Orosur Mining Inc - Exceptional results at Pepas

Corporate Updates

Orosur Mining Inc - Exceptional results at Pepas

• Assays from nine more holes at Pepas and surrounds. Best results

include:

o PEP040 - 10.25m @ 1.35 g/t Au

o PEP041 - 31.75m @ 2.01 g/t Au

o PEP042 - 3.25m @ 4.89 g/t Au

o PEP044 - 38.50m @ 6.01 g/t Au

o PEP045 - 62.3m @ 12.76 g/t Au

o PEP046 - 53.2m @ 3.36 g/t Au

• Geological studies developing new concepts for later testing.

London, July 17 th 2025. Orosur Mining Inc. ("Orosur" or the

"Company") (TSXV/AIM:OMI), is pleased to announce an update on the

progress of exploration activities at the Company's flagship Anzá Project

("Project") in Colombia.

Colombia - ANZÁ Project

The Anzá Project is now 100% owned by the Company following completion of

a Share Purchase Agreement ("SPA"), announced 28 th November 2024,

whereby the Company purchased all of the shares of its previous JV partner;

Minera Monte Aguila ("MMA").

The Project, which is located 50km west of Medellin, is easily accessible and

boasts excellent infrastructure including water, power and communications as

well as a large exploration camp.

The Project sits within the prolific mid-Cauca belt, Colombia's primary gold belt,

and is located along strike between several world class gold/copper deposits

including Buritica, Quebradona and Guayabales/Marmato (Figure 1).

From September 2018 to November 2024, the Anzá Project was under the

control of its previous JV partner MMA, itself a 50/50 venture between the

world's two largest gold miners, Agnico Eagle Mines and Newmont Mining.

Figure 1. Mid-Cauca Belt

Prospects

The Company is currently focussed on three prospects within the Anzá Project

- Pepas, APTA and El Cedro. All three prospects are within the same granted

exploration title that is broken into two, non-contiguous pieces (Figure 2).

Drilling is currently being undertaken at the Pepas prospect in the northern

extent of the Anzá Project (pre-acquisition) over 10km north of the central base

camp at APTA. In parallel, mapping and sampling is being undertaken over the

El Cedro porphyry system in the south of the project area.

Figure 2. Main prospects, licences pre-MMA acquisition

Pepas Prospect

Pepas was discovered by MMA in late 2021 by BLEG sampling and geological

mapping, followed by 11 diamond drill holes in 2022 (PEP001 to PEP011).

After completion of the transaction to buy MMA ("Transaction"), the Company

restarted drilling at Pepas in late-November 2024.

Drilling commenced with hole PEP012, which was positioned to confirm

previous high-grade results in holes PEP001, PEP005 and PEP007 drilled in

2022.

Figure 3. Plan of holes

Drilling at Pepas, post Transaction, has largely concentrated on a small central

core, where a body of high -grade gold mineralisation is being defined from

surface. Additional drilling has also been undertaken around this central core

to understand the w ider geological context and as the commencement of a

larger scale exploration program.

Of the nine holes discussed in this announcement, six (PEP038 to PEP043)

were drilled around but outside the Pepas core, while three (PEP044 to

PEP046) have been drilled as part of the previously announced infill program

that is designed to move Pepas to a Mineral Resource Estimate (MRE).

PEP038 was drilled to the north at what is referred to as Pepas North. This was

the third of three holes drilled here as the first move to this area, following up

positive surface geochemical results. This hole was drilled orthogonal to the two

previous h oles, to provide the maximum lithological and structural

information. PEP038 returned a result of 16.8m @ 0.68g/t Au. As with the two

previous holes in this vicinity, this hole demonstrates the scale of the epithermal

system that hosts Pepas and has provided valuable information to understand

the controls of this system.

PEP039 was a speculative exploration hole drilled a substantial distance to the

south and west of the Pepas core, following up zones of surface silicification.

No substantial results were returned.

PEP040 was drilled outside the known Pepas envelope to the SW, to test lower-

level shallow mineralisation previously identified by earlier drilling. The hole

returned a small intersection of 10.25m @ 1.35g/t Au from surface (figure 4)

that indicates the potential for a body of satellite mineralisation, adjacent to the

Pepas core, that will require additional follow up.

Figure 4. PEP040 and PEP046 section

PEP041 was drilled outside the currently known Pepas envelope to the north to

test the northward extension of the mineralisation first identified by earlier

drilling undertaken by the Company's previous JV partner MMA. This hole

returned a positive intersection of 31.75m @ 2.01 g/t Au, opening this area for

potential extension (figure 5).

Figure 5. PEP041 Section

PEP042 was drilled to the NE of the currently known central core of

mineralisation as a conceptual hole to test geophysical zones that were

identified by the recent airborne magnetic survey. No surface geochemical work

has yet been undertaken in this area. Several thin zones of encouraging gold

mineralisation were encountered in this hole, well outside the known

mineralised core (figure 6). This result has substantially increased the potential

of this area and will now be followed up with surface mapping a nd sampling,

and potentially later drilling.

Figure 6. PEP042 Section

PEP043 was drilled outside the known mineralised envelope to test areas of

surface silicification. No substantial intersections were recorded

Holes PEP044, PEP045 and PEP045 were all drilled as part of the previously

announced MRE infill program at Pepas.

A plan for this program has been developed to infill Pepas to sufficient degree

to potentially allow a high level (measured and indicated) MRE to be calculate,

but also to assist in understanding the controls upon mineralisation and to better

define the ve ry high -grade zones that have the potential to add substantial

ounces.

Results from these holes were exceptional, with PEP044 returning 38.5m @

6.01g/t Au, PEP045 returning 62.3m @ 12.76g/t Au and PEP046 returning

53.2m @ 3.36g/t Au (figures 4 and 7).

The Company feels these results vindicate its decision to begin the resource

drilling phase at Pepas, with these exceptionally thick, and high -grade results,

substantially upgrading the potential for contained ounces beyond what had

been assumed at the commencement of the process. In addition, the results,

particularly that of PEP045, have provided valuable insight to the primary

controls upon this mineralisation, suggestive of the main feeder zone being a

series of steeply dipper structures along the SW margin of the zone. The depth

extent implications of this theory will be tested in later drilling

Figure 7. PEP044 and PEP045 section

Drill intersections for these most recent holes are as follows:

Hole Number From (m) To (m) Interval

(m) Au (g/t)

PEP038 0 16.8 16.8 0.68

PEP039 No significant intersections

PEP040 0 10.25 10.25 1.35

PEP041 34.35 66.1 31.75 2.01

including 37.2 43.75 6.55 4.62

PEP042 104.8 107.55 2.75 1.41

116.45 119.7 3.25 4.89

PEP043 No significant intersections

PEP044 5.8 44.3 38.5 6.01