Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OMI.V ·

Pepas West Expanding

Corporate Updates

Pepas West Expanding

• Ongoing drilling at Pepas West continues to show positive results:

o PEP085, 16.1m @ 2.68g/t Au

o PEP087, 21.7m @ 1.42g/t Au

o PEP088, 9.8m @ 1.41g/t Au

o PEP090, 23.45m @ 2.98g/t Au

• Hole PEP090 stepped out 30m north of previous holes, demonstrating

extension potential.

• Rig currently drilling south of Pepas, will return to Pepas West in several

weeks.

• Hole MAP-106 at APTA now in the target zone.

London, May 13th, 2026. Orosur Mining Inc. (“Orosur” or the “ Company”)

(TSXV/AIM:OMI), is pleased to announce an update on the progress of exploration

activities at the Company’s exploration project at Anzá in Colombia (“Anzá” or the

“Project”).

Anzá – Colombia

The Anzá Project in Colombia comprises a number of granted exploration titles and

applications totalling roughly 330km2, within the Mid-Cauca gold belt, west of the city

of Medellín.

These titles and applications are owned by two Colombia n companies, Minera Anzá,

and Minera Monte Aguila, both wholly owned subsidiaries of the Company. The latter

of these was acquired by Orosur in November 2024 from the Company’s previous JV

partners, Newmont Mining and Agnico Eagle Mines. Orosur thus owns 100% of the

Anzá Project.

Since acquiring 100% control, the Company has focussed its attention on three

prospects:

• Pepas - a shallow, high -grade ore body of gold mineralisation for which the

Company has calculated a Mineral Resource Estimate (“MRE”), announced

February 10th 2026.

• APTA - a high-grade body of gold mineralisation that has to date seen almost

39,000m of historical drilling, and at which drilling has recently recommenced.

• El Cedro - a cluster of gold porphyry intrusions in the south of the Project area

that are currently subject to mapping and sampling programs, with a view to

potentially being drilled as soon as targets can be finalised and logistics

arranged.

Figure 1. Anzá Project

Pepas

The Company’s primary focus since reassuming control of the Project in late 2024,

was to explore the immediate area of Pepas, ultimately leading to the publication of a

maiden MRE for the Pepas gold deposit on February 10th, 2026.

This MRE was based upon drilling undertaken by the Company and its previous JV

partner from 2022 to late 2025 . Results from the final hole included in the MRE,

PEP074, were announced on January 8th, 2026.

Following completion of the MRE drillout in late 2025, the Company then embarked

on a semi-regional drilling program around the Pepas deposit. The objective of this

drilling program was to better understand the larger scale litho-structural controls that

led to formation of the Pepas deposit, such that, in combination with additional

mapping and sampling in the wider region, vectors toward additional minerali sation

might be developed.

As announced on April 14 th, 2026, a new zone of mineralisation, geologically similar

to Pepas, has been discovered approximately 100m west of the main Pepas zone.

This zone had been first identified in two drill holes from early 2025, but only returned

to in early 2026 once the Pepas MRE had been completed.

A number of holes (PEP082 to PEP090) have now been completed into this zone,

from various positions and in various directions, in order to gain some understanding

of the nature, orientation and controls upon this zone. Results thus far are highly

encouraging with thick intersections of shallow gold mineralisation being recorded.

Particularly encouraging was PEP090, drilled some 30m NW of previous holes,

demonstrating mineralisation over 100m in strike with untested strike extension.

Hole Number From (m) To (m) Interval

(m) Au (g/t)

PEP084 0 6.95 6.95 0.98

8.5 10.8 2.3 0.48

PEP085 0 3.7 3.7 0.63

14.95 31.05 16.1 2.68

including 20.9 26.25 5.35 4.18

PEP086 0 9.8 9.8 0.96

including 0 4.3 4.3 1.83

PEP087 9.4 31.1 21.7 1.42

including 19.05 27.8 8.75 2.28

PEP088 4.9 14.7 9.8 1.41

PEP089 6.9 11.15 4.25 0.38

PEP090 9.6 14.15 4.55 0.46

17.95 41.4 23.45 2.98

including 29.9 37.3 7.4 7.23

64.1 69.9 5.8 1.94

including 67.6 69.9 2.3 3.19

Table 1. Latest drill Intercepts, Pepas Prospect

As previously announced, after completion of hole PEP090, the rig operating at

Pepas has been moved southward to other targets, to allow time for geological and

assay information from Pepas West to be compiled. This is an ongoing process;

however, the Company’s geological team note that Pepas West is worthy of follow-

up and it is planned that the rig will return here in several weeks to begin to define

the size of this mineralised zone.

Figure 2. Plan of holes, Pepas West

Figure 3. Section PEP084,85,86

Figure 4. Section PEP087

Figure 5. Section PEP088

Figure 6. Section PEP090

APTA

The APTA prospect in the centre of the Project area has seen almost 39,000m of

drilling by various companies since 2012. This work has identified a substantial

epithermal gold system.

The last phase of drilling was undertaken by the Company’s previous JV partner ,

MMA, from late 2020 through early 2022, at which time the abatement of Covid related

operational restrictions allowed MMA field crews to begin to explore the wider Anzá

project area. Results from the final holes of this phase of work were announced on

27th June 2022.

A new phase of drilling was commenced some weeks ago, with hole MAP-106 planned

to assess several new geological concepts to assist in planning a larger drill campaign

that may, if successful, allow APTA to move to resource status.

Progress of MAP-106 has been very slow due to several zones of difficult and broken

ground. However, the hole is now well past 300m and within the target zone. Going

forwards, new drill pads are being devel oped in different locations such that these

issues are not repeated.

Orosur CEO Brad George commented:

“It is encouraging to see Anzá now beginning to delivery on its promise. Pepas now

has a resource, with more being found nearby, APTA being drilled and El Cedro yet

to come.”

For further information, visit www.orosur.ca, follow on X @orosurm or please contact:

Orosur Mining Inc

Louis Castro, Chairman,

Brad George, CEO

[email protected]

Tel: +1 (778) 373-0100

SP Angel Corporate Finance LLP – Nomad & Joint Broker

Caroline Rowe / Jen Clarke / Devik Mehta

Tel: +44 (0) 20 3470 0470

Turner Pope Investments (TPI) Ltd – Joint Broker

Andy Thacker/Guy McDougall

Tel: +44 (0)20 3657 0050

Flagstaff Communications and Investor Communications

Tim Thompson

Alison Allfrey

Fergus Mellon

[email protected]

Tel: +44 (0)207 129 1474

The information contained within this announcement is deemed by the Company to constitute inside

information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR') which has

been incorporated into UK law by the European Union (Withdrawa l) Act 2018. Upon the publication of

this announcement via Regulatory Information Service ('RIS'), this inside information is now considered

to be in the public domain.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies

of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Drill Hole Details – Pepas prospect 2022/2026 Programme*

Hole ID Easting (m) Northing (m) Elevation asl (m) Dip (°) Azimuth (°)

PEP-001 403384 705000 1001 -50 150

PEP-002 403384 705000 1001 -60 290

PEP-003 403240 705142 1001 -49.60 95.2

PEP-004 403508 705671 838 -59.8 99.8

PEP-005 403373 704990 1008 -49.8 94.6

PEP-007 403374 704990 1008 -69.9 170

PEP-008 403232 704803 971 -50 60

PEP-009 403032 705057 1055 -50 80

PEP-010 403375 705106 982 -50.31 190.4

PEP-011 403573 704939 1001 -50.3 255

PEP-012 403415 704890 997 -56 352

PEP-013 403413 704887 997 -50 43

PEP-014 403400 704910 1007 -50 43

PEP-015 403375 704938 1017 -50 43

PEP-016 403326 704912 999 -50 43

PEP-017 403365 704848 976 -40 47

PEP-018 403345 704851 977 -45 43

PEP-019 403446 704890 991 -45 43

PEP-020 403446 704890 991 -75 43

PEP-021 403424 704935 1012 -62 223

PEP-022 403424 704935 1012 -42 223

PEP-023 403245 704927 969 -50 43

PEP-024 403245 704927 969 -78 43

PEP-025 403369 704888 1001 -45 43

PEP-026 403339 704955 1008 -63 50

PEP-027 403468 704909 1003 -46 228

PEP-028 403398 704957 1012 -58 223

PEP-029 403311 705018 1011 -50 50

PEP-030 403311 705018 1011 -50 000

PEP-031B 403486 704901 998 -52 220

PEP-032 403431 704861 982 -60 15

PEP-033 403431 704861 982 -65 100

PEP-034 403431 704861 982 -45 315

PEP-035 403369 704882 996 -45 223

PEP-036 403311 705152 989 -45 30

PEP-037 403354 705227 958 -50 210

PEP-038 403332 705219 967 -45 128

PEP-039 403411 704798 957 -45 73

PEP-040 403369 704882 995 -80 212

PEP-041 403373 704936 1008 -50 3

PEP-042 403396 705038 716 -50 82

PEP-043 403298 704942 981 -50 43

PEP-044 403402 704948 1011 -62 33

PEP-045 403406 704949 1011 -60 223

PEP-046 403420 704933 1007 -53 43

PEP-047 403414 704927 1008 -74 223

PEP-048 403448 704922 1005 -54 043

PEP-049 403447 704920 1005 -55 223

PEP-050 403459 704905 1003 -45 43

PEP-051 403391 704928 1011 -61 43

PEP-052 403391 704928 1011 -87 43

PEP-053 403391 704929 1012 -60 223

PEP-054 403380 704954 1011 -52 43

PEP-055 403380 704954 1011 -86 223

PEP-056 403371 704970 1012 -61 43

PEP-057 403371 704970 1012 -71 223

PEP-058 403371 704970 1012 -85 223

PEP-059 403384 704976 1007 -59 43

PEP-060 403372 704908 1005 -55 43

PEP-061 403361 704988 1010 -80 223

PEP-062 403361 704988 1010 -61 43

PEP-063 403345 705005 1009 -50 80

PEP-064 403356 704923 1005 -51 43

PEP-065 403359 704949 1008 -59 43

PEP-065B 403359 704949 1008 -50 43

PEP-066 403423 704938 1009 -64 223

PEP-067 403400 704870 990 -53 43

PEP-068 403342 704989 1010 -56 43

PEP-069 403342 704987 1010 -80 218

PEP-070 403260 705071 1013 -50 30

PEP-071 403333 705005 1009 -51 90

PEP-072B 403435 704879 989 -70 43

PEP-073 403423 704917 1006 -50 307

PEP-074 403423 704917 1006 -60 127

PEP-075 403240 705267 946 -50 221

PEP-076 403240 705267 946 -60 042

PEP-077 403304 705228 959 -60 042

PEP-078 403304 705228 959 -60 222

PEP-079 403304 705228 959 -50 120

PEP-080 403093 705100 1026 -50 042

PEP-081 403215 705006 984 -55 032

PEP-082 403261 704941 977 -58 190

PEP-083 403267 704913 972 -45 342

PEP-084 403267 704913 972 -50 125

PEP-085 403267 704913 972 -50 310

PEP-086 403272 704910 979 -55 310

PEP-087 403262 704941 977 -50 260

PEP-088 403252 704946 979 -50 202

PEP-089 403252 704946 979 -50 202

PEP-090 403238 704980 976 -45 200

*Coordinates WGS84, UTM Zone 18