ONGold Returns 14.59 g/t Au over 9.6 m (core length) From Re-logging Program at Monument Bay Gold-Tungsten Project and Awards Contract to Prepare Updated NI 43-101 Mineral Resource Estimate

Drill Results

ONGold Returns 14.59 g/t Au over 9.6 m (core

length) From Re-logging Program at Monument

Bay Gold-Tungsten Project and Awards

Contract to Prepare Updated NI 43-101 Mineral

Resource Estimate

Toronto, Ontario--(Newsfile Corp. - January 26, 2026) - ONGold Resources Ltd. (TSXV: ONAU)

(OTCQB: ONGRF) (the "

Company

" or "

ONGold

") is pleased to announce that SRK Consulting

(Canada) Inc. has been awarded the contract to prepare an updated mineral resource estimate for gold

and tungsten in accordance with National Instrument 43-101 -

Standards Of Disclosure In Mineral

Projects

("

NI 43-101

") on the Monument Bay project located in northeastern Manitoba (Figure 1).

The

Monument Bay gold and tungsten project represents a district-scale exploration opportunity with

significant gold and tungsten mineralization over a 4.2 km strike length along the Twin Lakes Shear Zone

("

TLSZ

"). Monument Bay is an advanced stage exploration asset with over 233,000 meters drilled in

more than 800 diamond core holes, while still having substantial exploration upside both within the

known deposits and along underexplored satellite zones.

The main deposit has been historically drill tested by 615 holes totalling 172,147 meters over a strike

length of 4.2 kilometers.

Additionally, the deposit remains open at depth and is largely untested by

drilling below a vertical depth of 300 meters from surface, presenting significant potential for resource

expansion through deeper exploration and future drill testing.

The Company's most recent technical report dated May 30, 2025 titled "

Technical Report on the

Monument Bay Project Manitoba,

" which was filed on the Company's SEDAR+ profile on June 13,

2025 (the "

Technical Report

") references historical estimates of 2.3 million gold ounces (58.0 million

tonnes at an average grade of 1.24 g/t) in the "Measured" and "Indicated" Mineral Resources

categories, and 720,000 gold ounces (24.4 million tonnes at an average grade of 0.92 g/t) in the

"Inferred" Mineral Resources category at a gold price of US$1,200. Please see the "Historical Resource

Estimate Review" section of this news release below for further information.

Progress Highlights:

SRK awarded contract to provide an updated NI 43-101 resource including QP advancing

tungsten assessment.

The best gold assay results from the 2025 summer re-logging, infill and core re-sampling program

of 10 historical drill holes (305 core samples) are summarized on Table 1 and include:

GSC-04-04: 14.59 g/t Au over a core length of 9.60 m (90.50 to 100.10m) including 19.7 g/t

Au over a core length of 6.60m (93.50 to 100.10) in the Lake Shoot.

Samples were taken

from this core interval by the previous operator, but assay results are missing.

Mineralization

and alteration were observed throughout this interval, so the core was re-sampled to obtain

the missing assay data. Results for rubbled/incomplete core may not be representative of the

true grade.

TL-04-198 (Re-assay by ONGold): 1.13 g/t Au over 26.90m (281.00 to 307.90m) in the

Camp Shoot. For context, historic assays from 2003 over a similar interval averaged 0.86 g/t

Au. Differences may reflect sampling, analytical methods and interval definitions.

TL-07-340: 1.94 g/t Au over a core length of 14.14m (310.00 to 324.14m) in the Simmons

Shoot; Again, samples were taken from this core interval, but assay results were missing.

Mineralization and alteration were observed throughout this interval, so the core was re-

sampled to obtain the missing assay data.

The assay results from 375 core samples collected in the fall of 2025 as part of the continued

re-logging program completed in October/November are pending.

A total of 41 drill holes totaling 7,691 m in 10 drill sections relogged in 2025 with 37 holes totaling

an additional 3,295 m in eight (8) sections presently underway.

2026 gold and tungsten resource estimate will include the addition of the following:

59 historical drill holes totaling 18,000 m not integrated into former resource estimate.

Over 12,000 missing historical tungsten pulps including 81 gold pulps collected with assay

results pending.

Infill core sampling program; an additional 680 split core samples for gold and tungsten

collected in 2025; Winter 2026 infill core sampling is currently underway that will provide

additional assays results for the resource update.

Figure 2 of the "Camp Shoot" section 504950E shows strong, continuous gold mineralization from

near surface 1.45 g/t Au over 41.2 m (core length) through 1.40 g/t over 80.2m (core length) and

1.13 g/t Au over 26.9 m (core length), extending to roughly 300 m vertical depth).

Continued re-logging of historical drill core, along with a comprehensive re-interpretation of remaining

drill sections across the deposit, will strengthen the structural framework and refine the resource block

model, thereby enhancing the overall geological understanding of the deposit.

The 2017 resource

estimate was based on a gold price of US$1,200 per ounce.

With gold prices now above US$4,800 per

ounce and tungsten mineralization factored into the evaluation, the deposit's economic outlook is

positioned for a significant boost.

Kyle Stanfield CEO and a Director of ONGold commented: "We are extremely pleased to be moving

forward with a proven technical team to advance a new resource estimate of the Monument Bay gold

and tungsten deposit.

The core relogging, infill and pulp sampling program completed to date has

resulted in deepening our geological understanding of the property geology, the structural control

mechanisms of gold and tungsten mineralization and the potential for continued resource development of

the Monument Bay deposit.

In this new gold price environment combined with a renewed push by

western governments to re-shore tungsten production, we believe Monument Bay will present a very

compelling resource story as we look to publish a new resource estimate in 2026".

Figure 1: Monument Bay Au-W Deposit; Historical Drilling Plan View

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10770/281434_figure_1_002.jpg

Tungsten - A Critical Mineral Unlike Any Other

Tungsten is designated as a critical mineral by multiple governments including the Canada, United

States, European Union, and Australia. Tungsten is under consideration by several jurisdictions,

including Manitoba.

These designations reflect tungsten's growing importance to economic security,

national defense, lack of substitutes, and vulnerable supply chains.

Presently, over 80% of the world

tungsten supply is sourced from China.

Key tungsten market drivers:

Defense & Aerospace: Ongoing geopolitical tensions and military modernization.

Industrial Manufacturing: Continued demand for cutting tools and wear parts.

Clean Energy Transition: Solar panel production, EV infrastructure.

Table 1 - Selected Gold Intervals (Core Re-sampling Program, Summer 2025)

Hole No.

g/t Au

Length (m)

From (m)

To (m)

Zone

TL-04-198

**

3.50

3.00

281.00

284.00

HW

and Re-assay

1.13

26.90

281.00

307.90

Main

including

0.93

20.50

287.40

307.90

Main

including

3.62

2.00

304.90

306.90

Main

TL-07-340***

1.94

14.14

310.00

324.14

Main

including

2.06

13.14

311.00

324.14

Main

including

2.35

11.10

311.00

322.10

Main

including

3.66

1.10

311.00

312.10

Main

including

5.21

0.70

320.30

321.00

Main

GSC-04-04*

14.59

9.60

90.50

100.10

Main

including

16.06

8.70

91.40

100.10

Main

including

6.67

0.40

91.90

92.30

Main

including

7.09

0.60

92.90

93.50

Main

including

****

19.70

6.60

93.50

100.10

Main

Notes: Zone Names HW=Hanging Wall; Main= Main Gold Domain; FW=Foot Wall;

*Lake Shoot; ** Camp Shoot; *** Simmons Shoot; ****1/4 split

rubbled core (potentially incomplete with all taken);

Bolded

= g/t Au X length (m) = >25.0 gram-meters. All reported intervals are down-hole core

lengths. True widths are unknown at this time and will be refined with additional structural modeling. Composites are length-weighted; no top cuts

have been applied unless stated.

Figure 2: Drill Section 504950E: Relogging by ONGold Versus Yamana Gold

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10770/281434_f412bab7d4dddb72_001full.jpg

2025 Field Program Highlights

A field evaluation of 38 targets across the property has confirmed that the Main Deposit, its

western strike extension along the Twin Lakes Shear Zone (TLSZ), the Mid-East Zone, and the AZ

Central Zone continue to represent the four high-priority exploration targets on the property (see

ONGold, July 7, 2025 Press Release defining targets and Figure 3 below).

Figure 3: Summer 2025 - 38 Targets Investigated Across the Property

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10770/281434_figure_3_002.jpg

Makataysip Lake (M2) is a new target area identified in the extreme western portion of the

property along the TLSZ.

This area consists of structural complex folded iron formations overlying a

large magnetic low geophysical anomaly.

Current field work and historical 1991 drilling identified

numerous felsic dyke swarms in this area where 2002 soil sampling found slightly elevated Au, As,

Mo anomalies requiring further field investigation.

Airborne Survey Completed (Entire Property): Lidar and orthophotography survey results have

identified areas within known regional deformation zones where outcrop might be exposed at

surface for future field investigative work.

All the historical drill cores stored at the Twin Lakes exploration camp was inventoried with holes

going back as far as 1989 identified and referenced.

In the late fall of 2025, a 33.8 line-km ground Induced Polarization (IP) survey was completed along

selective north-south trending lines across the deposit, its western strike extension along the TLSZ

and over the AZ/Central Zone area. The survey targeted depths of up to 300 meters from surface.

Final survey results are being assessed as part of a potential drilling program planned for late

2026/early 2027.

Historical Resource Estimate Review

The last official gold resource estimate was completed in 2017 by Yamana Gold and did not include

tungsten.

ONGold's published NI 43-101 technical report published on SEDAR+ in 2025 discloses a

historical gold mineral estimate of approximately 2.3 million gold ounces (58.0 million tonnes at an

average grade of 1.24 g/t) in the "Measured" and "Indicated" Mineral Resources categories, and

720,000 gold ounces (24.4 million tonnes at an average grade of 0.92 g/t) in the "Inferred" Mineral

Resources category (see Press Release Dated June 13, 2025). This consists of in-pit resources above

a cut off grade of 0.30 g/t gold.

These historical mineral estimates, although compliant with NI 43-101 guidelines at the time they were

prepared, are historical and should not be considered current. A qualified person has not completed

sufficient work to classify this historical estimate as current mineral resources or mineral reserves and

accordingly it should not be relied upon. The author and the Company are not treating the historical

estimate as current mineral resources or mineral reserves. To verify the historical estimate, a qualified

person needs to review the historical data, review any work completed at Monument Bay since the date

of the historical estimate and complete a new mineral resource estimate. The author of the Technical

Report and the Company view this historical estimate as a conceptual indication of the potential size and

grade of the gold-tungsten deposit in the area, and this information is relevant to ongoing exploration

efforts.

All gold mineralization within the deposit is hosted within or in association with a highly altered

felsite/porphyry dyke along the strike length of the deposit within the TLSZ.

In the western half of the

deposit, the adjoining host rocks are primarily highly altered felsic to intermediate volcanic rocks

grading eastward into more volcanoclastic/sedimentary host rocks.

Historical domain modeling of the gold deposit, which has in the past consisted of multiple and

complex domains, has been replaced with a simplified single-domain model. This new approach

is based on the mine-ability of the gold-bearing felsite/porphyry dyke and more accurately reflects

the geological and structural controls-such as veins and breccias- associated with gold

mineralization along the TLSZ structure.

There is potential for a larger and thicker gold-bearing porphyry system at depth beneath the

current resource area. This hypothesis may be supported in the future by deeper targeted Induced

Polarization (IP) survey programs, which could reveal deeper zones of disseminated sulfide

mineralization commonly associated with porphyry-style gold systems.

Monument Bay still has significant potential for resource expansion and resource conversion

opportunities throughout the deposit and infill diamond drilling of both in-pit and underground

identified resources is warranted.

A Phase I drilling program will be considered after the new NI

43-101 resource is published.

No mineral reserves have been defined at Monument Bay.

Sampling, QA/QC and Analytical Methods

Quality Assurance/ Quality Control ("

QA/QC

") procedures were executed to ensure all work is conducted

in accordance with best practices.

Drill core of various sizes was logged and sampled by Company

personnel.

Sample sizes respect both geological and mineralized contacts and generally range from 0.3m to a

maximum length of 1.0m.

Drill is cut in half, or quartered (historical core), with the other half retained for

future verification.

The other half of the core is placed in strong plastic sample bags, a sample tag placed

in the bag and the bag numbered, with a permanent magic marker with the sample number. Coarse

blanks and certified reference standards (Oreas) as inserted by the geologist into the sample stream

every 10

th

sample.

Each bag is then individually sealed using strong zip ties.

Sample batches of ten (10)

are placed in security tag-sealed rice bags for shipment to the laboratory.

Sample submission forms are

completed as a part of the chain-of-custody tracking process with sample dispatched to the laboratory

with ONGold personnel or contracted courier services.

Samples are then analyzed at Actlabs in Thunder Bay, Ontario, the company's primary analytical

laboratory.

ONGold always uses labs that are both ISO 17025 and ISO 9001 certified.

Upon receiving

the samples, the laboratory sends ONGold a sample submission confirmation email verifying that the

samples have been received and will advise if any security tracking tags have been tampered with or

lost in the process.

At the lab, samples are organized for internal tracking, dried and prepared using RX1 sample

preparation handling.

The entire sample is crushed to a nominal -2 mm, mechanically split to obtain a

representative sub-sample and then pulverized to at least 95% -105 microns (μm). All steel mills are mild

steel and do not introduce Cr or Ni contamination.

Samples are initially analyzed by 50-gram fire assay

with atomic absorption finish (1A2-50).

Any sample assaying greater than 5.0 g/t Au is re-assayed by

fire assay gravimetric analyses (1A3-50) which has an upper detection limit of 10.0 g/t Au.

Samples

exceeding 10.0 g/t Au or those samples identified as containing visible gold are analyzed by 1,000-gram

gold-fire assay metallic screen analysis (1A4-1000).

Geochemical analyses consist of near total digestion analyses for 35 elements, including tungsten, by

ICP which has a maximum detection limit for tungsten (W) of 10,000 ppm.

Overlimit samples for tungsten

are analyzed using XRF (Code 8-XRF W).

If a coarse blank or certified reference standard fails, then

five (5) samples on either side of the failed samples are re-assayed by the lab, including the standard,

and if the issue has been resolved, the new assays are entered as finals in the database.

Once all the final assay reports are received, 10% of the pulps are dispatch from Actlabs directly to a

secondary laboratory for assay verification as part of the QA/QC procedures; in this case AGAT

Laboratories in Thunder Bay.

For field samples, 5% of the samples are dispatched for verification.

Qualified Persons

The scientific and technical information in this news release has been reviewed and approved by Paul

Dunbar, P.Geo., Vice President, Exploration of ONGold, and by Wally Dzick, P.Geo., an independent

geological consultant to ONGold. Each is a Qualified Person under NI 43-101. Mr. Dunbar is not

independent of the Company.

About ONGold Resources Ltd.

ONGold Resources Ltd. owns significant exploration assets in Northern Ontario and Northern Manitoba,

including the district-scale Monument Bay Gold-Tungsten Project, TPK Gold Project, Domain Gold

Project and October Gold Project. These projects represent a strategic footprint in one of Canada's

most prolific gold-producing regions.

ONGold Resources Ltd. on behalf of the Board of Directors

Kyle Stanfield, Chief Executive Officer & Director

Contact Information

Kyle Stanfield

Chief Executive Officer

Telephone: 1 (855) 525-0992

Email:

[email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Forward-Looking Information

This news release contains 'forward-looking information' and 'forward-looking statements' within the

meaning of applicable Canadian securities laws (together, 'forward-looking information'). Forward-

looking information herein includes, but is not limited to, statements regarding the timing, scope and

results of the updated mineral resource estimate, the interpretation of geological information, the

potential for resource expansion and conversion, planned sampling, surveys and drilling, and the timing

of future work programs. Forward-looking information is based on reasonable assumptions made by

management at the date hereof, including assumptions regarding current and planned exploration

activities, availability of financing, commodity prices, permits, laboratory turn-around times, and general

business and economic conditions. Forward-looking information is inherently subject to known and

unknown risks and uncertainties that may cause actual results to differ materially, including risks related

to exploration, sampling and assay results, geological interpretation and model risk, commodity price

volatility, access, permitting and environmental matters, financing, contractor and equipment availability,

and regulatory approvals. Readers are cautioned not to place undue reliance on forward-looking

information. The Company does not undertake to update any forward-looking information except in