Monday, November 23, 2026
MiningNewsTerminal
Monday, November 23, 2026

ORE.TO ·

Orezone Intercepts Further High-Grade Mineralization Below Life of Mine Pits Including 1.59 g/t Gold over 48.00M and 1.09 g/t Gold over 45.00M

Drill Results Exploration Programs

August 19, 2025 – Vancouver, BC - Orezone Gold Corporation (TSX: ORE | ASX: ORE | OTCQX: ORZCF) (the “Company” or “Orezone”) is pleased to provide additional drill results from its ongoing multi-year exploration campaign at its flagship Bomboré Gold Mine. The latest results are from the North and P8P9 zones, targeting the down plunge continuity of higher-grade sub-zones beneath the current life of mine pits.

Selected Drill Highlights1:

  • 1.59g/t Au over 48.00m, including 4.86g/t Au over 9.00m (BBD1358)
  • 1.09g/t Au over 45.00m, including 2.56g/t Au over 8.00m (BBD1370), within a broader

mineralized intercept of 0.64g/t Au over 157.00m2

  • 1.97g/t Au over 16.10m, including 2.74g/t Au over 10.10m (BPC7217)
  • 2.01g/t Au over 14.00m (BPC7216)
  • 2.67g/t Au over 7.40m (BBD1367)
  • 1.63g/t Au over 11.00m (BPC7216)
  • 1.48g/t Au over 8.75m (BBD1369)
  • 1.82g/t Au over 6.40m (BPC7210)
  • 1.16g/t Au over 9.00m (BBD1369)
  • 1.47g/t Au over 6.50m (BBD1368)
  • 1.01g/t Au over 9.00m (BPC7217)

Patrick Downey, President and CEO stated, “These latest drill results confirm the down plunge continuity of multiple higher-grade sub-zones, with mineralized traces extending beneath the current resource pits, and remaining open at depth. The targeted drilling at the North and P8P9 zones further underscores the near-term potential at Bomboré to selectively pull higher-grade reserve pits to depth across the greater 14km long reserve defined trend. Of particular significance is the very broad sub-zone of mineralization at depth in P8P9. This zone does not appear at surface and is the broadest zone of continuous mineralization that has been intercepted at Bomboré, demonstrating significant exploration potential.

1. Please see Table 1 for estimated true widths.

2. Composite includes below cut-off dilution.

  • 1 -

The results of this concentrated drilling serve to complement the ongoing wider spaced step-out drill program, which is focused on identifying new higher-grade centers of mineralization both at depth and near-surface along strike.

In H1-2025, approximately 30,000m of exploration drilling was completed at Bomboré. We are extremely pleased with the results and success of the program to date, which includes 1) extending North Zone footwall mineralization up to 200m below the current reserve pits along an 800m strike length (including 2.55g/t Au over 23.00m and 1.14g/t Au over 29.50m), 2) extending mineralization of the P17S high-grade sub-zone a further 300m down plunge (7.40g/t Au over 6.70m) and 3) identifying multiple broad near surface strike extensions (including 2.22g/t Au over 14.00m, 1.12g/t Au over 10.00m and 0.92g/t Au over 14.35m).3

Drilling will continue in H2-2025 on multiple fronts in support of the Company’s long-term goal of increasing Bomboré’s current stated global resource from 5 million ounces4 to a targeted 7 to 10 million ounces longer term.5 This is truly an exciting prospect with the ongoing hard rock expansions positioned to increase Bomboré’s overall production to 220,000-250,000 ounces per annum.6”

North & North Hill Zone

The ongoing drilling program continues to define and expand mineralized trends along the 3km strike length of the North Zone. Mineralization in the shear-hosted “Footwall Zone” is associated with rheological and chemical differences between siltstones and shales and the volcaniclastic footwall sediments. Gold grades are correlated with quartz veinlets with disseminated pyrite and arsenopyrite as accessory minerals. Ore shoots are developed where north-northeast trending steep-dipping shears intersect the northeast trending and easterly dipping footwall shear. Fold hinge and stretching lineation measurements confirm the moderate north to north-northeast plunging mineralization.

The North Hill Zone, which sits east of the Footwall Zone, continues to deliver promising grades and widths with higher grades corresponding to increased extensional quartz veining. These veins occur between two steep-dipping north-northeast trending mineralized deformation zones suggesting on-going deformation has resulted in sites of dilation orthogonal to the steeper shears.

The recent drilling was successful in confirming 1) the down plunge continuity of the higher-grade North Hill sub-zone beneath the life of mine reserve pit (including intercepts of 1.59g/t Au over 48.00m and 1.97g/t Au over 16.10m), and 2) further delineating higher-grade mineralization within the west dipping footwall shear (2.01g/t Au over 14.00m). Both of these higher-grade trends remain open to depth, and will be the focus of future follow-up drilling.

3. The drill results were previously disclosed in the Company’s press releases dated June 10, 2025 and January 26, 2025. See also Table 2.

4. Refer to the Company’s prospectus dated and lodged with ASIC on July 11, 2025 (the “ASX Prospectus”), a copy of which is available on the Company’s website for the Company’s Mineral Resource Estimate: 27,530kt at 0.78g/t Au for 692koz Au Measured Mineral Resources, 151,735kt at 0.78g/t Au for 3,814koz Au Indicated Mineral Resources and 20,015kt at 0.95g/t Au for 610koz Inferred Mineral Resources. The Company confirms it is not aware of any new information or data that materially affects the information included in the Prospectus and that all material assumptions and technical parameters underpinning the mineral resources in the Prospectus continue to apply and have not materially changed.

5. This statement of the Company’s goal of increasing the current stated 5 million global resource base to a targeted 7 to 10 million ounces longer term is an aspirational statement, and the Company does not yet have reasonable grounds to believe the statement can be achieved.

6. Refer to the ASX Prospectus. The Company confirms it is not aware of any new information or data that materially affects the information included in the ASX Prospectus and that all material assumptions and technical parameters underpinning the forecasted gold production targets in the Prospectus continue to apply and have not materially changed.

  • 2 -

North Hill Zone: selected high-grade sub-zone intercepts (previously reported7):

  • 5.35g/t Au over 21.00m (BBD1220)
  • 3.14 g/t Au over 18.00m (BBD1285)
  • 3.30g/t Au over 20.00m (BBD1219)
  • 2.55 g/t Au over 23.00m (BBD1324)

P8P9 Zone

The north-northeast trending P8P9 Zone is separated from the North Zone by an ephemeral drainage channel. Mineralization is defined over a 1.6km strike length with a width of 1.4km at its widest point. Discrete north-northeast higher-grade lenses occur within wide low-grade pyrite rich zones dipping steeply to the east. Similar to North Hill, zones of flatter lying extensional quartz veining are also present.

Mineralization intersected in holes BBD1368, BBD1369 and BBD1370 demonstrate the potential for wide zones of mineralization with no significant expression near surface. Mineralization is hosted within a granodiorite unit with abundant disseminated pyrite with above background gold levels throughout. Of note is hole BBD1370 which returned 1.09g/t Au over 45.00m, within one of the widest mineralized intercepts on the property to date of 0.64g/t Au over 157.00m8. Overall, this step-out drilling at P8P9 was successful in extending this zone of higher-grade mineralization by a further 100m down plunge.

P8P9 Zone: selected high-grade sub-zone intercepts (previously reported9):

  • 2.04g/t Au over 35.00m (BBD0483)
  • 1.95g/t Au over 45.00m (BBD0522)
  • 1.72g/t Au over 40.40m (BBD1294)
  • 1.06g/t Au over 44.00m (BBD1312)

7. The drill results were previously disclosed in the Company’s press releases dated December, 21, 2022; March 6, 2023; December 21, 2022; and January 26, 2025, respectively. See also Table 2.

8. Composite includes below cut-off dilution.

9. The drill results were previously disclosed in the Company’s press release dated March 6, 2023. See also Table 2.

  • 3 -

Figure 1 – Bomboré Plan Map Highlighting Selected Intercepts

Figure

  • 4 -

Figure 2 – North Hill Zone Composite Long Section Highlighting Selected Intercepts (Looking Southeast)

Figure

  • 5 -

Figure 3 – P8P9 Zone Composite Long Section Highlighting Selected Intercepts (Looking Southeast)

Figure

  • 6 -

Figure 4 – P8P9 Zone Composite Cross Section Highlighting Selected Zone (Looking Northwest)

Figure

  • 7 -

Table 1 – Drill Results Table

HoleZoneEasting Northing Elv. Dip Azi. EOH FromToLength* Grade Type
(m)(m)(m)(m)(g/t Au)
BBC7203P117280121349498285-5026815074.0075.001.007.70OX
and134.00 135.001.001.58HR
BBC7204P117279221349498291-502681010.007.007.000.54OX
and79.0082.003.001.07HR
and93.0095.002.002.22HR
BBC7205P11728108728108279-50268120NSR
BBC7206Siga E7281041347980293-4924814289.0090.001.006.65HR
BBC7207Siga E7282221348027291-49248140136.00 137.001.002.12HR
BBC7208Siga E728313728313283-49248100NSR
BBC7209Siga E7283111347894283-502506013.0014.001.001.49OX
BBC7220North Zone7286391353346276-5031210023.0028.005.000.38OX
and32.0049.0017.000.65OX
and75.0078.003.000.55HR
BBC7221North Zone7285481353361273-5013213075.0076.001.003.05HR
and80.0084.004.000.38HR
and95.0098.003.000.49HR
and112.00 115.003.001.16HR
BBC7222Siga E7283601347861280-5025011136.0040.004.000.33OX
BBC7223Siga S7282771345068270-502507231.0039.008.000.35OX
BBC7224Siga S7282291345049270-502508112.0024.0012.000.51OX
BBC7225Siga S728182728182269-5024980NSR
BBC7226Siga S728340728340266-5025080NSR
BBC7227Siga S728294728294266-5025080NSR
BBC7228Siga S728247728247266-5025080NSR
BBC7231P167295211344797261-502707219.0031.0012.001.06OX
Incl.27.0031.004.001.86OX
and59.0064.005.000.50HR
and69.0072.003.000.68HR
BBC7232P16729370729370261-5026876NSR
BBC7233P167292811344447260-502689290.0092.002.000.89HR
BBC7234P13726320726320275-50269140NSR
BBC7235P13726403726403274-50270130NSR
BBC7236P13726350726350275-50268130NSR
BBC7237P13726352726352273-5027080NSR
BBC7238P13726163726163273-50270120NSR
BBC7239P137261451343997271-5027010096.0097.001.002.44HR
BBC7240P137261451343799269-4927115087.0090.003.008.81HR
BBC7241P13726132726132270-49269100NSR
BBC7242P137261271343749268-5026710059.0060.001.002.26HR
BBC7243P13725743725743273-5011490NSR
BBC7244P13726214726214269-50268120NSR
BBC7245P137260951342692273-501168436.0042.006.000.66OX
BBC7246P13725896725896275-50115108NSR
BBC7247P137247761341625272-5011711421.0025.004.000.70OX
BBC7248P137248401341594273-501156019.0023.004.000.21OX
BBC7249P137247391341505271-5011512024.0037.0013.000.41OX
and91.0094.003.001.90HR
BBC7250P137247871341481271-501136031.0038.007.001.10OX
Incl.31.0033.002.003.16OX
BBC7251P13724558724558273-5011480NSR
BBC7252P137245061340954273-491171080.001.001.001.06OX
BBC7253P13724605724605273-5211698NSR
BBC7254Siga S727790727790266-5024980NSR
BBC7255Siga S728280728280267-4924980NSR
BBC7256P11728053728053281-50270120NSR
BBC7257P11728043728043280-50270120NSR
BBC7258P117276381349521288-5027012067.0070.003.001.22HR
BBD1350P167294121344361259-5026820149.0050.001.004.15OX
and126.00 128.853.000.84HR
  • 8 -
HoleZoneEastingNorthingElv.DipAzi.EOHFromToLength*GradeType
(m)(m)(m)(m)(g/t Au)
and132.00135.003.000.77HR
BBD1351P16728970728970258-50270213NSR
BBD1352P16730374730374260-51270210NSR
BBD1353P177304101343174261-55270390294.80296.401.602.98HR
and344.00346.002.000.73HR
BBD1354Siga S7286171345349269-5125024037.0048.5011.500.39OX
and115.00116.001.0018.77HR
and163.50166.102.600.65HR
and194.00207.0013.000.53HR
BBD1355Siga E7287061347108273-5224917422.0037.0015.000.94OX
Incl.22.0028.006.001.68OX
and47.5058.5011.000.63OX
and76.5078.502.001.37HR
and93.5097.504.000.64HR
and113.50116.503.000.60HR
and137.50140.503.001.26HR
and145.50157.5012.000.57HR
BBD1356Siga E7285991347236274-50250297112.00116.004.000.90HR
and173.00182.009.001.90HR
Incl.173.00176.003.004.74HR
and199.00200.001.001.65HR
and257.00263.806.800.97HR
BBD1357North Zone7290171353650279-50312270224.00228.004.000.59HR
BBD1358North Zone7289371353652280-5231027063.0072.159.150.49OX
and126.00127.601.606.09HR
and137.00185.0048.001.59HR
Incl.165.00174.009.004.86HR
and234.00259.3615.360.63HR
Incl.234.00237.003.001.35HR
BBD1359North Zone7290941353643276-5431238165.0066.001.005.37OX
BBD1360North Zone7282751353337270-5031225811.0014.003.000.26OX
and43.0047.004.001.51OX
and120.00124.004.000.81HR
and162.00170.808.800.38HR
and199.00206.307.300.60HR
BBD1361P17 S729160729160258-51270204NSR
BBD1362P17 S730584730584266-51270135NSR
BBD1363P17 S730488730488267-508981NSR
BBD1364Siga S7289171344927262-5025013523.0026.003.000.62OX
and34.0036.002.000.99HR
and49.9071.0021.100.62HR
and75.0080.005.001.22HR
BBD1365Siga S7286351344983266-5325219236.0042.656.650.72OX
and79.0085.006.000.50HR
and104.00105.851.852.90HR
BBD1366Siga S7286081345400270-5024925142.0045.003.001.41OX
and163.90176.0012.100.57HR
and191.00195.004.000.57HR
and202.00204.002.001.42HR
BBD1367P8P97285051351717272-5231046581.0082.001.004.25OX
and231.00233.802.801.39HR
and313.00320.407.402.67HR
and327.00345.0018.000.89HR
Incl.334.70343.008.300.92HR
and424.00449.0025.000.68HR
Incl.428.80443.0014.000.84HR
BBD1368P8P97279631351598269-5231056711.0014.103.100.43OX
and74.0078.004.001.11HR
and113.00124.0011.000.43HR
and141.00147.506.501.47HR
and194.00197.103.100.67HR
and275.00283.008.000.53HR
and287.00290.003.000.76HR
  • 9 -
Hole Zone Easting Northing Elv. Dip Azi. EOH FromToLength* Grade Type
(m) (m)(m)(m)(g/t Au)
and308.00 330.0022.000.69HR
Incl.310.00 317.007.000.97HR
and389.00 406.0017.000.62HR
Incl.396.00 400.004.001.03HR
and414.00 424.0010.000.62HR
and428.00 431.003.000.60HR
BBD1369 P8P9 727935 1351556269 -51 315 496 11.0012.001.001.67OX
and29.4032.703.301.12HR
and83.5084.501.003.55HR
and103.00 110.007.000.96HR
and119.00 122.003.001.35HR
and140.00 141.001.002.85HR
and193.00 198.005.001.94HR
and270.40 277.206.800.83HR
and285.00 293.758.751.48HR
Incl.291.00 293.753.003.65HR
and300.00 309.009.001.16HR
and315.00 318.003.000.61HR
and327.00 338.0011.000.48HR
and378.00 383.005.000.76HR
BBD1370 P8P9 727903 1351453272 -51 312 537 32.0035.203.200.61HR
and95.0096.001.003.64HR
and211.15 212.000.857.45HR
and238.00 283.0045.001.09HR
Incl.271.00 279.008.002.56HR
and288.00 325.0037.000.64HR
and352.00 357.855.850.89HR
and376.00 389.0013.000.70HR
and395.00 403.008.000.58HR
BPC7210 North Zone 728928 1353759281 -50 313 437 1.0020.0019.000.52OX
and37.0049.0012.000.30OX
Incl.43.0046.003.001.61OX
and161.00 184.0023.000.78HR
Incl.168.00 174.406.001.82HR
and277.00 299.0022.000.63HR
and354.00 360.006.001.57HR
BPC7211 North Zone 729368 1354172283 -51 310 349 37.0049.0012.000.30OX
and277.00 291.0014.000.60HR
and295.00 299.004.001.22HR
and313.00 317.004.000.65HR
BPC7213 North Zone 729437 729437286 -50 312 105NSR
BPC7214 North Zone 729485 1354333290 -50 311 263 52.0055.003.001.51OX
and189.00 196.007.001.02HR
BPC7215 North Zone 728906 1353474277 -49 311 342 10.0025.0015.000.48OX
and208.00 210.002.003.07HR
BPC7216 North Zone 728927 1353525278 -50 311 343 18.0025.007.000.50OX
and51.0056.005.001.27OX
and69.0073.004.000.55OX
and183.00 185.002.001.33HR
and189.00 203.0014.002.01HR
Incl.197.00 203.006.003.03HR
and287.00 298.0011.001.63HR
Incl.291.00 297.006.002.43HR
BPC7217 North Zone 728943 1353675280 -50 312 294 2.0017.0015.000.33OX
and21.0032.0011.000.48OX
and36.0038.002.000.86OX
and42.0046.004.000.60OX
and50.0056.006.000.68OX
and135.00 149.0014.000.58HR
and186.90 203.0016.101.97HR
Incl.186.90 197.0010.102.74HR
and207.00 215.008.000.65HR
and225.50 234.009.001.01HR
  • 10 -
HoleZoneEasting Northing Elv. Dip Azi. EOH FromToLength* Grade Type
(m)(m)(m)(m)(g/t Au)
Incl.225.50 229.403.901.72HR
BPC7218North Zone7287281353402277-5031020731.0034.0010.000.48OX
BPC7219North Zone7286871353304276-513131581.0055.0054.000.39OX
  • Mineralized intervals are reported as downhole lengths. True widths of mineralization are between 75-85% of drilled lengths.

Table 2 – Referenced Reported Historic Intervals

HoleZoneEastingNorthingElv.DipAzi.EOHFromToLength*GradeType
(m)(m)(m)(m)(g/t Au)
BBD1220North Zone7289011353648279-56312229150.00170.0021.005.35OX
BBC7141North Zone7303901354301278-4531510027.0041.0014.002.22OX
BBD0483P8P97277901351420282-52311302167.00202.0035.002.04HR
BBD0522P8P97278191351528281-51309351207.00252.0045.001.95HR
BBD1124P17S7304251343375261-49274495459.00465.706.707.40HR
BBD1219North Zone7289711353652279-52314211166.00186.0020.003.30HR
BBD1285North Zone7289421353545278-55313295199.00215.0018.003.14HR
BBD1294P8P97277401351448280-5831325799.00140.5040.401.72HR
BBD1312P8P97279051351520282-53307377260.00304.0044.001.06HR
BBD1320North Zone7294921354296289-56314321259.00288.5029.501.14HR
BBD1324North Zone7289951353667280-52312312193.00216.0023.002.55HR
BBD1334P17S7304831343350261-54273519488.50498.5010.001.12HR
BBD1348P167295661344413259-50273303214.00228.3514.350.92HR

About Orezone Gold Corporation

Orezone Gold Corporation (TSX: ORE, ASX: ORE, OTCQX: ORZCF) is a West African gold producer engaged in mining, developing, and exploring its 90%-owned flagship Bomboré Gold Mine in Burkina Faso. Construction of the stage 1 hard rock expansion is well underway, with first gold expected in Q4-2025. Combined production from the oxide and stage 1 hard rock operations is forecasted to total between 170,000 and 185,000 ounces in 2026.10 The Company is also advancing the stage 2 hard rock expansion, which is forecasted to increase annual production to between 220,000 and 250,000 ounces.11

The technical report entitled Bomboré Phase II Expansion, Definitive Feasibility Study is available on SEDAR+ and the Company’s website.

Contact Information

Patrick Downey President and Chief Executive Officer

Kevin MacKenzie Vice President, Corporate Development and Investor Relations

Tel: 1 778 945 8977 [email protected] / www.orezone.com

10. Refer to footnote 6.

11. Refer to footnote 6.

  • 11 -

For further information please contact Orezone at +1 (778) 945 8977 or visit the Company’s website at www.orezone.com.

This announcement is authorised for ASX release by Patrick Downey, President, CEO and Director.

The Toronto Stock Exchange neither approves nor disapproves the information contained in this news release.

Qualified Person and Competent Persons Statement

Alastair Gallaugher (CGeol), Exploration Manager for Orezone, is the Qualified Person under NI 43-101 and has reviewed and approved the scientific and technical information contained in this news release.

Information in this press release that relates to exploration results is based on, and fairly represents, information and supporting documentation prepared by Mr. Gallaugher, a Competent Person who is a Member of the Geological Society of London. Mr. Gallaugher has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr. Gallaugher is an employee of the Company and consents to the inclusion in this announcement of all technical statements based on his information in the form and context in which it appears.

QA/QC

The mineralized intervals are based on a lower cut-off grade of 0.28g/t in the Oxide+Upper Transition zone, and 0.45g/t Au in the Lower Transition+Hard Rock zone. The half-core drilling samples were cut using a diamond saw by Orezone employees. The samples were prepared by BIGS Global Burkina s.a.r.l. (“BIGS Global”) and then split by Orezone to 1 kg using Rotary Sample Dividers (“RSDs”). A 1kg aliquot was analyzed for leachable gold at BIGS Global in Ouagadougou, by bottle-roll cyanidation using a LeachWellTM catalyst. The leach residues from all samples with a leach grade greater than or equal to 0.25g/t Au were prepared by BIGS Global and then split by Orezone to 50g using RSDs. A 50g aliquot was analyzed by fire assay at BIGS Global.

Orezone employs a rigorous Quality Control Program including a minimum of 10% standards, blanks and duplicates. The composite width and grade include the final leach residue assay results for most of the drill intercepts reported.

Cautionary Note Regarding Forward-Looking Statements

This press release contains certain information that constitutes “forward-looking information” within the meaning of applicable Canadian Securities laws and “forward-looking statements” within the meaning of applicable U.S. securities laws (together, “forward-looking statements”). Forward-looking statements are frequently characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate”, “potential”, “possible” and other similar words, or statements that certain events or conditions “may”, “will”, “could”, or “should” occur.

Forward-looking statements in this press release include, but are not limited to statements with respect to the exploration program and the significant exploration upside at Bomboré including that the broader system remains open at depth, along strike and outside of the currently delineated mineralized trends; the potential to materially expand the project’s resource base from the current global 5 million gold ounces, to a targeted 7 to 10 million gold ounces longer term (as an aspirational statement, being a forward-looking statement for Canadian and U.S. securities laws and not a forward-looking statement for Australian purposes) and the ongoing production expansion to 220,000 to 250,000 ounces per annum; evidence that the hanging wall and footwall of the broader 14km long

  • 12 -