Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PE.V ·

Pure Energy Minerals Appoints Director

Management Changes

Pure Energy Minerals Appoints Director

Vancouver, British Columbia--(Newsfile Corp. - August 24, 2022) -

Pure Energy Minerals Ltd. (TSXV:

PE) (OTCQB: PEMIF)

("Pure Energy" or "the Company") is pleased to announce that Mr. Nathaniel D.

Hartwig has been appointed to the board of directors of Pure Energy Minerals in place of Mr. Tyler

Durham, who has resigned from the board of directors.

Mr. Hartwig holds a B.A. in Industrial Engineering from the Louisiana State University and received his

MBA in Strategic Leadership from Michigan State University in 2004.

He has held various positions with

Schlumberger since 2013 and is currently Director North America, Schlumberger New Energy, leading

new energy solutions in North America.

Mr. Hartwig represents Schlumberger, which holds a 17.99%

equity position in Pure Energy.

The Company thanks Mr. Durham for his considerable contributions as a board member of Pure Energy

Minerals during the past three years and wishes him well in future endeavours.

"Pure Energy is very pleased to welcome Mr. Hartwig as a board member and we look forward to

working with him as the Clayton Valley Project moves forward," stated Mary Little, director of Pure

Energy.

About Pure Energy

Pure Energy Minerals is a lithium resource developer that is driven to become a low-cost supplier for the

growing lithium battery industry.

Pure Energy has consolidated a pre-eminent land position at its Clayton

Valley Project in the Clayton Valley of central Nevada for the exploration and development of lithium

resources, comprising 950 claims over 23,360 acres (9,450 hectares), representing the largest mineral

land holdings in the valley.

Pure Energy's Clayton Valley Project adjoins and surrounds on three sides the

Silver Peak lithium brine mine operated by Albemarle Corporation.

Pure Energy's strategic partner, Schlumberger Technologies Corporation ("SLB"), is the operator of the

Clayton Valley Project. In May of 2019, Pure Energy and SLB signed an Earn-In agreement over the CV

Project which requires significant investment by SLB at the Project, to include the design and

construction of a pilot plant capable of processing lithium-bearing brines for high-quality lithium hydroxide

monohydrate ("lithium hydroxide" or "LiOH∙H2O") and/or lithium carbonate products at a specified rate.

SLB plans to utilize both in-house and commercially available technology in the design of the CV pilot

plant. SLB's costs, technical parameters and ultimate technology are anticipated to differ from the

published PEA. For further details regarding SLB's participation, please refer to Pure Energy's Annual

General and Special Meeting Management Information Circular dated April 4, 2019, available on

SEDAR.com

.

On behalf of the Board of Directors,

"

Mary L. Little

"

Director, Pure Energy Minerals Ltd.

CONTACT:

Pure Energy Minerals Limited (

www.pureenergyminerals.com

)

Email:

[email protected]

Telephone - 604 608 6611

Cautionary Statements and Forward-Looking Information

The information in this news release contains forward looking statements that are subject to a number of

known and unknown risks, uncertainties and other factors that may cause actual results to differ

materially from those anticipated in our forward-looking statements. Factors that could cause such

differences include: changes in world commodity markets, equity markets, costs and supply of materials

relevant to the mining industry, change in government and changes to regulations affecting the mining

industry. Forward-looking statements in this release may include future exploration and development on

the Clayton Valley Project.

Although we believe the expectations reflected in our forward-looking

statements are reasonable, results may vary, and we cannot guarantee future results, levels of activity,

performance or achievements.

The Company does not undertake to update any forward-looking information, except as required by

applicable laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/134619