Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OMM.V ·

Omineca Appoints Bill Van Breugel as Lead Technical Advisor for the Wingdam Underground Placer Recovery Project

Management Changes

Omineca Appoints Bill Van Breugel as Lead

Technical Advisor for the Wingdam

Underground Placer Recovery Project

SASKATOON, SK

,

June 8, 2021

/CNW/ - Omineca Mining and Metals Ltd. (TSXV: OMM)

("

Omineca

" or the "Company"), is pleased to announce that it has appointed Mr.

Bill Van Breugel

, P.

Eng., as the Company's Lead Technical Advisor for the Wingdam underground placer gold bulk

sampling program, currently underway and located 45 km east of

Quesnel, BC

, in the Cariboo

Mining District.

Working closely with Omineca's joint venture partner's management, engineers and underground

mining team, Mr.

Van Breugel

provides corporate oversight to the mine plan and engineering at the

Company's recently commenced underground placer gold sampling program (see news release of

April 29, 2021

).

Mr. Van Breugel is a mining engineer with over 40 years of experience in the mining industry. He

previously held the positions as: Senior Mine Engineer for Cameco's Cigar Lake project and

Kinross

Gold's

Hoyle Pond project; Engineering Lead at the BHP Jansen Project and Project Manager for

Goldcorp and Star Diamond Corporation.

2021 Wingdam Underground Gold Bulk Sample Program

The 2021 bulk sampling program is designed to continue the successful placer gold test sample

program initiated in 2012. That program utilized ground freeze technology to recover 173.4 ounces

of placer gold from a single 2.4-metre by 2.4-metre by 23.4-metre-long drift across the gold-bearing

paleochannel located approximately 50 metres beneath Lightning Creek. The initial phase of the bulk

sample program for 2021, includes the first 300 metres of 17,000 metres of potential paleochannel

on Omineca's claims.

About Omineca Mining and Metals Ltd.

Omineca Mining and Metals Ltd.'s flagship Wingdam gold exploration and placer recovery project is

located along the Barkerville Highway 45 km east of the town of

Quesnel

. The property includes

hard-rock tenures totaling over 50,000 hectares (500 square kms) and in excess of 15 linear

kilometers of placer claims, both encompassing the Lightning Creek valley where topographic

conditions created a thick overburden which preserved a large portion of an underground channel

with placer gold-bearing gravels. Omineca also has a diamond drill program currently underway

exploring for the potential multiple hard rock sources of the placer gold at Wingdam.

Forward Looking Statements

This release includes forward-looking statements regarding Omineca and its business. Such

statements are based on the current expectations and views of future events of Omineca's

management. In some cases, the forward-looking statements can be identified by words or

phrases such as "may", "will", "expect", "plan", "anticipate", "intend", "potential", "estimate",

"believe" or the negative of these terms, or other similar expressions intended to identify forward-

looking statements. The forward-looking events and circumstances discussed in this release may

not occur and could differ materially as a result of the failure to consummate the project financing,

the economic feasibility of the Wingdam Project, known and unknown risk factors and uncertainties

affecting Omineca, including risks regarding the resource industry, economic factors and the

equity markets generally and many other factors beyond the control of Omineca. No forward-

looking statement can be guaranteed. Forward-looking statements and information by their nature

are based on assumptions and involve known and unknown risks, uncertainties and other factors

which may cause our actual results, performance or achievements, or industry results, to be

materially different from any future results, performance or achievements expressed or implied by

such forward-looking statement or information. Accordingly, readers should not place undue

reliance on any forward-looking statements or information. Forward-looking statements speak only

as of the date on which they are made and Omineca undertakes no obligation to publicly update or

revise any forward-looking statement, whether as a result of new information, future events, or

otherwise, except as required by applicable securities laws.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

SOURCE

Omineca Mining and Metals Ltd

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/June2021/08/c1686.html

%SEDAR: 00031647E

For further information:

Tom MacNeill, President and CEO, 1 (306) 653-2692; Dean Nawata, Vice

President, Business Development, 1 (604) 561-2821, [email protected]

CO: Omineca Mining and Metals Ltd

CNW 08:30e 08-JUN-21