Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PEAK.V ·

Sun PEAK Metals to Continue NEXT Phase of Work ON the Shire Copper-GOLD VMS Project

Exploration Programs

SUN PEAK METALS TO CONTINUE NEXT PHASE OF WORK ON THE SHIRE COPPER-GOLD VMS

PROJECT

December 19, 2024 – Vancouver – Sun Peak Metals Corp. (the “Company” or “Sun Peak”) (TSXV: PEAK |

OTCQB: SUNPF) is pleased to provide an update on its Shire Project in Ethiopia, highlighting recent

exploration results and outlining key targets for its 2025 drilling program.

Greg Davis, President and CEO commented, "We are excited to advance exploration on the Shire Project,

particularly at the Meli and Anguda North trends. Our recent mapping and surveying efforts have revealed

significant new targets that reinforce the Shire Project's exceptional copper-gold potential. As we prepare

to launch drilling in early 2025, we remain focused on unlocking the value of this promising VMS system."

Key Highlights of the Shire Project

• 2025 Exploration Program:

• Drilling to commence in Q1 at the Meli Trend and the Anguda North Target.

• Detailed Ground Deep Time Domain Electromagnetic (DTEM) surveys scheduled for January to

refine drill location targeting.

• Proven VMS Belt:

• Located in a district-scale VMS belt with high-priority copper-gold targets.

• Previous Sun Peak drilling has intercepted significant copper-gold mineralization at the Meli, Argo,

and Keel targets – all remain open for expansion. Intercepts include:

Meli

ML-001 – 15.30m @ 3.18 g/t Au, 25.0 g/t Ag and 2.2% Cu

ML-002 – 37.23m @ 2.45 g/t Au, 29.4 g/t Ag and 2.4% Cu

ML-003 – 35.43m @ 2.52 g/t Au, 22.3 g/t Ag and 1.8% Cu

Keel

KL-006 – 17.85m @ 3.95 g/t Au, 45.5g/t Ag, 1.4% Cu, and 1.6% Zn

Argo

AR-001 – 6.57m @ 1.34 g/t Au, 54.3g/t Ag, 6.3% Cu, and 1.7% Zn

• All targets drilled by Sun Peak to date have intercepted VMS style mineralization, confirming the

effectiveness of the team’s exploration methodology.

• Numerous new high -quality targets are currently being developed showing strong copper and gold

potential.

PRESS RELEASE

NR 2024-07

For Immediate Release

December 19, 2024

Vancouver, British Columbia

2025 Exploration

The exploration team has been conducting extensive detailed geological mapping and prospecting in the

field as part of the Company’s preparations for the upcoming drilling program on the Shire Project, which

will target the Meli Trend and Anguda North.

Ground Deep Electromagnetic Time Domain (“DTEM”) surveys on both the Meli Trend and Anguda North

targets will begin in early January and drilling is planned to begin late January. The results from the DTEM

work will be used to enhance targeting drill locations.

Figure 1: Map of Shire Project exploration licenses and key targets

Meli VMS Trend

Exploration work at Meli has primarily focused on a greater than 3km long, east-west oriented VMS trend,

containing targets such as Meli Main, Meli Central, and Meli Far-West (Figure 2). The trend is anchored at

each end by strong gold and copper drill intercepts (Meli Main and Meli Far West), which are part of an

extensive VMS system containing intermittent gossans and hydrothermally altered zones. Detailed gravity

surveys have revealed strong anomalies and are largely untested by diamond drilling. These strong

anomalies will be a key focus of the upcoming drill program.

Figure 2: Key VMS Targets on the Meli License

Meli Main Target

The Meli Main Target is located at the east end of the Meli t rend and has been the focus of previous

successful drill programs by the Company , resulting in some of the best copper -gold VMS intercepts on

the Project. The target includes an area of massive sulphides below an exposed 600m long gold-rich VMS

gossan (some of which has been mined to a depth of averaging 20 meters) , with additional intermittent

gossans along trend to the east and west.

Drilling by the Company at Meli Main in 2020 demonstrated the potential of the Meli trend . Highlights

from the 2020 drilling at Meli include (full results in table at end of this news release):

o ML-001 – 15.30m @ 3.18g/t Au, 25.0g/t Ag, 2.2% Cu, and 1.4% Zn

o ML-002 – 37.23m @ 2.45g/t Au, 29.4g/t Ag, 2.4% Cu, and 1.3% Zn

o ML-003 – 35.43m @ 2.52g/t Au, 22.3g/t Ag, 1.8% Cu, and 1.5% Zn

o ML-013 – 8.89m @ 2.76g/t Au, 31.8g/t Ag, 2.22% Cu, and 1.75% Zn

o ML-014 – 11.48m @ 3.57g/t Au, 31.2g/t Ag, 2.38% Cu, and 0.65% Zn

o ML-018 – 9.61m @ 3.18g/t Au, 32.3g/t Ag, 2.21% Cu, and 0.56% Zn

The Meli Main Target remains open to depth and along trend.

Meli Central

The large Meli Central Target has a very strong gravity anomaly located within the Meli VMS Trend. The

target is untested, and the signature of the gravity anomaly has strong similarities in size and magnitude

to the signatures from the Emba Derho and Bisha VMS Deposits in the same region.

The target is located only 2 kilometers west of Meli Main and the trend is defined by smaller gravity

anomalies along the trend over known mineralization.

Meli Far-West Target

The Meli Far-West Target is located approximately 3 km west of Meli Main within the Meli VMS trend. In

November 2020, two shallow drill holes for a total of 108 meters, were drilled at the target and designed

to test the gold oxide gossan. MW-001 intercepted 15.84 meters averaging 1.90 g/t gold.

Drilling confirms the presence of significant gold mineralization in the gossan and demonstrates the

potential for the Meli Far -West Target to host gold and copper VMS sulphide below the gossan . The

mineralization is open to depth and along strike, and future drilling at the Meli Far-West target will test

the massive sulfide potential beneath the gossan.

Anguda VMS System/Trend

The Anguda VMS Trend, situated within the Terer exploration license, is a prominent VMS system

extending for over 10 kilometers. Key targets along this trend include the Anguda North Target, Anguda

Main Target, Anguda Main (N), Anguda Southern Limb Target, and the Terer VMS Target (Figure 3).

Recent drilling activities at the Hamlo and Terer VMS Targets, alongside limited drilling at the Anguda

Southern Limb in 2020, have revealed typical VMS metal zoning patterns – see Sun Peak news release,

dated July 25, 2024. The data suggests a potential increase in precious and base metal concentrations in

other VMS zones within the Anguda trend.

The drill results at the Terer Target, outlined a VMS system along the trend of the Anguda North gravity

high anomaly located approximately 2 kilometers east. Final drill results from Hamlo and Terer drilling can

be found in table at the end of this release.

Anguda North VMS Target: Defined by a strong soil geochemistry anomaly, detailed ground gravity high

anomalies, airborne VTEM conductor, and 800 meters long gossan outcrops. The gossan outcrops were

defined in recent geological mapping work which was following up on the anomalies identified by the

geophysical and geochemistry surveys.

Ground DTEM survey is scheduled in Q1 2025 which will be immediately followed by drilling at Anguda

North.

Anguda Main (N) VMS Target: Defined by a greater than 1.5-kilometer-long mineralized zone of gossans

and hydrothermal alteration horizons, plunging and increasing in size to the east. The target is identified

by a copper and zinc soil geochemistry anomaly and a gravity high coincident with VTEM conductors.

The upcoming work program in Q1 2025 will include ground DTEM surveys over the Anguda North and

Anguda Main Targets, with drilling to follow.

Figure 3: Anguda regional VMS trends underlain by gravity surveys and soil geochemistry

High Priority Targets

The main focus of the upcoming drill program in early 2025 will begin with the Meli Trend and the Anguda

North Target, however exploration work will also include other high priority targets throughout the year.

A summary of these other key targets is as follows.

Keel and Argo VMS Trend

The Keel and Argo Targets are part of a significant VMS system that extends over 6 kilometers and includes

several other highly prospective targets such as the Northwest Zone (Figure 4).

During the Company’s initial drill program in 2020, Sun Peak drilled 12 holes and intercepted high-grade

copper-gold VMS mineralization at both Keel and Argo targets . The VMS zones remain open in all

directions with untested gossans and gravity anomalies directly on strike from Keel and Argo.

Future work will focus on extending these zones laterally and testing new zones along the trend.

Figure 4: Keel-Argo VMS Trend

Meda VMS Target: Defined by a 1.2 kilometers long gold, silver, copper, and zinc soil geochemistry

anomaly, several gossan outcrops, and a gravity high anomaly. A single historic vertical RC hole was drilled

in 2004 into the gossan which assayed 18 meters of 2.77 g/t gold from surface (Figure 5).

Future drilling will attempt to define the VMS Zone laterally along strike and to depth.

Figure 5: Meda VMS target underlain by geology

Target Development Work

Sun Peak’s Shire Project has approximately two dozen VMS and gold prospects currently being developed

by the Company. The Sun Peak exploration team has been in the field in Q4 2024 to follow-up on some of

these prospects including prospecting, sampling, and detailed and structural mapping. The Sun Peak team

is encouraged by the findings and several of these prospects showing strong potential for VMS and gold

drill targets. The Company will provide further details of these “pipeline” targets in a subsequent news

release in the new year.

Drill Results Summary

The following table summarizes all Sun Peak drill results since 2020 on the Shire Project over 7 targets.

Meli Main (2020) Date Reported

Hole ID From To Interval Au (g/t) Ag (g/t) Cu (%) Zn (%)

ML-001 7.86 17.2 9.34 0.07 2.2 0.5 0.1 Aug 10, 2020

ML-001 55.6 70.9 15.3 3.18 25 2.2 1.4 Aug 10, 2020

ML-002 47.37 84.6 37.23 2.45 29.4 2.4 1.3 Aug 10, 2020

ML-003 87.74 123.17 35.43 2.52 22.3 1.8 1.5 Aug 10, 2020

ML-004 72.46 83.2 10.74 3.34 27.3 1.8 1 Aug 10, 2020

ML-005 90.26 101.25 10.99 3.01 26.8 1.8 0.8 Aug 10, 2020

ML-006 70.95 74.79 3.84 2.57 30.3 1.9 0.7 Aug 10, 2020

ML-007 18.05 23.3 5.25 <0.01 3.3 2.3 <0.1 Aug 10, 2020

ML-007 34.05 35.17 1.12 3.07 45.2 5.7 <0.1 Aug 10, 2020

ML-007 39.32 40.82 1.5 1.19 12.9 0.1 <0.1 Aug 10, 2020

ML-007 52.55 53.53 0.98 4.34 38.9 5.4 <0.1 Aug 10, 2020

ML-007 61.03 63.32 2.29 2.97 24.2 1.5 0.65 Aug 10, 2020

ML-009 68.8 71.16 2.36 1.6 7.4 1.42 0.74 May 28, 2024

ML-010 13.65 17.5 3.85 0.01 1.9 0.66 0.1 May 28, 2024

ML-013 142.23 151.12 8.89 2.76 31.8 2.22 1.75 May 28, 2024

ML-014 162.6 174.08 11.48 3.57 31.2 2.38 0.65 May 28, 2024

ML-018 108.64 118.25 9.61 3.18 32.3 2.21 0.56 May 28, 2024

Meli Far West (2020)

Hole ID From To Interval Au (g/t) Ag (g/t) Cu (%) Zn (%)

MW-001 5.5 21.34 15.84 1.9 10.7 0.04 0.01 May 28, 2024

including 5.5 7 1.5 2.34 0.6 0.04 <0.01 May 28, 2024

including 11.05 21.34 10.26 2.51 15.6 0.036 0.01 May 28, 2024

including 11.05 18.6 7.55 2.94 16 0.04 0.01 May 28, 2024

Keel (2020)

Hole ID From To Interval Au (g/t) Ag (g/t) Cu (%) Zn (%)

KL-001 52.78 58.7 5.92 5.01 176.2 <0.1 <0.1 Aug 10, 2020

KL-001 59.44 79.6 20.16 0.78 18.4 0.6 2.3 Aug 10, 2020

KL-002 100.25 133.91 33.66 0.92 22.6 0.9 2.7 Aug 10, 2020

KL-003 63.15 78.35 15.2 0.84 20.2 1.1 1.3 Aug 10, 2020

KL-004 113.13 122.05 8.9 0.58 16 0.4 <0.1 Aug 10, 2020

KL-004 132.7 134.63 1.93 0.88 10.9 0.2 0.4 Aug 10, 2020