Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OSM.V ·

ION Energy Receives Highly Encouraging Geophysics Results from Urgakh Naran Lithium Brine Project

Exploration Programs Sampling & Geoscience Results

ION Energy Receives Highly Encouraging

Geophysics Results from Urgakh Naran

Lithium Brine Project

Toronto, Ontario--(Newsfile Corp. - July 11, 2022) - ION Energy Limited (TSXV: ION) (OTCQB: IONGF)

(FSE: 5YB) ("

ION

" or the "

Company

") is very pleased to announce the results of a TEM (Transient

Electro Magnetic) survey on its Urgakh Naran project. The TEM survey detects high conductivity and low

resistivity across the basin, and to predict extensions, faults, and displacements affecting the aquifer.

The program was highly successful in meeting all objectives.

"

The Company is extremely pleased to report TEM results that suggest that the Urgakh Naran

project's aquifer is large in size and shows low resistivity. On the back of at surface samples of 918

Mg/L Lithium as announced by the Company on May 9, 2022, these geophysics results further

advance the hypothesis of a potential significant lithium brine deposit at the Company's Urgakh

Naran site,

" said Ali Haji, CEO & Director of ION Energy.

Summary

ION Energy has successfully completed an 82 line-km TEM survey on its Urgakh Naran project in

Mongolia.

The survey identified very low resistivity northeast structures narrowing from the southwest to the

northeast direction in the central licence.

Figure 1: Low Resistivity Zone Illustrated Against Resistivity Sections

To view an enhanced version of Figure 1, please visit:

https://images.newsfilecorp.com/files/6906/130471_fe763eb0c4360a8f_002full.jpg

.

ION Energy is currently assessing the data to determine suitable drill monitoring well locations to test the

conductive zone at depth. A three hole monitoring well drill program is planned that will be announced to

market in order to obtain samples for lithological description and porosity testing, flow rates and depth-

specific brine samples that include chemical assays to allow the Company to achieve an early resource

estimate. Figure 1 illustrates the highly conductive zone on the resistivity sections.

Survey Results

All lines show resistivity beginning at a highly encouraging 0.2 Ohm, with a maximum resistivity of 500

Ohm, drawing similarities to assets in the Lithium Triangle.

Going Forward

ION Energy is highly encouraged by the results of the TEM survey. Surface brine sampling at 918 Mg/L

Li at Urgakh Naran along with the 1502 ppm Li seen at the White Wolf Prospect at

Baavhai Uul continue

to display high prospectivity. The TEM results, geophysics at Baavhai Uul have confirmed the potential

for the development of a potentially large, deep highly conductive zone in the central part of the Urgakh

Naran concession supporting the geological exploration model and thesis developed by the company.

All technical information disclosed in this press release has been reviewed and approved by

Khurelbaatar Lamzav, P.Geo., an independent consultant to the Company and a "Qualified Person"

under National Instrument 43-101.

About ION Energy Ltd.

ION Energy Ltd. (TSXV: ION) (OTCQB: IONGF) (FSE: 5YB) is committed to exploring and developing

Mongolia's lithium salars. ION's flagship, 81,000+ hectare Baavhai Uul lithium brine project, represents

the largest and first lithium brine exploration licence award in Mongolia. ION also holds the 29,000+

hectare Urgakh Naran highly prospective Lithium Brine licence in Dorngovi Province in Mongolia. ION is

well-poised to be a key player in the clean energy revolution, positioned well to service the world's

increased demand for lithium. Information about the Company is available on its website,

www.ionenergy.ca

, or under its profile on SEDAR at

www.sedar.com

.

For further information:

COMPANY CONTACT: Ali Haji,

[email protected]

, 647-871-4571

MEDIA CONTACT: Siloni Waraich,

[email protected],

416-432-4920

Cautionary Note Regarding Forward-Looking Information

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news

release.

Information set forth in this news release contains forward-looking statements. Forward-looking

statements include estimates and statements that describe the Company's future plans, objectives or

goals, including words to the effect that the Company or management expects a stated condition or

result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates",

"expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are

based on assumptions and address future events and conditions, by their very nature they involve

inherent risks and uncertainties. Although these statements are based on information currently available

to the Company, the Company provides no assurance that actual results will meet management's

expectations. Risks, uncertainties and other factors involved with forward-looking information could

cause actual events, results, performance, prospects and opportunities to differ materially from those

expressed or implied by such forward-looking information. Forward-looking information in this news

release includes, but is not limited to, the Company's objectives, goals or future plans, statements,

potential mineralization, exploration and development results, the estimation of mineral resources,

exploration and mine development plans, timing of the commencement of operations and estimates of

market conditions. Important factors that could cause actual results to differ materially from ION Energy's

expectations include, among others, uncertainties relating to availability and costs of financing needed in

the future, changes in equity markets, risks related to international operations, the actual results of

current exploration activities, delays in the development of projects, conclusions of economic evaluations

and changes in project parameters as plans continue to be refined as well as future prices of lithium, and

ability to predict or counteract potential impact of COVID-19 coronavirus on factors relevant to the

Company's business. There can be no assurance that forward-looking statements will prove to be

accurate and actual results and future events could differ materially from those anticipated in such

statements. Accordingly, readers should not place undue reliance on forward-looking statements.

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/130471