Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OMI.V ·

Orosur Mining Inc – High grades continue at Pepas, El Cedro prospectivity developing.

Corporate Updates

Orosur Mining Inc – High grades continue at Pepas, El Cedro prospectivity

developing.

• Assays for six more holes from the Pepas MRE infill program include:

o PEP054 - 20.6m @ 2.01g/t Au

o PEP055 - 47.25m @ 15.25g/t Au

o PEP056 - 22.5m @ 1.64g/t Au

o PEP057 - 7.45m @ 3.05g/t Au and 17.1m @ 5.47g/t Au

o PEP058 - 34.85m @ 3.24g/t Au

• El Cedro soil program producing exceptional results.

London, September 9th, 2025. Orosur Mining Inc. (“Orosur” or the “ Company”)

(TSXV/AIM:OMI), is pleased to announce an update on the progress of exploration

activities at the Company’s flagship , 100% owned, Anzá Gold Project (“Project”) in

Colombia.

Anzá - Colombia

As announced on 14th July 2025, the Company took the formal decision to commence

infill drilling at its Pepas gold prospect at Anzá, with the objective of moving Pepas to

a NI43-101 compliant Mineral Resource Estimate (“MRE”) by the end of the year.

These six holes announced today are a continuation of this program and designed

largely to infill to the required spacing to allow an MRE to be calculated to a high level

of confidence, and to define and understand the nature of the ore body margins and

mineralising controls.

Results from these holes continue to firm up the Pepas orebody and provide better

definition of the nature of the thick, high -grade mineralisation . Recent results are

largely as expected in terms of the grade distribution across Pepas. However, PEP055

unexpectedly intersected an extremely high-grade vein at a downhole depth of only

30m, well beyond the grades that have thus far been encountered. While only narrow

(1.9m downhole width), this vein could be significant, and more work will be required

to understand its extent and thus its geological and MRE significance.

The MRE infill drill program is ahead of schedule, and subject to a mid-program review,

could be completed by late October 2025. Once complete, the rig will then move back

to exploration, either around Pepas, or at the APTA prospect to better understand the

newly evolving geological model there. This decision will be made in coming weeks.

A comprehensive metallurgical test program is currently being developed for Pepas,

with discussions underway with several laboratories in South and North America.

These plans are hoped to be finalised soon, and it is anticipated that one or two wider

diameter (PQ) metallurgical holes will be required to provide the necessary weight of

material for testing.

Hole Number From (m) To (m) Interval (m) Au (g/t)

PEP054 20 40.6 20.6 2.01

including 33.1 39.6 6.5 3.29

PEP055 22.05 69.3 47.25 15.25**

Including 27.85 41.8 13.95 45.99**

Including 29 30.9 1.9 303.25**

PEP056 6 28.5 22.5 1.64

including 22.8 28.5 5.7 3.78

PEP057 2.95 4.85 1.9 1.19

10.85 18.3 7.45 3.05

including 10.85 12.5 1.65 12.31

29.8 46.9 17.1 5.47

including 32.85 41.1 8.25 8.85

including 35.8 37.8 2 26.55

PEP058 9.75 18.65 8.9 0.62

32.95 67.8 34.85 3.42

including 38.9 59 20.1 4.7

PEP059 13.4 27.6 14.2 0.75

Table 1. Latest drill Intercepts, Pepas Prospect

** see section below on coarse gold

Figure 1. Plan of holes

Figure 2. Section, PEP054, 055

Figure 3. Section PEP056, 057, 058, 059

Coarse Gold – PEP055

The quoted composite assay result from PEP055 of 47.25m @ 15.25g/t Au has been

influenced by two consecutive high-grade samples across 1.9m in which visible gold

was noted in core . These two consecutive samples returned 465.71g/t Au and

122.74g/t Au respectively. Outside these two samples, grades assayed were largely

in line with adjacent holes.

The Company feels that these two samples represent a real, and very high-grade vein,

but are also cognisant that coarse gold has the potential to create a sampling bias if

incorrect sample preparation has resulted in heterogenous distribution of gold

throughout the sample.

To assess the potential impact of this, pulps from these two samples were re-assayed

twice, with reasonably consistent results (table 2). The Company is therefore confident

that no significant sampling bias has occurred. Geologically however, such high-grade

samples are a statistical outlier and will require further understanding so that their

impact on a MRE is accurately reflected.

Sample Original assay Re-assay 1 Re-assay 2

Sample 1 - 1m 465.71ppm 453.19ppm 478.23ppm

Sample 2 - 0.9m 122.74ppm 121.16ppm 124.33ppm

Table 2. Coarse gold re-assay

El Cedro - Anzá, Colombia

The El Cedro prospect is a large gold porphyry/epithermal system, located toward the

south of the Anzá project, on the same granted exploration title as the Pepas and

APTA deposits.

El Cedro had been explored in cursory fashion by Anglo American, prior to Orosur

taking ownership of the Project in late 2014 , with a dditional mapping and ground

geophysics then carried out by the Company’s previous JV partner MMA in 2022 and

2023.

No drilling has ever been undertaken on the prospect.

The region has sparse outcrop, but a large porphyry system had been identified and

roughly defined from regional mapping and more recent airborne magnetic and

radiometric data. Several phases of soil geochemical surveys were carried out in the

centre of the prospect, around a central core of potassic alteration visible from airborne

radiometrics, and in nearby creeks where fresh rock had been exposed.

A large area of anomalous soils was historically sampled in the centre of the prospect

with numerous high grade rock chip and channel samples of between 1 and 9 g/t Au

in surrounding creeks in later stage polymetallic veins (Figure 4).

To better define the scope and nature of El Cedro, the Company recently commenced

a wider scale ridge and spur soil sampling program over the entire extent of what is

thought to be the porphyry system. Being rugged terrain, sampling was limited to

ridges and spurs to ensure that sampled material is residual and insitu.

Figure 4. El Cedro prospect– previous sampling (Anglo and MMA) and sampling plan

After a brief pause due to limited access during the wet season, this program has

recommenced and is now approximately 65% complete.

Figure 5. Orosur soil sampling, El Cedro - progress

Gold assay results thus far are highly encouraging with large areas of over 0.3g/t Au

and at times over 1g/t Au being identified in soils and saprolite around a central core.

Geological mapping being undertaken in conjunction with the soil program is also now

better defining the porphyry system and the associated vein systems. Base metals

associations have also been noted in outcrop, however, base metal assays require a

different assay method not available in Colombia and these will require several weeks

to be returned.

The Company feels the ongoing work program is showing El Cedro as a complex and

highly prospective gold porphyry system. Once this current program is complete in

coming weeks, all data will be compiled with a view to planning the next phase of work,

which could involve drilling.

Orosur CEO Brad George commented:

“The Anza Project continues to develop and broaden in scope. Pepas is progressing

toward MRE as planned, but the results at El Cedro are showing this licence has much

more to give”.

Colombia - ANZÁ Project

The Anzá Project is now 100% owned by the Company following completion of a

Share Purchase Agreement ( “SPA”), announced 28 th November 2024, whereby the

Company purchased all of the shares of its previous JV partner; Minera Monte Aguila

(“MMA”).

The Project, which is located 50km west of Medellin , is easily accessible and boasts

excellent infrastructure including water, power and communications as well as a large

exploration camp.

From September 2018 to November 2024, the Anzá Project was under the control of

its previous JV partner MMA, itself a 50/50 venture between the world ’s two largest

gold miners, Agnico Eagle Mines and Newmont Mining.

Prospects

The Company is currently focussed on three prospects within the Anzá Project –

Pepas, APTA and El Cedro. All three prospects are within the same granted

exploration title that is broken into two, non-contiguous pieces (Figure 5)

Drilling is currently being undertaken at the Pepas prospect in the northern extent of

the Anzá Project (pre-acquisition) over 10km north of the central base camp at APTA.

In parallel, mapping and sampling is being undertaken over the El Cedro porphyry

system in the south of the project area.

Figure 6. Main prospects, licences pre-MMA acquisition

Holes Drilled post MMA Transaction

48 holes have been drilled at Pepas since the MMA Transaction in November 2024.

Assay results are tabulated below.

Hole Number From (m) To (m) Interval (m) Au (g/t)

PEP012 0 66.75 66.75 5.64

PEP013 0 77.30 77.30 7.68

PEP014 0 75.1 75.1 5.58

PEP015 23.5 63.7 40.2 3.75

PEP016 61.6 105.3 43.7 3.13

PEP017 56.1 96.3 40.2 2.06

PEP018 0 54.1 54.1 6.01

PEP019 0 44.3 44.3 1.63

PEP020 0 54.65 54.65 1.94

PEP021 0 107.05 107.05 6.22

PEP022 0 76.3 76.3 7.24

PEP023 0 15 15 1.7

PEP024 9.24 15.6 6.35 1.99

PEP025 0 10.1 10.1 1.45

16.5 79 62.5 5.4

PEP026 0 14.8 14.8 0.57

43.6 72 28.4 2.52

PEP027 1 80.15 79.15 2.0

PEP028 29.5 60.85 31.35 1.61

PEP029 0 30.7 30.7 0.31

PEP030 0 77.9 77.9 0.32

115.6 122.6 7 0.31

PEP031B 28.15 41.1 12.95 0.73

74.1 95.9 20.8 0.3

PEP032 0 92 92 1.68

PEP033 0 21.3 21.3 5.88

PEP034 36 95 59 10.15

PEP035 0 11.4 11.4 2.71

PEP036B 0 40.45 40.45 0.62

PEP037 0 3 3 0.65

PEP038 0 16.8 16.8 0.68

PEP039 No significant intersections

PEP040 0 10.25 10.25 1.35

PEP041 34.35 66.1 31.75 2.01

PEP042 104.8 107.55 2.75 1.41

116.45 119.7 3.25 4.89

PEP043 No significant intersections

PEP044 5.8 44.3 38.5 6.01

PEP045 9.5 71.8 62.3 12.76

PEP046 0 53.2 53.2 3.36

PEP047 0 104 104 6.61

PEP048 0 32.3 32.3 3.65

PEP049 0 94.2 94.2 3.74

PEP050 0 34 34 2.33

PEP051 0 7.4 7.4 0.43

11.2 72.5 61.3 3.36

PEP052 0 4.4 4.4 2.24

9.4 81.25 71.85 6.13

PEP053 17 27.1 10.1 0.9

PEP054 20 40.6 20.6 2.01

PEP055 22.05 69.3 47.25 15.25

PEP056 6 28.5 22.5 1.64

PEP057 10.85 18.3 7.45 3.05

29.8 46.9 17.1 5.47

PEP058 32.95 67.8 34.85 3.42