Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OMM.V ·

Omineca Identifies Hardrock Gold Targets At Wingdam Placer Project

Exploration Programs

Omineca Identifies Hardrock Gold Targets At Wingdam Placer Project

Saskatoon, SK. February 7, 2019 – Omineca Mining and Metals Ltd. (TSXV: OMM)

(“Omineca” or the “Company”) reports that a UAV-MAG survey completed in August 2018 at the

Wingdam gold project in the Cariboo gold district of British Co lumbia has shown magnetic

lineaments that together with data compilation have developed drill targets for both the Wingdam

and Fraser Canyon properties. The 2018 exploration focussed on identifying bedrock hosted gold

targets as potential sources for placer gold historically found on these properties. Eight compelling

targets were identified bearing similar structural controls to the gold hosted at Barkerville Gold

Mine’s Cariboo project located 25 km east-northeast of Wingdam.

On the Wingdam property in 2012, the Company completed a bulk sample successfully recovering

5.4 kilograms of raw placer gold from a single 23.5 meter by 2. 44 meter wide drift across the

underground channel that runs 2.4 kilometers through the Wingdam hard rock and placer claims.

The Fraser Canyon property similarly has a long history of plac er mining dating back to the gold

rush of the late 1800’s. The exploration programs on Fraser Canyon will focus both on identifying

prospective placer gold as well as drilling potential hard rock gold targets displaying similar Riedel

style slip faults identified at Wingdam and analogous to Barkerville Gold’s Cariboo project.

The 2018 survey was flown by Pioneer Aerial Surveys Ltd. of Reg ina, SK with analysis and

compilation completed by Axiom Group of Companies Ltd. of Saskatoon, SK.

A total of 8 bedrock priority exploration targets were identifi ed by the program; four on the

Wingdam Property and four on the Fraser Canyon Property. Among the recommendations was to

drill several NW striking faults where they intersect NE trendi ng faults. Several areas of Riedel

style strike-slip deformation along NW trending regional faults were identified. This structural

pattern is indicative of Riedel style strike-slip deformation t hat would produce sub-vertical ore

chutes, similar structural controls of gold hosted at Barkerville.

Future work plans to be finalized include:

 A Resistivity/IP survey or VTEM survey on the areas of interest in the Wingdam and Fraser

Canyon project lands in order to prioritize prospective structural trends for future drilling.

 Drilling NW striking faults whe re they intersect NE trending fa ults identified. This

structural pattern is indicative of Riedel style strike-slip deformation that can produce sub-

vertical ore chutes, similar to structurally controlled gold at Barkerville Gold Mines’

Cariboo project.

 Completion of a 3D inversion of the 2018 UAV-MAG data from the Fraser Canyon

property, to apply in exploration for placer gold.

 Re-examination of the data from the 2013 Resistivity/IP survey to fine tune the magnetic

interpretation prior to drilling the targets on the Fraser Canyon property. A priority should

be given to lineaments interpreted to lie at an R’ orientation to the primary NW trend that

also have an associated IP response as this could be indicative of a mineralizing system.

Omineca is also pleased to announce the appointment of Dr. Stewart A. Jackson, PGeo. a Qualified

Person (“QP”) as defined by National Instrument 43-101, as a Technical Advisor to the Company.

Dr. Jackson has over 50 years experience in minerals exploration in a variety of deposit types, and

in many areas of the world. He has worked with both major and junior companies, as an employee

and as a principal. He is responsible for the discovery and de velopment of numerous mineral

deposits in particular a series of gold deposits, including the Buckhorn in the Republic District of

Washington produced by Kinross Gold, and the large Viken vanadi um-nickel-zinc-uranium

deposit in Sweden now under development by EU Energy.

About Omineca Mining and Metals Ltd.

Omineca Mining and Metals Ltd. controls a 100% interest in the Wingdam Project through its

wholly owned subsidiary CVG Mining Ltd. The 2700 ha Wingdam Project is located 45 km east

of Quesnel B.C. on the Barkerville highway and provides a uniqu e opportunity for Omineca to

develop near-term placer gold production in a proven mining district. The property overlies both

placer and hard-rock tenures along the Lightning Creek valley, where topographic conditions have

created a deep overburden accumulation which effectively resulted in a large portion of the channel

being excluded from conventional surface placer mining activity.

This press release was prepared and approved by Dr. Stewart A. Jackson, PGeo., a Qualified

Person as defined by National Instrument 43-101.

For further information, please contact:

Omineca Mining and Metals Ltd.

Tom MacNeill

President and CEO

306-653-2692

Forward Looking Statements 

This release includes forward‐looking statements regarding Omin eca and its business.  Such statements 

are based on the current expectations and views of future event s of Omineca’s management.  In some 

cases,  the  forward‐looking  statements  can  be  identified  by  words  or  phrases  such  as  “may”,  “will”, 

“expect”, “plan”, “anticipate”, “intend”, “potential”, “estimate”, “believe” or the negative of these terms, 

or other similar expressions intended to identify forward‐looking statements.  The forward‐looking events 

and circumstances discussed in this release may not occur and c ould differ materially as a result of the 

failure to consummate the project financing, the economic feasibility of the Wingdam Project, known and 

unknown risk factors and uncertainties affecting Omineca, including risks regarding the resource industry, 

economic  factors  and  the  equity  markets  generally  and  many  othe r  factors  beyond  the  control  of 

O m i n e c a .    N o  f o r w a r d ‐ l o o k i n g  s t a t e m e n t  c a n  b e  g u a r a n t e e d .    F o r ward‐looking  statements  and 

information by their nature are based on assumptions and involve known and unknown risks, uncertainties 

and other factors which may cause our actual results, performan ce or achievements, or industry results, 

to be materially different from any future results, performance  or achievements expressed or implied by 

such forward‐looking statement or information.  Accordingly, re aders should not place undue reliance on 

any forward‐looking statements or information.  Forward‐looking statements speak only as of the date on 

which they are made and Omineca undertakes  no  obligation to pub licly  update  or  revise  any  forward‐

looking statement, whether as a result of new information, future events, or otherwise, except as required 

by applicable securities laws. 

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the 

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this 

release.