Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

PEAK.V ·

Sun PEAK Metals Commences Maiden Drill Program at High-Priority Halahila GOLD- Copper VMS Project

Drill Results Corporate Updates

SUN PEAK METALS COMMENCES MAIDEN DRILL PROGRAM AT HIGH-PRIORITY HALAHILA GOLD-

COPPER VMS PROJECT

Vancouver, BC – June 8, 2026 – Sun Peak Metals Corp. (TSXV: PEAK | OTCQB: SUNPF) ("Sun Peak" or the

"Company") today announced the commencement of its maiden diamond drill program at the Company's

100%-owned Halahila Gold -Copper Volcanogenic Massive Sulphide (" VMS") Project in the Kingdom of

Saudi Arabia ("KSA"). The approximately 2,500-metre drill program follows the successful comple�on of

drilling at the Safra VMS Project and marks the Company’s second drill campaign in Saudi Arabia this year.

Highlights

• Maiden diamond drill program underway at the Halahila Project, with approximately 2,500 metres

planned.

• Ini�al drilling will target the Halahila Main zone, where recent explora�on has iden�fied a 650 -

metre-long mineralized gossan up to 30 metres wide. The program may be expanded based on

results.

• Surface sampling at Halahila Main returned assays of up to 16.35 g/t gold and 180 g/t silver.

• Geophysical surveys have iden�fied electromagne�c ("EM ") conductors beneath the Halahila

Main zone, represen�ng compelling targets for subsurface sulphide mineraliza�on.

• Drill mobiliza�on follows the successful comple�on of 1,242 metres of drilling across 10 holes in

two target areas at the Safra VMS Project. Core samples have been submited to SGS Laboratory

(Turkey) for assaying and will be reported when available.

"Halahila has rapidly emerged as one of the most compelling exploration targets in our Saudi Arabian

portfolio," said Arron Albano, Explora�on Manager of Sun Peak . " The project exhibits many of the

hallmarks of a significant VMS system, including extensive hydrothermal alteration, a 650-metre-long gold

and silver -bearing gossan, strong surface geochemistry, and conductive targets at depth that may

represent sulphide mineralization. Recent exploration has also identified additional mineralized gossans

along a five-kilometre trend south of Halahila Main, highlighting the district-scale potential of the system

with a total length of ten kilometres . This maiden drill program represents the first opportunity to test

targets at depth and evaluate the potential for a significant new VMS discovery."

"We are pleased to have drilling underway at Halahila immediately following the successful completion of

our maiden drill program at Safra," said Greg Davis, President and CEO of Sun Peak. "Advancing multiple

projects from exploration to drilling reflects the strength of our team in the Kingdom and the advantages

of operating in Saudi Arabia, where a supportive regulatory environment, excellent infrastructure, and

PRESS RELEASE

NR 2026-09

For Immediate Release

June 8, 2026

Vancouver, British Columbia

strong government commitment to mining continue to accelerate project development. With drilling now

underway at Halahila and core samples from Safra currently being assayed, we look forward to a steady

stream of catalysts as we advance our growing Saudi Arabian portfolio."

Halahila Drill Program

The Halahila Project is located within the Precambrian Arabian Nubian Shield (Map 1) and hosts a district-

scale package of prospec�ve volcanic and sedimentary rocks interpreted to be favourable for precious

metal-rich VMS mineraliza�on.

The ini�al drill program is designed to test priority targets beneath the Halahila Main zone (Map 2A & 2B),

where geological mapping, geochemical sampling, and geophysical surveys have iden�fied coincident

indicators of a poten�ally significant mineralized system (Long Sec�on 3 and Cross Sec�on 4). Drilling will

focus on areas where TDEM surveys have defined conductors, over a strike length of 4.1km, and beneath

the 650-metre-long gossan, interpreted as poten�al sulphide mineraliza�on at depth.

Recent explora�on has expanded the project’s mineralized footprint, iden�fying mul�ple addi�onal gold-

and silver-rich gossans along a corridor extending approximately five kilometres south of Halahila Main.

These gossan zones are untested and underscore the district-scale poten�al of the project and provide a

pipeline of follow-up targets for future drilling.

The planned 2,500 -metre program will consist of mul�ple diamond drill holes designed to test the

geometry, con�nuity, and sulphide poten�al of the primary target areas. Drill core will be logged, sampled,

and submited to accredited laboratories for analysis, with assay results expected following comple�on of

the program.

Results from both the recently completed Safra drill program and the ongoing Halahila campaign are

expected to generate a consistent flow of explora�on news through the remainder of 2026. Both projects

have excellent access and favourable logis�cs, as do all of Sun Peak’s projects in the KSA.

Map 1. Sun Peak Projects Location Map.

Map 2A. Halahila License Overview Map.

Map 2B. Halahila License Overview Map.

Long Section 3. Long section through Halahila Main (A-A’) showing planned drilling and modelled TDEM conductor plates.

Cross Section 4. Cross section showing planned drill pad (B-B’), surface gossan and modelled TDEM conductor plates.

About the Halahila Project

The Halahila Project is one of Sun Peak's 100% -owned explora�on assets in Saudi Arabia and forms part

of the Company's growing por�olio of VMS and precious metals projects in the Arabian Nubian Shield.

Explora�on completed to date has iden�fied extensi ve hydrothermal altera�on, numerous gossan

occurrences, precious metal enrichment, and geophysical targets consistent with VMS mineraliza�on.

Qualified Person

Arron Albano, P. Geo., is the Qualified Person overseeing Sun Peak’s exploration projects in Saudi Arabia

and has reviewed and approved this press release.

ABOUT SUN PEAK METALS CORP.

Sun Peak Metals Corp. is focused on district -scale VMS base metal and gold projects in the Kingdom of

Saudi Arabia and Ethiopia.

In Saudi Arabia, the Company holds 13 exploration licenses totalling 1,072 km² along established VMS and

gold trends, with an additional ~200 km² under application.

In Ethiopia, the Company’s Shire Project comprises 6 exploration licenses covering approximately

1,450 km² within the Arabian-Nubian Shield, a highly prospective belt that hosts major deposits such as

the Bisha Mine and the Asmara Projects in Eritrea.

ON BEHALF OF THE BOARD OF DIRECTORS OF SUN PEAK METALS CORP.

Greg Davis,

President, CEO & Director

FOR FURTHER INFORMATION, PLEASE CONTACT:

Greg Davis

(T): +1 (604) 999 1099

(E): [email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Disclaimer for Forward-Looking Information

Certain information and statements in this news release may be considered forward -looking information or forward -looking

statements for purposes of applicable securities laws (collectively, “forward-looking statements”), which reflect the expectations

of m anagement regarding its disclosure and amendments thereto. Forward -looking statements consist of information or

statements that are not purely historical, including any information or statements regarding beliefs, plans, expectations or

intentions regarding the future. Such information or statements in this news release include, but are not limited to, statements

with respect to the anticipated benefits of the potential for exploration potential in Saudia Arabia; the untapped mineral wealth

of Saudi Arabia ; Sun Peak being successful in acquiring additional licenses; the goal of making a significant discovery and the

development of a large-scale project in Saudi Arabia or Ethiopia and identifying other potential properties and opportunities both

in Ethiopia, Saudi Arabia and globally. Such statements are subject to risks and uncertainties that may cause actual results,

performance or developments to differ materially from those contained in the statements. No assurance can be given that any

of the events ant icipated by the forward- looking statements will occur or, if they do occur, what benefits Sun Peak will obtain

from them. These forward -looking statements reflect management's current views and are based on certain expectations,

estimates and assumptions, which may prove to be incorrect. A number of risks and uncertainties could cause actual results to

differ materially from those expressed or implied by the forward -looking statements, including without limitation: These

assumptions and risks include, but are not limited to, assumptions and risks associated with the state of the political stability of

Ethiopia and the Middle Eastern region, equity financing markets and results of future exploration activities by Sun Peak.