Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

PBM.V ·

Pacific Bay Drills 5.2 Metres Grading 6.20% Zinc, 35.83 gpt Silver, 0.68% Lead, & 0.23% Copper at Haskins-Reed

Drill Results

14517245.1

Pacific Bay Drills 5.2 Metres Grading 6.20% Zinc, 35.83 gpt

Silver, 0.68% Lead, & 0.23% Copper at Haskins-Reed

For Immediate Release. Vancouver, British Columbia, January 25, 2019. David

H. Brett, President and CEO, Pacific Bay Minerals Ltd. (TSX Venture: PBM,

“Pacific Bay” or the “Company”) reports assay results from a 7 hole, 448.2 metre

diamond drill program completed at the Company’s 100% owned Haskins-Reed

polymetalic exploration project near Cassiar in northern BC.

DJ Drilling of Surrey BC, used a low-impact, man-portable diamond drill to test

targets near the Meteor Zone, where 2011 drill hole 11MZ-07 encountered 17.5

metres grading 88.35 g/t silver, 1.11% lead and 3.39% zinc. The 2018 program

successfully extended the Meteor-Boot Zone by roughly 20 metres to the

southeast. Shallow BQ diameter drilling intersected 5.2 metres grading 6.20%

zinc, 35.83 gpt silver, 0.68% lead, and 0.23% copper. All reported grades are

core lengths only, as the true width of the zone has not yet been determined. A

full table of the results is inserted below. One of the intercepts indicated relatively

high levels of Bizmuth, so a column in the table is included for that element as

well.

Drill Hole From To Interval Ag (gpt) Pb (%) Zn (%) Cu (%) Bi (%)

18MZ-01 32.30 33.50 1.20 40.10 0.459 1.795 0.038 0.022

18MZ-02 37.25 39.80 2.55 11.57 0.117 2.944 0.027 0.005

18MZ-03 6.50 11.70 5.20 35.83 0.683 6.204 0.206 0.011

18MZ-04 13.30 13.90 0.60 32.30 0.093 8.550 0.147 0.236

18MZ-04 19.80 23.20 3.40 45.91 2.690 2.195 0.113 0.007

18MZ-06 14.10 16.30 2.20 148.36 4.789 6.752 0.352 0.033

18MZ-06 22.90 24.20 1.30 76.40 1.495 2.140 0.123 0.017

18MZ-07 11.80 17.90 6.10 56.54 1.896 2.637 0.159 0.019

18MZ-07 21.80 22.60 0.80 157.00 1.190 4.320 0.725 0.040

The mineralization was encountered in massive to semi-massive sulphide limy

skarns with few calc silicate altered skarns hosting some lesser amounts of

Pacific Bay Minerals Ltd.

120 – 601 W. Cordova Street

Vancouver, BC, V6B 1G1

Phone: 604-682-2421

14517245.1

mineralization. The highest grade mineralization is hosted in magnetite-

sphalerite limy skarns with pyrite, pyrrhotite, chalcopyrite, and minor galena.

The Haskins-Reed Property is a zinc, silver, lead, copper and bismuth prospect

with multiple mineralized zones outlined with over 200 drill holes substantial

underground development completed over a 50 year period. Since 2008, Pacific

Bay has invested over $750,000 on the property, including diamond drilling,

airborne geophysics, soil geochemistry and other surveys. 2 011 drill hole 11BZ-

10 targeting the B-Zone,intersected 14m grading 102.59 g/t silver, 0.52% copper,

4.96% zinc, and 0.29% bismuth.

Quality Control and Quality Assurance

Assay methods used in the assay of the 33 samples and 8 standard and blanks

assays by ALS Canada Ltd in North Vancouver, British Columbia is as follows:

The core samples were crushed so that 70% passed < 2mm and then pulverized

so that 85% < 75 micron and then the pulp was digested in four acid solution and

33 elements were analyzed by ICP-AES. Ore grade Ag, Pb and Zn were

analyzed by ICP-AES as well and gold was analyzed by Fire Assay of 30 grams

of pulp and atomic absorption finish. Assays of the internal standards and blanks

inserted in the batch of drill core samples showed that the assays were

consistently slightly high with precision. Assays of the blanks were not consistent

possibly due to the nugget effect in the sample blanks.

The technical disclosures in this news release were reviewed and approved by

David Bridge, P.Geo., a Qualified Person, as defined by National Instrument 43-

101.

Pacific Bay Minerals Ltd.

Per/

David H. Brett, MBA

President & CEO

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.