Saturday, September 19, 2026
MiningNewsTerminal
Saturday, September 19, 2026 Admin

OZ.V ·

Valkea Resources Completes its Inaugural Drill Program at the Paana Project, Central Lapland, Finland

Exploration Programs

www.valkea.ca | 1

TSX.V: OZ | OTCQB: OZBKF | FSE: 4A7

FOR IMMEDIATE RELEASE January 15, 2025

Valkea Resources Completes its Inaugural Drill Program

at the Paana Project, Central Lapland, Finland

Vancouver, British Columbia: January 15, 2025 – Valkea Resources Inc. (“ Valkea” or the “ Company”)

(TSX-V: OZ) (OTCQB:OZBKF) reports that it has completed over 2,000 metres of core drilling at its 100%

owned Paana Project, located near the Kittila Mine, Europe’s largest gold producer. The inaugural drill

program at Paana was part of the company’s Phase 1 exploration strategy designed to unlock the potential

of th e Aarnivalkea West target. The Paan a project is strategically located within Finland’s highly -

prospective Central Lapland Greenstone Belt (Figure 1).

Highlights

• Valkea’s inaugural Phase 1 drill program complete: Drilling at Paana was focused on investigating

the extent and structural controls on higher -grade and disseminated gold mineralization at the

Aarnivalkea West target. Assay results are expected in February.

“We are excited to have initiated and completed over 2,000 meters of drilling at the Aarnivalkea West

target, which has demonstrated the potential for significant high- grade gold mineralization,” said Chris

Donaldson, CEO of Valkea Resources. “ Our systematic approach, including drilling and the relogging of

historical core, will provide the data we need to refine our structural model and identify additional

opportunities across the Paana project. This marks an important step in our commitment to unlocking the

untapped potential of our projects in Finland’s Central Lapland Greenstone Belt.”

Drill Program

Over 2,000 metres of core drilling in six holes were completed across the northern and southern extents

of the Aarnivalkea West target on the Paana Project (Figure 2). The drill holes were designed to target the

extent and structural and/or lithological controls on higher-grade and disseminated gold mineralization. A

series of four systematic step-out holes on ~25 to 50 metre centres between and offset from historical

holes FAV62 and FAVD71 targeted the southern area whereas two step-out holes targeted the northern

extent near FAVD64 (Figure 2).

Next Steps

Once assay s are received and interpreted and the core relogging program is completed, an updated

structural and geological model will be generated. This refined model will inform the next phase of

exploration the Company intends to initiate later in 2025.

www.valkea.ca | 2

Figure 1. Map of the Central Lapland Greenstone Belt highlighting Valkea’s landholdings as well as

neighboring companies and associated exploration, development and mining projects. See References

below for sources of data.

Figure 2. Map showing the Aarnivalkea West target, Base of Till (“BoT”) gold assay data, and the locations

of historical diamond drill collars. Two areas were investigated during the recently completed drill

program; the southern and northern target areas. See References below for sources of data.

www.valkea.ca | 3

Paana Project

The Aarnivalkea West target on the Paana Project is ideally situated 24 km northwest of Agnico Eagle’s,

Kittilä mine and adjacent to Kinross Gold’s exploration tenements (Figure 1). The project is within the

Central Lapland Greenstone Belt , an emerging gold district recognized for its significant untapped

discovery potential. With a supportive regulatory environment and strong local infrastructure, Valkea

Resources is well-positioned to capitalize on the region’s growing importance in the global gold mining

sector.

About Valkea Resources

Valkea Resources is at the forefront of gold exploration in Finland's highly prospective Central Lapland

Greenstone Belt (CLGB). With an extensive portfolio of high -potential projects, including the flagship

Paana project, Valkea Resources is committed to discovering and advancing significant gold deposits in

one of the world’s emerging gold districts.

Contact Information

For more information please contact:

Chris Donaldson, Chief Executive Officer and Director

Email: [email protected]

Website: www.valkea.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Qualified Person

The disclosure of technical or scientific information in this press release has been reviewed and approved

by Dr. Christopher Leslie, P .Geo., a Qualified Person as defined under the terms of National Instrument 43-

101. Some technical information contained in this release is historical in nature and has been compiled

from public sources believed to be accurate.

Mineralization hosted on adjacent and/or nearby projects is not necessarily indicative of mineralization

hosted on Valkea’s projects.

References

1. Agnico Eagle website (agnicoeagle.com), Dec. 31, 2023 Reserve & Resource statement

2. Agnico Eagle website (agnicoeagle.com), 2009-2023 annual results reports.

*total endowment, sum of proven and probable mineral reserves, measured, indicated and inferred mineral resources and historical production

3. Thomas, B., Larouche, I. and Digges La Touche, G. (2023), NI 43-101 Technical Report Rupert Resources Lt. Updated Mineral Resource Estimate

for the Ikkari Project – Finland, Effective Date December 12, 2023, Rupert Resources website (rupertresources.com) +indicated mineral resource

4. Aurion Gold website (aurion.com), May 2nd, 2022 NR and June 13th, 2022 NR

5. Aurion Gold website (aurion.com), March 19th, 2024 NR

6. S2 Resources website (s2resources.com.au), August 12th, 2020 NR

www.valkea.ca | 4

7. S2 Resources website (s2resources.com.au), January 4th, 2021 NR

8. S2 Resources website (s2resources.com.au), October 11th, 2021 NR

Forward Looking Statements

This news release contains forward -looking statements or forward -looking information relating to the

future operations of the Company and other statements that are not historical facts. Forward -looking

statements in this news release include but are not limited to commencement of trading on the TSXV.

Forward-looking statements are based on the reasonable assumptions, estimates, analyses and opinions

of management made in light of its experience and its perception of trends, current conditions and

expected developments, as well as other factors that management believes to be relevant and reasonable

in the circumstances at the date that such statements are made, but which may prove to be incorrect.

Management believes that the assumptions and expectations reflected in such forward -looking

statements are reasonable. Assumptions have been made regarding, among other things: the benefits of

the Acquisition and the Offering; the Company’s ability to carry on exploration and development activities;

the timely receipt of required approvals; the price of metals; the integration of assets acquired by the

Company; and the Company’s ability to obtain financing as and when required and on reasonable terms.

Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may

have been used.

Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that

may cause actual results to be materially different from those expressed or implied by such forward -

looking statements. Such risks, uncertainties and ot her factors include but are not limited to: the

Company’s early stage of development; the fluctuation of the price of metals; the availability of additional

funding as and when required; the speculative nature of mineral exploration and development; the timing

and ability to maintain and, where necessary, obtain necessary permits and licenses; the uncertainty in

geologic, hydrological, metallurgical and geotechnical studies and opinions; infrastructure risks, including

access to water and power; environmental risks and hazards; risks associated with negative operating cash

flow; and risks associated with dilution. For a further discussion of risks relevant to the Company, see the

Company’s other public disclosure documents.

Although management has attempted to identify important factors that could cause actual results to differ

materially from those contained in forward -looking statements, there may be other factors that cause

r e s u l t s n o t t o b e a s a n ti c i p a t e d , e s ti m a t e d o r i ntended. There is no assurance that forward -looking

statements will prove to be accurate, as actual results and future events could differ materially from those

anticipated in such forward-looking statements. Accordingly, readers should not place undue reliance on

forward-looking statements. The Company does not undertake to update any forward-looking statements,

except as, and to the extent required by, applicable securities laws.