CONSTRUCTION OF CANADIAN MALARTIC UNDERGROUND APPROVED,
INCREASING LIFE OF MINE GOLD PRODUCTION BY ~6.9 MILLION OUNCES
Montreal, February 16, 2021 - Osisko Gold Royalties Ltd ( “Osisko” or the “Corporation”) (OR: TSX &
NYSE) is pleased to announce that the Canadian Malartic Partnership ( the “Partnership”), comprising
Agnico Eagle Mines Limited (“Agnico”) and Yamana Gold Inc. (“Yamana”), have approved construction of
the Odyssey underground project (“Odyssey”) at the Canadian Malartic mine (“Canadian Malartic”).
- Royalty payments from underground production at Canadian Malartic beginning in 2023
- Average underground production of 545 koz of gold per annum from 2029 onwards (see Chart 1),
higher than previous Partnership disclosure of 400-450 koz gold per annum
- Osisko has a 3-5% net smelter return (“NSR”) royalty on the mineralization contained in the
underground mine plan
- Importantly, the majority of production is expected from deposits within Osisko’s 5% NSR royalty
boundary
- Mine life extended from 2028 to at least 2039 based on ~50% of current resources in mine plan
- US$30 million of drilling and exploration work planned in 2021 by the Partnership
- East Gouldie remains open with eleven drill rigs focused on definition and extension drilling
- Osisko also holds a C$0.40/tonne processing royalty on any ore from outside its royalty boundaries
processed through the Canadian Malartic mill, potentially adding further regional exploration upside
- Additional positive advancements announced by Agnico on the Upper Beaver and Hammond Reef
gold projects where Osisko holds a 2% NSR royalty
For more detail s, please refer to the press releases issued by each of Agnico and Yamana on
February 11, 2021 available on their respective websites.
Sandeep Singh, President and CEO of Osisko commented, “The construction decision for t he Odyssey
underground project by Agnico and Yamana secures the Canadian Malartic mine as Osisko’s flagship asset
for decades. It is difficult to over emphasize the importance of this catalyst for Osisko as Canadian Malartic
will continue to provide sustainable production until at least 2039 , with significant upside beyond . We
commend the Partnership for the exploration and engineering efforts that have led to this announcement.”
Chart 1: Canadian Malartic Production Profile
Source:
Agnico Eagle Gold
Mines and Yamana
Gold Inc. news releases,
Feb 11, 2021
2
The Odyssey project hosts three mai n underground-mineralized zones: East Gouldie, East Malartic, and
Odyssey, the latter of which is sub -divided into the Odyssey North, Odyssey South and Odyssey Internal
zones. Osisko holds a 5% NSR royalty on East Gouldie, Odyssey South and the western half of East Malartic
and a 3% NSR royalty on Odyssey North and the eastern half of East Malartic.
The East Gouldie deposit makes up 70% of the planned underground mining inventory . The Odyssey
production forecast only considers about half of the total underground resources comprising inferred
resources of 13.58 million ounces (177.5 million tonnes of 2. 38g/t gold), as well as indicated resources of
0.86 million ounces (13.3 million tonnes of 2.01g/t gold) using a gold price assumption of US$1,250 per
ounce.
Exploration drilling at East Gouldie in 2020 totaled 97,000 meters and increased the inferred mineral resource
of the East Gouldie zone by 134% . The total exploration budget for 2021 has increased to 173,400 meters
(US$30 million) focusing on further infill and expansion of East Gouldie and regional targets. East Gouldie
alone will benefit from 141,400 metres of drilling which is ~80% of the total that has been drilled on East
Gouldie to date.
An NI 43 -101 Preliminary Economic Assessment technical report for the Canadian Malartic operation is
expected to be filed by the Partnership in March 2021 and will include a summary of the Odyssey
underground project. More detail s can be found in the Agnico and Yamana press releases dated
February 11, 2021 titled “Agnico Eagle Reports Fourth Quarter and Full Year 2020 Results” and “Yamana
Gold Reports Strong Fourth Quarter and Full Year 2020 Results”, respectively.
Upper Beaver and Hammond Reef Updates
Agnico also provided an update on potential growth opportunities beyond 2024, highlighting two projects on
which Osisko has a 2% NSR royalty – the Upper Beaver project in Kirkland Lake Ontario and the Hammond
Reef project in Northwestern Ontario.
As of December 31, 2020, Upper Beaver has approximately 1.4 million ounces of gold and 20,000 tonnes of
copper in underground probable mineral reserves (8.0 million tonnes grading 5.43 g/t gold and 0.25%
copper); Agnico Eagle’s Kirkland Lake property al so hosts the Upper Canada, AK and Anoki -McBean
deposits; which together with Upper Beaver host an additional indicated resource of 1.71 million ounces
(17.2 million tonnes of 3.09g/t gold) and inferred resources of 4.07 million ounces (32.2 million tonnes of
3.93g/t).
In 2021, Agnico plans to drill 36,500 meters at Upper Beaver including additional shallow drilling to test an
open pit concept and further deep drilling to convert mineral resources to mineral reserves. An internal
technical study at Upper Beaver, incorporating drill results from 2020 and 2021, is expected to be completed
by the end of 2021.
At Hammond Reef , an internal technical study was completed by Agnico in 2020, which resulted in the
declaration of Agnico Eagle’s first mineral reserves for the project. Open pit mineral reserves are estimated
at 3.32 million ounces of gold (123.5 million tonnes grading 0.84 g/t gold). In addition, the project contains
2.3 million ounces of measured and indicated mineral resources (133.4 million tonnes grading 0.54 g/t gold).
The internal s tudy results showed average annual gold production of approximately 272,000 ounces at
average total cash costs of US$748 per ounce and average AISC of US$806 per ounce. Using a gold price
of US$1,550 per ounce, and a C$/US$ foreign exchange rate assumption of 1.30, the Hammond Reef project
has an after-tax IRR of 9.8% and an after-tax NPV (at a 5% discount rate) of approximately $245 million USD.
Agnico will continue to evaluate optimization of the project and potential mining scenarios to further improve
project economics.
3
Qualified Person
The scientific and technical content of this news release has been reviewed and approved by
Guy Desharnais, Ph.D., P.Geo., Vice President, Project Evaluation at Osisko Gold Royalties Ltd, who is a
“qualified person” as defined by National Instrument 43 -101 – Standards of Disclosure for Mineral Projects
(“NI 43 -101”). The Partnership’s report includes inferred mineral resources that are too speculative
geologically to have economic considerations applied to them that would enable them to be categorized as
mineral reserves and there is no certainty that the forecast production amounts will be realized.
About Osisko Gold Royalties Ltd
Osisko is an intermediate precious metal royalty comp any focused on the Americas that commenced
activities in June 2014. Osisko holds a North American focused portfolio of over 140 royalties, streams and
precious metal offtakes. Osisko’s portfolio is anchored by its cornerstone asset, a 5% net smelter return
royalty on the Canadian Malartic mine, which is the largest gold mine in Canada.
Osisko’s head office is located at 1100 Avenue des Canadiens -de-Montréal, Suite 300, Montréal, Québec,
H3B 2S2.
For further information, please contact Osisko Gold Royalties Ltd:
Heather Taylor
Vice President, Investor Relations
Tel: (514) 940-0670 #105
Email: [email protected]
Forward-looking Statements
Certain statements contained in this press release may be deemed “forward ‐looking statements” within the meaning of
applicable Canadian and U.S. securities laws. These forward ‐looking statements, by their nature, require Osisko to make
certain assumptions and necessarily involve known and unknown risks and uncert ainties that could cause actual results to
differ materially from those expressed or implied in these forward ‐looking statements. Forward ‐looking statements are not
guarantees of performance. These forward‐looking statements, may involve, but are not limited to, statements with respect to
the timely construction and the expected life of mine production of the Odyssey underground project, and the potential for
discovery and further development of additional underground mineral zones; the potential for growth opportunities at Hammond
Reef and Upper Beaver properties and the result of any drilling program, future events or future performance, the realization
of the anticipated benefits deriving from Osisko’s investments, the general performance of the assets of Osisko, and the results
of development exploration and production activities as well as expansions projects relating to the properties in which Osisk o
holds a royalty, stream or other interest. Words such as “may”, “will”, “would”, “could”, “expect”, “be lieve”, “plan”, “anticipate”,
“intend”, “estimate”, “continue”, or the negative or comparable terminology, as well as terms usually used in the future and the
conditional, are intended to identify forward‐looking statements. Information contained in forward‐looking statements is based
upon certain material assumptions that were applied in drawing a conclusion or making a forecast or projection, including,
without limitation, management’s perceptions of historical trends; current conditions; expected future developments; the
ongoing operation of the properties in which Osisko holds a royalty, stream or other interest by the operators of such properties
in a manner consistent with past practice; the accuracy of public statements and disclosures made by the ope rators of such
underlying properties; no material adverse change in the market price of the commodities that underlie the asset portfolio; n o
adverse development in respect of any significant property in which Osisko holds a royalty, stream or other intere st; the
accuracy of publicly disclosed expectations for the development of underlying properties that are not yet in production; and the
absence of any other factors that could cause actions, events or results to differ from those anticipated, estimated or intended.
Osisko considers its assumptions to be reasonable based on information currently available, but cautions the reader that their
assumptions regarding future events, many of which are beyond the control of Osisko, may ultimately prove to be incorr ect
since they are subject to risks and uncertainties that affect Osisko and its business. Such risks and uncertainties include,
among others, that the financial information presented in this press release is preliminary and could be subject to adjustments,
the successful continuation of mining activities in Québec and more particularly of the operations underlying the Corporation’s
assets, the performance of the assets of Osisko, the growth and the benefits deriving from its portfolio of investments, risk s
related to the operators of the properties in which Osisko holds a royalty, stream or other interest, including changes in th e
ownership and control of such operators; risks related to development, permitting, infrastructure, operating or technical
4
difficulties on any of the properties in which Osisko holds a royalty, stream or other interest, the influence of macroeconomic
developments as well as the impact of and the responses of relevant governments to the COVID -19 outbreak and the
effectiveness of such responses.
For additional information with respect to these and other factors and assumptions underlying the forward ‐looking statements
made in this press release, see the section entitled “Risk Factors” in the most recent Annual Information Form of Osisko which
is filed with the Canadian securities commissions and available electronically under Osisko’s issuer profile on SEDAR at
www.sedar.com and with the U.S. Securities and Exchange Commission and available electronically under Osisko’s issuer
profile on EDGAR at www.sec.gov. The forward ‐ looking statements set forth herein reflect Osisko’s expectations as at the
date of this press release and are subject to change after such date. Osisko disclaims any intention or obligation to update or
revise any forw ard‐looking statements, whether as a result of new information, future events or otherwise, other than as
required by law.