One World Announces Drill Results
Suite 615 – 800 West Pender Street, Vancouver, B.C. Canada, V6C 2V6 Telephone: 1-604-564-2017
www.oneworldlithium.com
ONE WORLD
LITHIUM
ONE WORLD LITHIUM ANNOUNCES INITIAL DRILLING RESULTS AND FUTURE DRILLING PROGRAM
VANCOUVER, BC - July 11, 2019 - One World Lithium Inc . (OTCQB -OWRDF) (CSE -OWLI) (the “Company” or “OWL”)
announces it has received drilling results from JehCorp Inc., the operator. The results from the initial five holes did not
drill deep enough to test the geophysical, geochemical, and geological targets as previously disclosed. In summary, the
planned target depths for drill holes 1,3,6,9, & 11 totalled 1,700 meters (5,600 feet) where the actual total depths reached
were 690 meters (2,260 feet) from the Company’s Salar del Diablo Property located in the State of California Baja Norte,
Mexico.
Future Drilling Program
The Company will be reviewing several drill rig options to ensure the next drilling program can reach total depths of more
than 500 meters. In keeping with this, the Company is seeking advice from Layne Drilling and outside experts with a track
record of successfully drilling salars.
Initial Drilling Results
The constant sluffing of sand, presence of multiple clay formations, unconsolidated gravel and rubble did not permit the
drill holes to reach the target depths.
In addition, the results suggest fresh water used in reverse circulation drill ing may have prevented accurate sampling of
both brine and sediment samples. Approximately 20,000 liters (5,300 gallons) of fresh water are pumped down a hole
daily. This allows circulation which carries the samples to the surface. This water may have penetrated aquifers containing
brine where the subsequent samples taken were diluted with the same fresh water being pumped down the drill hole.
Hence, the water sample results contained nominal lithium results and the sediment samples may have been diluted. Of
the 98 sediment samples taken all sediment samples assayed for anomalous lithium and potassium. Of the 98 sediment
samples taken from the 5 drill holes the lithium grades ranged from a high of 273 ppm and a low of 7.3 ppm with an
average of 47 ppm. The following chart summarizes each drill hole.
D rill H o le # D epth in M eters Element # o f Samples H ighest Grade Lo west Grade
A verage
Grade
1 1 94 Lithium 29 273.00 1 2.90 67.76
P o tassium 29 1 .58 0.22 0.62
11 1 50 Lithium 19 1 56.50 1 9.90 60.67
P o tassium 19 2.1 8 0.37 0.90
3 1 68 Lithium 27 1 08.00 1 2.20 31 .63
P o tassium 27 0.82 0.1 6 0.38
6 1 26 Lithium 11 69.50 1 3.60 46.69
P o tassium 11 2.1 8 0.20 0.50
9 96 Lithium 12 34.90 7.30 1 7.32
P o tassium 12 0.36 0.1 3 0.23
A SSA Y R ESULT S F R OM SED IM EN T S
Suite 615 – 800 West Pender Street, Vancouver, B.C. Canada, V6C 2V6 Telephone: 1-604-564-2017
www.oneworldlithium.com
ONE WORLD
LITHIUM
Timing
Contracting the correct drill rig will be announced as soon as possible. The granting of a new drilling permit is expected to
take a short period of time as the environmental permit already issued covers any further drill locations. The Company
intends to resume its 4,250 foot drilling program before the end of September 2019.
Milestones to date
As previously reported in the news release of June 18, 2019 the presence of multiple aquifers containing brine over an
area of 20,000 hectares (77 square miles) with a trend extending to the north and northeast. To cover this trend, 28,030
additional hectares were staked adjoining the original 75,400 hectares for a total of 103,430 hectares (400 square miles).
As John Hiner, Principal Geologist, notes on July 09, 2019 “drill results to date prove the existence of brines in the basin
as well as the existence of lithium in rocks.”
Doug Fulcher, President and CEO, notes “as previously reported, lithium exists in the rhyolitic source rocks, relic hot springs
located throughout the property that contain lithium which may have been transported by faults to the salar, all 83
geochemical surface samples assayed for lithi um, and anomalous lithium samples present in the five hole sediment
samples. The Salar del Diablo property now covers 103,430 hectares of prospective lands and we have only partially
explored less than 10% of this property. To now drilling this correctly to depth will be an exciting time for our Company.”
John E. Hiner, SME Registered member and a qualified person as defined by the Canadian National Instrument 43-101 has
reviewed and approved the scientific and technical disclosure contained in this news release.
About One World Lithium
One World Lithium Inc is an explora tion company focused on lithium in brine projects. It currently has earned a 60%
property interest with an option to acquire a further 30% property interest for a total of a 90% property interest in the
103,430 hectares (399 square mile) Salar del Diablo l ithium brine project located in the State of California Baja Norte,
Mexico.
On behalf of the Board of Directors of One World Lithium Inc.,
“Douglas Fulcher”
President and Chief Executive Officer
For further information please visit www.oneworldlithium.com or email [email protected] or call
1-888-280-8128
Forward-Looking Information: This press release may include forward looking information within the meaning of Canadian securities
legislation. Forward looking information is based on certain key expectations and assumptions made by the management of the O WL,
including the intention of OWL to proceed with the advancement of the Property. Although OWL believes that the expectations and
assumptions on which such forward looking information is based are reasonable, undue reliance should not be placed on the forward -
looking information because OWL can give no assurance that they will prove to be correct. Forward looking statements contained in this
press release are made as of the date of this press release. OWL disclaims any intent or obligation to update publically any forward-
Suite 615 – 800 West Pender Street, Vancouver, B.C. Canada, V6C 2V6 Telephone: 1-604-564-2017
www.oneworldlithium.com
ONE WORLD
LITHIUM
looking information, whether as a result of new information, future events or results or otherwise, other than as required by applicable
securities laws. There can be no assurance that such statements will prove to be accurate and actual results and futu re events could
differ materially from the those anticipated in such statements, important factors that could cause actual results to differ materially
from the company’s expectations include: (I) inability of OWL to execute its business plan and raise the required financing (II) accuracy
of mineral or resource exploration activity (III) continued access to mineral property and (IV) risks and market fluctuations common to
the mining industry and lithium sector in particular. The reader is cautioned that ass umptions used in the preparation of any forward -
looking information may prove to be incorrect. Events or circumstances may cause actual results to differ materially from tho se
predicted, as a result of numerous known and unknown risks, uncertainties, and other factors, some of which are beyond the control of
the OWL. The reader is cautioned not to place undue reliance on any forward-looking information contained in this press release.
Neither the Canadian Securities Exchange nor its Market Regulator (as th at term is defined in the policies of the Canadian Securities
Exchange) accepts responsibility for the adequacy or accuracy of this release.