cemented mosaic

breccia; SDH21-246 (127.5m) chalcopyrite-tourmaline-cemented chaotic shingle breccia; SDH21-247

(293.9m) chalcopyrite-quartz-siderite-sphalerite filling cavity in breccia; SDH21-247 (313.9m) mosaic

breccia with insipient granodiorite clast replacement by chalcopyrite; SDH21-250 (80.3m) chalcopyrite-

tourmaline-cemented mosaic breccia and partial sulfide clast replacement; SDH21-251 (162.05m)

mosaic breccia replaced by tourmaline-chalcopyrite. Core diameter is 6.35cm (HQ) in all instances.

To view an enhanced version of this graphic, please visit:

https://orders.newsfilecorp.com/files/2172/101484_9a212c47c4cd39e6_004full.jpg

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/101484