Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PERU.V ·

Chakana Copper Invites You to Visit Our Booth IN the Investors Exchange Core Shack at the Pdac Conference IN Toronto, and Re- Releases News from March 2, 2018 with New Video Included

Marketing Announcement

NEWS RELEASE

CHAKANA COPPER INVITES YOU TO VISIT OUR BOOTH IN THE INVESTORS

EXCHANGE CORE SHACK AT THE PDAC CONFERENCE IN TORONTO, AND RE-

RELEASES NEWS FROM MARCH 2, 2018 WITH NEW VIDEO INCLUDED

Vancouver, B.C., March 5, 2018 – Chakana Copper Corp. (TSX-V: PERU; OTC: CHKKF;

FWB: 1ZX) (the “Company” or “Chakana”) is pleased to invite you to visit us in the core

shack of the Investors Exchange at the PDAC Co nference in Toront o. Chakana’s management

team will be at the Company’s booth #3118 Tuesday, March 6 th from 10:00am to 5 :00pm and

Wednesday, March 7th from 9:00am to 12:00pm. We look forward to greeting our shareholders,

investors and conference attendees to take a deeper look at our core showcase from our Soledad

Project, Peru. Visit www.pdac.ca for details.

Chakana would also like to re-release news from March 2, 2018 and share Soledad project video

http://iresourcenetwork.com/companies/chakana-copper/.

Re-Release; Chakana Copper is pleased to announce assays from five additional step-out holes in

Breccia Pipe 1 (Bx 1) at its Soledad copper -gold-silver project in central Peru, optioned from

Condor Resources Inc. The Soledad project (the “Project”) is located 35 km south of the Pierina

mine in the prolific Miocene metallogenic belt of Peru. These results are a successful

continuation of the drilling program that was initiated August 16, 2017, with the results of the

first twenty-seven drill holes released previously (see: www.chakanacopper.com). This Phase 1

drilling program is ongoing with a total of 10,629m drilled to date out of an original planned

program of 16,660m and is ahead of schedule and under budget.

“One of our initial goals in this drill program was to increase the grade profile from previous

explorers by drilling across the pipes to thoroughly test the margin zones ”, said President and

CEO David Kelley. “The results in these last five holes from Bx 1 demonstrate the high -grade

nature of this pipe and the margin zone grades at the edge of the pipe. Three of the five holes

have very high-grade margin zones such as 10.1m of 2.53% Cu, 7.72 g/t Au, and 26.0 g/t Ag in

hole SDH18-044. H ole SDH18-046 has high-grade margin zones on both sides of the breccia

pipe with 8.0m of 3.33% Cu, 11.70 g/t Au, and 24.8 g/t Ag on the northeast margin, and 6m of

2.37% Cu, 3.12 g/t Au, and 139.9 g/t Ag on the southwest margin. These higher grades along the

margins may be due to a greater amount of open space between the fragments in the breccia

during pipe formation, and subsequent mineralization by a hydrothermal fluid. Also included in

these results are significantly longer high-grade intercepts across the pipe including 52.0 metres

with 1.48% Cu, 5.14 g/t Au, and 60.2 g/t Ag and 78.1 metres with 1.36% Cu, 1.37 g/t Au, and

87.2 g/t Ag.”

- 2 -

New mineralized intervals from Breccia Pipe 1 are:

DDH #

Az Dip From - To

(m)

Core

length

(m)

Au

g/t

Ag

g/t

Cu

%

Zn

%

Pb

%

Cu-

eq

%*

Au-

eq

g/t*

Note

SDH18-

044 233 -44 66.00 123.00 57.00 3.93 61.6 1.00 4.10 6.27

including 70.90 81.00 10.10 7.72 26.0 2.53 7.80 11.93 Margin

SDH18-

045 232 -51 78.00 153.00 75.00 1.07 92.7 1.21 2.70 4.13

SDH18-

046 225 -41 70.00 122.00 52.00 5.14 60.2 1.48 5.35 8.19

including 72.00 80.00 8.00 11.70 24.8 3.33 11.19 17.12 Margin

including 116.00 122.00 6.00 3.12 139.9 2.37 0.87 0.54 5.61 8.57 Margin

SDH18-

047 224 -50 79.00 157.10 78.10 1.37 87.2 1.36 3.00 4.59

including 147.00 156.25 9.25 0.84 81.2 3.24 4.48 6.86 Margin

SDH18-

048 220 -56 95.00 147.00 52.00 0.38 39.4 1.01 1.60 2.44

* Cu_eq and Au_eq values were calculated using copper, gold, and silver. Metal prices utilized for the calculations are Cu –

US$2.90/lb, Au – US$1,300/oz, and Ag – US$17/oz. No adjustments were made for recovery as the project is an early stage

exploration project and metallurgical data to allow for estimation of recoveries are not yet available. The formulas utilized to

calculate equivalent values are Cu_eq (%) = Cu% + (Au g/t * 0.6556) + (Ag g/t * 0.00857) and Au_eq (g/t) = Au g/t + (Cu% *

1.5296) + (Ag g/t * 0.01307). Assays for zinc and lead are not used in the metal equivalent calculations.

The true widths of the mineralized intervals reported in this release are difficult to ascertain and

additional drilling will be required to constrain the geometry of the mineralized zones.

Exploration Update

A total of 9 mineralized breccia pipes have been identified by mapping on the Project thus far.

The pipes form a cluster within an area of four-square kilometers and are spaced between 175m

to 625m apart with vertical relief between the pipes of over 500m.

The focus of the drilling program is to determine the economic potential of several of the quartz -

tourmaline-sulfide breccia pipes that crop out at surface. Phase 1 is directed toward pipes 1 and 5

(Bx 1 and Bx 5) . Phase 2 will be an expanded drill program proposed under a Semi -detailed

Environmental Impact Assessment permit (EIA -SD) that was submitted for review to the

Ministry of Energy and Mines on December 29, 2017. Phase 2 will allow for additional drill

platform locations and more drill holes to test several other pipes and targets identified on the

Project. Based on detailed mapping, Bx 1 has a surface diameter of 40m and Bx 5 of 50m.

Mineralization is open at depth in both pipes based on previous drilling. Current dri lling is

designed to determine the geometry (volume) and grade of the breccia hosted mineralization.

Tourmaline breccia pipes can have diameters that increase at depth, and often have higher grades

at the margins of the pipe, interpreted to result from hig her permeability of the breccia. Drilling

at the Project is designed to test this in each pipe from surface to 400m depth based on: 1)

- 3 -

drilling from a central platform at various azimuths and dip angles to penetrate the margin of the

breccia throughout its vertical extent; and 2) from platforms outside the pipe to drill across the

breccia body. The five holes from Bx 1 reported here were drilled from a step -out platform 80m

northeast of the breccia pipe. Mineralized intercepts will vary in length due to the shape of the

breccia body and the orientation of the drill hole (see Figure 2). For example, shallow holes

drilled near the perimeter of the pipe may have shorter in tercepts compared to steeper holes.

Nonetheless, all holes that intersect mineralized breccia are important for constraining the overall

shape and grade of the breccia body. Once a sufficient number of intercepts are obtained and

modelled, the overall geometry of the breccia body and the grade profile will become apparent.

Sampling and Analytical Procedures

Chakana follows rigorous sampling and analytical protocols that meet industry standards.

Samples for assay are stored in a secured area until transport in batches to the ALS facility in

Callao, Lima, Peru. Samples are processed under the control of ALS with the samples including

certified reference materials, a coarse and finely -crushed blank and duplicates samples. All

samples are analyzed using the ME -MS41 procedure in order to obtain a comprehensive multi -

element overview of the ge ochemistry. Gold is analyzed by ME -MS41 (considered to be least

reliable), AA24 (higher precision) and GRA22 when values exceed 10 g/t. Over limit s ilver,

copper, lead and zinc is analyzed using the OG-46 procedures.

Additional information concerning the Project is available in a technical report prepared in

accordance with National Instrument 43 -101 made available on Chakana’s SEDAR profile at

www.sedar.com.

Qualified Person

David Kelley, an officer and a director of Chakana, and a Qualified Person as defined by NI 43-

101, reviewed and approved the technical information in this news release.

ON BEHALF OF THE BOARD

(signed) “David Kelley”

David Kelley

President and CEO

For further information contact:

Michelle Borromeo, Manager – Corporate Communications

Phone: 604-715-6845

Email: [email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

Exchange) accepts responsibility for the adequacy or accuracy of this release.

- 4 -

This release may contain forward-looking statements. Forward-looking statements involve known and unknown

risks, uncertainties, and other factors which may cause the actual results, performance, or achievements of Chakana

to be materially different from any future results, performance, or achievements expressed or implied by the

forward-looking statements. Forward looking statements or information relates to, among other things, the

interpretation of the nature of the mineralization at the Project, the potential to grow the P roject, the potential to

expand the mineralization, the planning for further exploration work, the ability to de -risk the potential exploration

targets, and our belief about the unexplored parts of the Project. These forward-looking statements are based on

management’s current expectations and beliefs but given the uncertainties, assumptions and risks, readers are

cautioned not to place undue reliance on such forward- looking statements or information. The Company disclaims

any obligation to update, or to publicly announce, any such statements, events or developments except as required

by law.

Figure 1 – High grade margin zone mineralization from hole SDG18-044 in Bx 1. The six metre

interval from 70.0-76.0 averages 2.76% Cu, 8.33 g/t Au, and 19.6 g/t Ag.

- 5 -

Figure 2 – Diagram showing relationship between drill intercepts and breccia pipe geometry with

emphasis on vertical and horizontal grade variation. For the purpose of the orientation of the disclosed

drill holes, the Company assumes that the breccia pipe is orientated vertically.