Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

ONAU.V ·

ONGold Announces Updated Mineral Resource Estimate for the Monument Bay Gold Project, Manitoba

Resource Estimates

ONGold Announces Updated Mineral Resource

Estimate for the Monument Bay Gold Project,

Manitoba

Toronto, Ontario--(Newsfile Corp. - September 14, 2026) - ONGold Resources Ltd. (TSXV: ONAU)

(OTCQB: ONGRF) (the "

Company

" or "

ONGold

") announces an updated Mineral Resource Estimate

("

MRE

") for the Monument Bay Gold Project in northeastern Manitoba (Figure 1), effective July 31, 2026.

The 2026 MRE was prepared by SRK Consulting (Canada) Inc. ("

SRK

") in accordance with the CIM

Definition Standards for Mineral Resources and Mineral Reserves adopted by the Canadian Institute of

Mining, Metallurgy and Petroleum ("

CIM Definition Standards

") and National Instrument 43-101 -

Standards of Disclosure for Mineral Projects ("

NI 43-101

").

Highlights:

Open-pit constrained Measured and Indicated Mineral Resources: 74.39 million tonnes at 0.84 g/t

Au containing 2.0 million ounces of gold (Table 1)

Open-pit constrained Inferred Mineral Resources: 24.46 million tonnes at 0.62 g/t Au containing

0.49 million ounces of gold (Table 1).

The Mineral Resources are constrained within a conceptual pit shell and reported above a 0.20 g/t

Au cut-off grade, using a gold price of US$3,000, recovery and other assumptions summarized in

the notes to Table 1, to demonstrate reasonable prospects of eventual economic extraction.

Approximately 80% of the contained gold in the 2026 MRE is classified as Measured and

Indicated.

The updated MRE incorporates revised geological and mineralization modelling, structural

interpretation, core re-logging and additional assay information.

The MRE incorporates 833 historical diamond drill holes totaling approximately 237,021 metres

across the 4.2-kilometre Twin Lakes Shear Zone ("

TLSZ

").

Additional mineralized areas have been identified within, below and beyond the current pit shell for

follow-up drilling.

SRK has proposed an initial Phase I diamond drilling program of approximately 20 holes totaling

11,150 metres to test the continuity and extent of higher-grade gold domains in the central and

eastern portions of the deposit, including areas below and beyond the current conceptual open-pit

shell.

While tungsten was not included in the 2026 MRE, ONGold's recent re-logging, infill sampling and

pulp re-analysis program substantially improved the tungsten database and supports further

evaluation of tungsten distribution, geological controls and its association with higher-grade gold

mineralization.

Table 1: Mineral Resource Statement for the Monument Bay Project, Manitoba, SRK

Consulting (Canada) Inc., effective July 31, 2026*

Class

Tonnage (kt)

Au (g/t)

Au (koz)

Measured

18,859

1.00

606

Indicated

55,531

0.79

1,403

Measured and Indicated

74,390

0.84

2,009

Inferred

24,456

0.62

491

*Notes: (1) Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. (2) Open-pit Mineral Resources are

reported within a conceptual pit shell above a 0.20 g/t Au cut-off grade. The conceptual pit shell and cut-off grade use a gold price of US$3,000

per ounce and a variable gold recovery ranging from 88.5% to 94.5%, based on gold grade. (3) Tonnages and grades have been rounded to

reflect the relative accuracy of the estimate; totals may not add due to rounding. (4) The effective date of the MRE is July 31, 2026.

Figure 1: Map Showing the Location of ONGOLD Projects including the Monument Bay

Project, Manitoba

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_001full.jpg

SRK is completing the NI 43-101 technical report supporting the 2026 MRE, which the Company will file

under its issuer profile on SEDAR+ within the period prescribed by NI 43-101.

ONGold does not

consider any pre-existing historical Mineral Resource Estimates as current.

The MRE is not directly

comparable with historical estimates previously prepared for the Monument Bay Project because it uses

different geological interpretations, mineralization domains, estimation and classification

methodologies, and economic assumptions. This MRE incorporates ONGold's updated geological and

structural interpretation, core re-logging and additional assay information, together with SRK's

geological and mineralization models and estimation methodology constrained within a conceptual

open-pit shell.

Kyle Stanfield, Chief Executive Officer and a director of ONGold, commented: "The completion of a

mineral resource estimate prepared in accordance with NI 43-101 for the Monument Bay gold deposit is

a very important milestone for ONGold. With a 2.0-million-ounce gold resource classified as Measured

and Indicated representing 80% of the contained ounces, and approximately 0.5 million ounces of gold

classified as Inferred Mineral Resources, the 2026 MRE establishes a substantial open-pit-constrained

gold resource. The updated geological interpretation has greatly improved our understanding of the

structural controls on mineralization and identified priority areas for additional resource drilling as the

deposit remains open at depth.

We are encouraged by the opportunity to test mineralization at depth

particularly along the eastern portion of the deposit where gold grades from historical drilling are

demonstrably higher. While the new resource estimate does not include tungsten, the updated gold block

model will support a more targeted evaluation of the association between gold and tungsten as part of

additional technical studies underway.

We are grateful for the continued very strong support from both

the local First Nations communities as well as the Government of Manitoba as we continue to advance

the Monument Bay gold deposit in 2027 and beyond."

Updated Geological Model

ONGold completed a comprehensive geological reinterpretation of the Monument Bay deposit and SRK

developed lithology and mineralization models (Figure 2). The work incorporated a revised geological

and structural interpretation, historical drill-hole data, core re-logging and additional assay information.

The new lithological model simplifies the geological coding into the principal intrusive, volcanic,

sedimentary and overburden units. The I2 felsic porphyry dyke/sill is a principal geological unit

associated with gold mineralization throughout the deposit. Leapfrog Geo

©

software was used to

develop the three-dimensional geological model using available logged geology, including ONGold's re-

logging data where available.

Gold Mineralization Model

SRK's gold mineralization model consists of two principal volume components: a number of high-grade

mineralization volumes defined using a minimum domain using a grade threshold of 1.0 g/t Au together

with geological and structural criteria and a relatively low-grade mineralization grade volume domain

defined using a grade threshold of 0.30 g/t Au and (Figure 3).

The high-grade model integrates grade with geological characteristics including silicification, host-

rock controls, stockwork, breccia and vein development, and sericitization.

SRK interpreted several structural controls on higher-grade mineralization, including mineralized

zones associated with the I2 dyke and I2-volcanic contacts and structures related to D3

deformation and shearing.

The low-grade mineralization model recognizes multiple grade populations outside the high-grade

zones and is not solely constrained within the I2 felsic intrusive unit. The threshold value was

selected based on a statistical evaluation of gold assays outside the high-grade structures and

was guided by ONGold's interpretation of re-logged drill sections.

The remaining I2 intrusive and volcanic volume outside the modelled high-grade structures and

0.30 g/t grade volume was treated as a separate domain during grade estimation.

Figure 2: Monument Bay Deposit - Updated Lithological Model (SRK, 2026)

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_002full.jpg

Figure 3: Monument Bay Deposit - Gold Mineralization Model (SRK, 2026)

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_003full.jpg

Mineral Resource Estimation and Classification

The exploration database was compiled and maintained by ONGold and was audited by SRK. The

geological model, the gold mineralization wireframes, and the MRE were constructed for Monument Bay

by SRK from a geological interpretation developed in collaboration with ONGold. The Mineral Resource

estimation process included data verification, statistical and geostatistical analysis, variography, grade

estimation and classification in accordance with the CIM Definition Standards for Mineral Resources

and Mineral Reserves (May 2014).

Mineral Resource estimation was completed in Leapfrog Geo© software. A total of 32 estimation

domains were defined based on the mineralization model: the high-grade vein structures (domains 901

to 930), the 0.30 g/t grade volume (domain 100) and rest of the modelled volume outside 0.30 g/t grade

volume (domain 200).

Assays were composited to a length of 1.0 m while respecting estimation domain

boundaries. The composited data was reviewed to identify any potential outliers and assess the need to

cap the data. Capping values were applied to some estimation domains: 30 g/t for domain 100,

between 8 g/t and 55 g/t for high-grade structures, and 10 g/t for domain 200. Variogram models were

generated to evaluate the spatial continuity of gold grades within selected domains. Gold grades were

estimated into the block model, with parent block size of 10 x 5x10 meters, using Ordinary Kriging (OK)

and Inverse Distance (ID) to the power of three. The general estimation strategy involves up to three

estimation passes with progressively relaxed search ellipsoids and data requirements.

Mineral Resource classification criteria included drill-hole spacing, data quality and QA/QC, geological

and grade continuity, estimation confidence and the QP's professional judgment. The following drill-hole

spacing criteria generally supported, but did not solely determine, classification:

Measured: Up to 30 m of drillhole spacing. Areas with confidence in geological model, within

modelled I2 intrusive and volcanics, were only considered for Measured class.

Indicated: Up to 50 m of drillhole spacing within modelled I2 intrusive and volcanics.

Inferred: Up to 100 m of drillhole spacing within modelled I2 intrusive and volcanics.

Reasonable Prospects of Economic Extraction

The gold mineralization in the Monument Bay Project is considered to be primarily amenable to open pit

extraction. To determine the quantities of material offering "reasonable prospects for economic

extraction" by an open pit, SRK used a pit optimizer and reasonable mining assumptions to evaluate the

proportions of the block model that could be "reasonably expected" to be extracted from an open pit.

Tungsten: An Under-Evaluated Critical Mineral Opportunity

Tungsten was not included in the 2026 MRE. ONGold believes tungsten represents an important

additional exploration opportunity at Monument Bay because tungsten occurs within the broader

hydrothermal system associated with gold mineralization and has historically been under-evaluated

across portions of the drill database.

Tungsten occurs primarily as scheelite associated with quartz and quartz-albite veining, fractures and

stockwork vein systems and has been observed across multiple host lithologies. Recent geological and

assay work indicates that higher-grade tungsten can occur in association with higher-grade gold

mineralization domains in portions of the deposit.

ONGold's 2025-2026 re-logging, infill sampling and pulp re-analysis program added approximately

13,900 tungsten assays to the Monument Bay database, materially improving the Company's

understanding of tungsten distribution across the approximately 4.2-kilometre deposit. The program was

designed primarily to obtain tungsten analyses from historical samples that had previously been assayed

for gold but had not been systematically analyzed for tungsten.

Recent results include coincident gold and tungsten mineralization in several of the principal gold-

mineralized shoots associated with high-grade gold domains; as illustrated by the examples presented

in Table 2.

With the updated gold block model now available, ONGold can conduct a targeted "gap analysis" of

higher-grade gold domains to identify historical drill holes with missing tungsten assays. Future work will

focus on higher-grade gold-tungsten intercepts and on improving the understanding of the structural

controls and distribution of the associated metals. This work, together with additional structural studies of

historical and new drill core, is intended to determine whether sufficient continuity can be established to

support future tungsten domain modelling and resource evaluation.

Table 2: Examples of New Tungsten Assays from Historical Samples within High-Grade Gold

Domains (>1.0 g/t Au)

Shoot

Hole

Sample No.

From (m)

To (m)

Interval (m)

Au (g/t)

W (ppm)

Lake

TL-11-377

843533

222.00

223.00

1.00

2.81

744

TL-20-714

A0770622

131.90

132.45

0.55

5.14

4,590

TL-20-714

A0770629

137.60

138.00

0.40

1.82

5,480

TL-20-714

A0769558

143.50

144.00

0.50

1.79

560

Camp

TL-20-703

A0769561

144.90

145.55

0.65

22.30

2,700

TL-20-703

A0769566

147.00

147.30

0.30

9.55

4,530

TL-20-703

A0769570

147.80

148.30

0.50

7.09

569

TL-20-703

A0769548

136.00

136.70

0.70

1.82

1,260

TL-20-703

A0769559

144.00

144.45

0.45

3.02

1,050

TL-20-703

A0769568

147.30

147.80

0.50

2.76

1,110

TL-20-703

A0769571

148.30

148.77

0.47

4.60

3,650

TL-20-703

A0769572

148.77

149.07

0.30

2.83

6,350

TL-03-143

A563508

146.80

147.40

0.60

1.78

509

TL-03-132

318116

107.00

108.00

1.00

1.09

704

Simmons West

TL-20-708

A0769946

41.56

41.88

0.32

9.09

1,800

TL-20-708

A0769948

41.88

42.42

0.54

4.09

6,270

TL-20-708

A0769560

144.45

144.90

0.45

5.19

3,150

TL-11-419

1011799

89.00

90.00

1.00

2.82

1,410

Notes: All reported intervals are downhole core lengths. True widths are unknown at this time and will be refined with additional

structural modeling.

Historical metallurgical testing conducted in 2015 by Thibault & Associates Inc. indicated that the

Monument Bay gold-tungsten samples tested were amenable to flotation, as summarized in the technical

report on the Monument Bay Project dated May 30, 2025 (Barber, 2025). The historical testing was

preliminary in nature and may not be representative of mineralization across the deposit.

Tungsten is designated by the Government of Canada as a critical mineral, with applications including

defense, advanced manufacturing and other strategic industries.

Potential Resource Expansion or Conversion and Future Exploration

SRK has proposed an initial Phase I diamond drilling program consisting of approximately 20 holes

totaling 11,150 metres to test the continuity and extent of higher-grade gold domains in the central and

eastern parts of the deposit, including areas below and beyond the current conceptual open-pit shell.

Some of the high-grade domains fall outside of the open pit shell and could form the basis of a future pit

expansion at depth.

ONGold will review this proposed drill program and other drill targets within the

deposit to prepare a final drill program to advance the Monument Bay gold deposit.

ONGold generated an updated longitudinal section illustrating the revised geological interpretation of the

principal gold-mineralized shoots along the approximately 4.2-kilometre strike length of the deposit

(Figure 4). The interpretation identifies areas where historical drilling density is relatively limited and

which may warrant additional exploration drilling as depicted on the longitudinal section by red stars,

which depict examples of drill targets generated by ONGold, and blue stars, which depict the targeted

intercepts of drill holes proposed by SRK.

The section illustrates selected 10-metre drill-hole gold composites projected onto the longitudinal

section and the geological framework by ONGold; the line of section (A-B) represents an east-west

plane dipping 63 degrees to the north.

The figure is intended to illustrate the current geological

interpretation and exploration targets and should not be interpreted as representing a Mineral Resource

Estimate or predicting the results of future resource estimation.

Principal Exploration Observations

Six principal east-plunging mineralized shoots have been interpreted along the deposit, including

the Simmons Shoot West, Simmons Shoot, River Shoot, Camp Shoot, Lake Shoot West and Lake

Shoot (Figure 4).

Significant portions of the deposit remain largely untested by drilling below approximately 300

metres vertical depth from surface (Figure 4).

The eastern extension of the deposit remains relatively sparsely tested by historical drilling

(Figure

4)

Areas of relatively sparse drilling along strike, down plunge and at depth provide targets for future

drilling to further evaluate the continuity and extent of mineralization (Figure 4).

Gold mineralization has been interpreted to extend to surface in portions of the Simmons Shoot,

Camp Shoot and Lake Shoot West (Figure 4).

Figure 4: Longitudinal Section with Potential Drill Targets (ONGold, 2026)

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/10770/313830_7cf716cda4bb7a77_004full.jpg

Selected Historical Drill Result

In the eastern portion of the deposit, historical drill hole TL16-575 returned 6.15 g/t Au over a core length

of 132.0 metres (151.00 to 283.00), including 163.92 g/t Au over 2.75 metres (171.25 to 174.00) as

previously disclosed in the Company's news release dated March 2, 2026 (Figure 5). These reported

intervals are core lengths and true widths have not been determined. This historical result is one of the

drill intersections supporting the geological interpretation of the eastern portion of the deposit. SRK has

proposed that approximately half of its recommended initial drilling program be directed to the eastern

portion of the deposit, where historical drilling has identified higher-grade gold mineralization.

Additional

drilling is also being considered by ONGold to further evaluate the continuity and extent of gold

mineralization.

Figure 5: Drill Section 506350E - Lake Shoot, Eastern Monument Bay Deposit (ONGold, 2026)