Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OOR.V ·

Opus One Resources Begins a Drilling Program ON Its Fecteau Property, Located IN Urban-Barry Township, Quebec, Canada

Exploration Programs

4710 Saint-Ambroise Street, Suite 308

Montreal, Québec, H4C 2C7

Tel: (514) 591-3988

[email protected]

NEWS RELEASE

April 5, 2018 Trading Symbol: OOR-V

OPUS ONE RESOURCES BEGINS A DRILLING PROGRAM ON ITS FECTEAU

PROPERTY, LOCATED IN URBAN-BARRY TOWNSHIP, QUEBEC, CANADA

MONTREAL, QC - OPUS ONE Resources Inc. (the “Company” or “OPUS ONE ”) – (TSX

Venture Exchange: OOR), is pleased to announce the beginning of a 1,500 meter drilling program,

in 10 drill holes, on its Fecteau property. The property is located in the Barry-Windfall gold district

where several exploration companies are extremely active, including Osisko Minin g at Windfall

and Metanor at Barry. The company’s objective is to drill a high priority target identified by

prospecting, trenching and channel sampling during the summer of 2017.

The drilling will focus on a new gold discovery exposed in a trench over 38 meters. The trench

uncovered a new EW trending steeply dipping mineralized zone comprised of a 1-2m thick quartz

vein with sulfides hosted in an altered and sheared quartz porphyry intrusion. The quartz vein and

the stockwork envelope are highly anomalous in gold over all the exposed area. Best values are

shown in the table below.

Channel # Weighted Avg

g/t Au Length m Lithology

03 1.84 1.35 Quartz vein and stockwork

05 2.32 0.91 Quartz stockwork

06 2.39 3.05 Quartz vein and stockwork

07 2.21 2.92 Quartz vein and stockwork

08 2.29 0.60 Stockwork

09 2.03 0.89 Stockwork

11 7.09 0.50 Quartz vein

The drilling will proceed will one drill rig. Holes will initially be spaced by 50 meters laterally.

A first series of holes will target the 50 meter level and a second series the 100 meter level (100 m

below surface). The main objective is to define the lateral extension of the structure as it was only

possible to uncover it over 38 meters due to thick overburden on both ends of the trench.

Mr. Louis Morin, CEO, states: "This drill program on our Fecteau property will focus on the

totally new zone, recently discovered during our 2017 trenching program. This program will

allow us to verify the zone extension, where trenching was not possible, and it will provide us

with information to prepare for the next exploration program phase."

Fecteau is a gold property which consists of 90 mining claims covering an area of 5,078 hectares

located in the highly prospective Urban- Barry greenstone belt, 30 kilometers east of the Osisko

Mining Windfall Lake and Lynx projects. The property is easily accessible via a good network of

logging roads. The area is underlain by rocks of Archean age of the Fecteau formation. The

property contains 8 historical gold and base metals (Cu and Zn) occurrences with gold grades

varying from 1 g/t to up to 8 g/t and was mainly explored for base metal deposits in the past. The

property is surrounded by Osisko Mining claims.

Mr. Tony Brisson P.Geo. is acting as qualified person (as defined by NI 43-101) for Opus One and

has reviewed and approved the scientific and technical information in this press release.

About OPUS ONE Resources Inc.

Opus One Resources I nc. is a mining exploration company focused on discovering high quality

gold and base metals deposits within strategically located properties in proven mining camps,

sometimes close to existing mines in the Abitibi Greenstone Belt, north-western Quebec and north-

eastern Ontario - one of the most prolific gold mining areas in the world. Opus One holds assets

in Val -d'Or, Matagami and Chibougamau areas. Bachelor Extension property is adjacent to

Metanor Resources Inc.- Bachelor Gold Mine, Vezza Extension and Vezza North are located few

kilometers West and North of Nottaway Resources Vezza Mine. Courvillle property is located

east of Val D’Or.

In addition, Opus One has also optioned three properties, all easily accessible by a network of all

season roads : Fecteau property, located in the Urban -Barry greenstone belt, east of Osisko

Mining’s Windfall Lake deposit, currently one of the most active exploration area in Canada;

Winwin property, located directly North of Iamgold’s Monster Lake property, and the Grizzly

property, located 40 kilometers north-west of the city of Chapais in a similar geological setting to

Northern Superior’s Croteau East project.

Tony Brisson, P. Geo and director of Opus One, acts as a Qualified Person as defined in National

Instrument 43-101 and has reviewed and approved the technical information in this press release.

Forward-Looking Statements

This news release contains statements that may constitute "forward-looking information" within

the meaning of applicable Canadian securities legislation. Forward-looking information may

include, among others, statements regarding the future plans, costs, objectives or performance of

OPUS ONE, or the assumptions underlying any of the foregoing. In this news release, words

such as "may", "would", "could", "will", "likely", "believe", "expect", "anticipate", "intend",

"plan", "estimate" and similar words and the negative form thereof are used to identify forward-

looking statements. Forward-looking statements should not be read as guarantees of future

performance or results, and will not necessarily be accurate indications of whether, or the times

at or by which, such future performance will be achieved. No assurance can be given that any

events anticipated by the forward-looking information will transpire or occur, including the

development of the Grizzly Property, or if any of them do so, what benefits OPUS ONE will

derive. Forward-looking information are based on information available at the time and/or

management's good-faith belief with respect to future events and are subject to known or

unknown risks, uncertainties, assumptions and other unpredictable factors, many of which are

beyond OPUS ONE Resources Inc.' control. These risks, uncertainties and assumptions include,

but are not limited to, those described under "Risk Factors” in OPUS ONE’s management

discussion and analysis for the year ended August 31, 2016, a copy of which is available on

SEDAR at www.sedar.com, and could cause actual events or results to differ materially from

those projected in any forward-looking statements. OPUS ONE does not intend, nor does OPUS

ONE undertake any obligation, to update or revise any forward-looking information contained in

this news release to reflect subsequent information, events or circumstances or otherwise, except

if required by applicable laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

For more information, please contact:

Louis Morin, CEO & Director

T (514) 591-3988

[email protected]

Michael W. Kinley, CPA, CA

President, CFO & Director

T (902) 826-1579

F (902) 826-2550

C (902) 402-0388

[email protected]

Visit Opus One’s website: www.OpusOneResources.com