Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ORE.TO ·

Orezone Clarifies Its Update ON the Bomboré Project

Regulatory & Compliance

OREZONE CLARIFIES ITS UPDATE ON THE BOMBORÉ PROJECT

September 19, 2017 - Orezone Gold Corporation (“Orezone” or the “Company”) (TSXV:ORE ),

at the request of IIROC, wishes to clarify certain disclosure in it s September 18, 2017 news

release titled “Orezone Provides an Update on the Bomboré Project .” In particular, the news

release included disclosure relating to the exploitation of the Bomboré deposit and a historic

mineral resource that is not a current mineral resource nor included in the resource statement

in the Company’s most recently filed technical report available on SEDAR at www.sedar.com,

and accordingly has been retracted.

Qualified Person(s)

Tim Miller, SME and COO, Pascal Marquis, Geo and SVP and Patrick Downey, PEng and CEO of

Orezone, are Qualified Persons under National Instrument 43 -101 and have reviewed and

approved the scientific and technical information in this release, and verified a ny technical

date disclosed in this release. Readers should refer to the annual information form of Orezone

for the year ended December 31, 2016 and other continuous disclosure documents filed by

Orezone since January 1, 2017 available at www.sedar.com, for this detailed information,

which is subject to the qualifications and notes set forth therein.

About Orezone Gold Corporation

Orezone is a Canadian company with a successful gold discovery track record and recent mine

development experience in Burkina Faso, West Africa. The Company owns a 90% interest in

Bomboré, a fully permitted, undeveloped oxide gold deposit in West Africa, which is situated

85 km east of the capital city, adjacent to an international highway.

For further information please contact Orezone at +1 (613) 241 -3699 or visit the

Company’s website at www.orezone.com.

Orezone Gold Corporation

Patrick Downey,

President and Chief Executive Officer

Tel: 1 613 241 3699 / Toll Free: 1 888 673 0663

[email protected] / www.orezone.com

2

FORWARD-LOOKING STATEMENTS AND FORWARD-LOOKING INFORMATION:

This news release contains certain “forward -looking statements” within the meaning of applicable

Canadian securities laws. Forward-looking statements and forward-looking information are frequently

characterized by words such as “plan”, “expect”, “project”, “intend”, “believe”, “anticipate”, “estimate”,

“potential”, “possible” and other similar words, or statements that certain events or conditions “may”,

“will”, “could”, or “should” occur. Forward -looking statements in this release include statements

regarding, among others; the positive drill results from the current drilling program have potential to

expand the resource, additional drill results will be released in October 2017, sensitive environmental

areas could be reinstated ;; completing of additional drilling and tests, completing a revised mineral

resource in Q1 2018; and completing a feasibility study early in the second half of 2018.

All such forward -looking statements are based on certain assumptions and analyses made by

management in light of their experience and perception of historical trends, current conditions and

expected future developments, as well as other factors management believe are appropriate in the

circumstances. These statements, however, are subject to a variety of risks and uncertainties and other

factors that could cause actual events or results to differ materially from those projected in the forward-

looking statements including, but not limited to, unexpected changes in laws, rules or regulations, or

their enforcement by applicable authorities; the failure of parties to contracts to perform as agreed;

social or labour unrest; changes in co mmodity prices; unexpected failure or inadequacy of

infrastructure, the failure of exploration programs, including drilling programs, to deliver anticipated

results and the failure of ongoing and contemplated studies to deliver anticipated results or results that

would justify and support continued studies, development or operations. Readers are cautioned not to

place undue reliance on forward-looking information or statements.

This news release also contains references to estimates of Mineral Resources and Mineral Reserves. The

estimation of Mineral Resources is inherently uncertain and involves subjective judgments about many

relevant factors. Mineral Resources that are not Mineral Reserves do not have demonstrated economic

viability. The accuracy of any such estimates is a function of the quantity and quality of available data,

and of the assumptions made and judgments used in engineering and geological interpretation, which

may prove to be unreliable and depend, to a certain extent, upon the analysis of drilling results and

statistical inferences that may ultimately prove to be inaccurate. Mineral Resource estimates may have

to be re -estimated based on, among other things: (i) fluctuations in the price of gold; (ii) results of

drilling; (iii) results of m etallurgical testing, process and other studies; (iv) changes to proposed mine

plans; (v) the evaluation of mine plans subsequent to the date of any estimates; and (vi) the possible

failure to receive required permits, approvals and licences.

Although the forward-looking statements contained in this news release are based upon what

management of the Company believes are reasonable assumptions, the Company cannot assure

investors that actual results will be consistent with these forward -looking statements. These forward-

looking statements are made as of the date of this news release and are expressly qualified in their

entirety by this cautionary statement. Subject to applicable securities laws, the Company does not

assume any obligation to update or revise t he forward-looking statements contained herein to reflect

events or circumstances occurring after the date of this news release.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.